Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Parcel Search: 141177510
Parcel Search
Parcel Attributes
| Parcel | 141177510 |
|---|---|
| Jurisdiction | Tucson, Pima County |
| Water Course | Wash |
| City of Tucson Zoning | I-2 |
| Tucson Ward | Ward 4 |
| Tucson Registered Neighborhood | Rita Ranch |
| Major Street & Route | Scenic Route |
| Pima County Data | Assessor, Recorder, Treasurer, ... |
| Parcel Map | Map |
| Address | |
| Parcel Attributes Issue? | |
Annexations & Original City Zoning (OCZ)
Date - 12/08/2025 4:11 a.m.
Total Number Of OZC Plans - (1)
Permits
Parcel Number - 141177510
Date - 12/08/2025 4:11 a.m.
Total Number Of Permits - (6)
| Permit | Permit Status | Entered Date | Expired Date | Unit | Type | Description |
|---|---|---|---|---|---|---|
| TR-ROW-0724-00783 | Complete | 07/11/2024 | 08/21/2024 | Right-of-Way (ROW) | Install 6’ W X 200’ L of new sidewalk.*** PREVIOUS PERMIT TR-ROW-0224-00183 (Sewer Work) | |
| TC-CFO-0924-00187 | Denied | 09/06/2024 | N/A | Certificate of Occupancy | When requesting TCO please request under TC-CFO-0924-00189. Pay TCO extension under TC-CFO-0924-00189 This project needs the okay for a Temporary Certificate of Occupancy and building level from a Building and Engineering Inspector. And a Water Sterilization Report is needed prior to TCO. Please schedule inspections and submit Water Sterilization Report. Once both inspectors have given an okay for TCO and Water Sterilization Report is submitted and satisfied re-request TCO. If you have any questions, please get in touch with building_official@tucsonaz.gov Ground-up car wash tunnel and associated facilities | |
| TC-CFO-0924-00189 | Issued | 09/09/2024 | 02/10/2025 | Certificate of Occupancy | Ground-up car wash tunnel and associated facilities | |
| TR-ROW-1024-01218 | Complete | 10/16/2024 | 11/20/2024 | Right-of-Way (ROW) | On the southwest side remove and replace 20’ of asphalt path and replace with 30’ of new standard concrete sidewalk. On the southeast side remove 30’ of asphalt path and replace with 30’ of new asphalt.*** | |
| T22CM08170 | Complete | 10/20/2022 | 07/29/2025 | Commercial Building | Ground-up car wash tunnel and associated facilities | |
| TR-ROW-1224-01418 | Complete | 12/11/2024 | 01/17/2025 | Right-of-Way (ROW) | Refresh Existing Center Line, Turn Line and Stop Bar per City of Tucson Drawing. |