Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Parcel Search

 
Parcel Attributes
Parcel141148180
JurisdictionTucson, Pima County
City of Tucson ZoningC-1
Tucson WardWard 4
Tucson Registered NeighborhoodRita Ranch
Major Street & Route

Gateway Route
-
Intersection Buffer

Pima County Data Assessor, Recorder, Treasurer, ...
Parcel Map Map
Address
Parcel Attributes Issue?

Annexations & Original City Zoning (OCZ)

Date - 12/20/2025 10:23 a.m.
Total Number Of OZC Plans - (1)
Plan Description Annexation Ordinance Effective Date OCZ Ordinance
C9-64-84 Area 7 6142 01/17/1985 6143

Special Development Requests & Requirements

Date - 12/20/2025 10:23 a.m.
Total Number Of Special Development Permits - (2)
Activity Number Status Apply Date Expired Date Type Description
H000009103 Closed N/A
T11SA00357 Complete N/A

Permits

Parcel Number - 141148180
Date - 12/20/2025 10:23 a.m.
Total Number Of Permits - (426)
Permit Permit Status Entered Date Expired Date Unit Type Description
TR-UTL-0223-00853 Complete 02/13/2023 09/24/2023 Right-of-Way (ROW) - Utility PRJ242537-4-RL-5916-City of Tucson CIP SR14-Valencia Rd project. Trench 20' South from existing pedestal location to relocate to new pedestal location per CIP.
TS-PRM-0523-00294 Issued 05/03/2023 10/30/2023 UNIT 160 Sign - Permanent Flush mount led illuminated channel lettering
TF-FCP-0524-00393 Complete 05/21/2024 11/30/2024 UNIT 150 Fire Construction Permit To add 9-ea. sprinkler heads for drop ceiling.
T20CM05848 Expired 09/03/2020 N/A 130 Commercial Building PLUMBING ADDED FOR SINK
T18OT01007 Submitted 09/19/2018 N/A Sign - Permanent 3 wall signs on east elevation (facing Nexus)
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 1 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 1 UNIT 1101 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 1 UNIT 1102 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 1 UNIT 1103 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 1 UNIT 1104 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 1 UNIT 1105 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 1 UNIT 1106 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 1 UNIT 1107 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 1 UNIT 1108 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 1 UNIT 1201 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 1 UNIT 1202 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 1 UNIT 1203 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 1 UNIT 1204 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 1 UNIT 1205 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 1 UNIT 1206 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 1 UNIT 1207 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 1 UNIT 1208 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 10 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 10 UNIT 10101 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 10 UNIT 10102 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 10 UNIT 10103 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 10 UNIT 10104 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 10 UNIT 10105 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 10 UNIT 10106 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 10 UNIT 10107 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 10 UNIT 10108 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 10 UNIT 10201 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 10 UNIT 10202 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 10 UNIT 10203 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 10 UNIT 10204 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 10 UNIT 10205 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 10 UNIT 10206 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 10 UNIT 10207 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 10 UNIT 10208 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 11 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 11 UNIT 11101 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 11 UNIT 11102 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 11 UNIT 11103 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 11 UNIT 11104 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 11 UNIT 11105 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 11 UNIT 11106 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 11 UNIT 11107 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 11 UNIT 11108 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 11 UNIT 11201 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 11 UNIT 11202 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 11 UNIT 11203 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 11 UNIT 11204 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 11 UNIT 11205 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 11 UNIT 11206 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 11 UNIT 11207 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 11 UNIT 11208 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 11 UNIT 11301 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 11 UNIT 11302 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 11 UNIT 11303 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 11 UNIT 11304 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 11 UNIT 11305 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 11 UNIT 11306 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 11 UNIT 11307 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 11 UNIT 11308 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 12 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 12 UNIT 12101 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 12 UNIT 12102 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 12 UNIT 12103 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 12 UNIT 12104 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 12 UNIT 12105 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 12 UNIT 12106 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 12 UNIT 12107 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 12 UNIT 12108 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 12 UNIT 12201 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 12 UNIT 12202 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 12 UNIT 12203 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 12 UNIT 12204 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 12 UNIT 12205 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 12 UNIT 12206 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 12 UNIT 12207 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 12 UNIT 12208 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 12 UNIT 12301 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 12 UNIT 12302 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 12 UNIT 12303 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 12 UNIT 12304 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 12 UNIT 12305 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 12 UNIT 12306 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 12 UNIT 12307 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 12 UNIT 12308 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 13 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 13 UNIT 13101 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 13 UNIT 13102 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 13 UNIT 13103 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 13 UNIT 13104 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 13 UNIT 13105 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 13 UNIT 13106 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 13 UNIT 13107 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 13 UNIT 13108 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 13 UNIT 13201 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 13 UNIT 13202 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 13 UNIT 13203 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 13 UNIT 13204 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 13 UNIT 13205 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 13 UNIT 13206 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 13 UNIT 13207 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 13 UNIT 13208 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 13 UNIT 13301 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 13 UNIT 13302 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 13 UNIT 13303 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 13 UNIT 13304 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 13 UNIT 13305 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 13 UNIT 13306 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 13 UNIT 13307 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 13 UNIT 13308 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 14 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 14 UNIT 14101 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 14 UNIT 14102 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 14 UNIT 14103 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 14 UNIT 14104 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 14 UNIT 14105 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 14 UNIT 14106 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 14 UNIT 14107 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 14 UNIT 14108 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 14 UNIT 14201 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 14 UNIT 14202 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 14 UNIT 14203 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 14 UNIT 14204 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 14 UNIT 14205 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 14 UNIT 14206 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 14 UNIT 14207 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 14 UNIT 14208 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 14 UNIT 14301 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 14 UNIT 14302 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 14 UNIT 14303 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 14 UNIT 14304 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 14 UNIT 14305 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 14 UNIT 14306 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 14 UNIT 14307 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 14 UNIT 14308 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 15 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 15 UNIT 15101 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 15 UNIT 15102 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 15 UNIT 15103 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 15 UNIT 15104 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 15 UNIT 15105 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 15 UNIT 15106 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 15 UNIT 15107 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 15 UNIT 15108 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 15 UNIT 15201 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 15 UNIT 15202 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 15 UNIT 15203 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 15 UNIT 15204 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 15 UNIT 15205 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 15 UNIT 15206 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 15 UNIT 15207 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 15 UNIT 15208 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 15 UNIT 15301 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 15 UNIT 15302 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 15 UNIT 15303 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 15 UNIT 15304 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 15 UNIT 15305 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 15 UNIT 15306 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 15 UNIT 15307 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 15 UNIT 15308 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 16 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 16 UNIT 16101 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 16 UNIT 16102 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 16 UNIT 16103 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 16 UNIT 16104 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 16 UNIT 16105 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 16 UNIT 16106 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 16 UNIT 16107 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 16 UNIT 16108 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 16 UNIT 16201 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 16 UNIT 16202 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 16 UNIT 16203 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 16 UNIT 16204 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 16 UNIT 16205 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 16 UNIT 16206 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 16 UNIT 16207 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 16 UNIT 16208 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 16 UNIT 16301 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 16 UNIT 16302 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 16 UNIT 16303 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 16 UNIT 16304 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 16 UNIT 16305 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 16 UNIT 16306 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 16 UNIT 16307 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 16 UNIT 16308 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 17 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 18 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 2 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 2 UNIT 2101 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 2 UNIT 2102 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 2 UNIT 2103 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 2 UNIT 2104 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 2 UNIT 2105 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 2 UNIT 2106 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 2 UNIT 2107 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 2 UNIT 2108 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 2 UNIT 2201 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 2 UNIT 2202 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 2 UNIT 2203 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 2 UNIT 2204 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 2 UNIT 2205 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 2 UNIT 2206 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 2 UNIT 2207 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 2 UNIT 2208 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 2 UNIT 2301 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 2 UNIT 2302 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 2 UNIT 2303 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 2 UNIT 2304 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 2 UNIT 2305 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 2 UNIT 2306 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 2 UNIT 2307 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 2 UNIT 2308 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 3 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 3 UNIT 3101 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 3 UNIT 3102 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 3 UNIT 3103 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 3 UNIT 3104 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 3 UNIT 3105 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 3 UNIT 3106 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 3 UNIT 3107 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 3 UNIT 3108 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 3 UNIT 3201 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 3 UNIT 3202 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 3 UNIT 3203 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 3 UNIT 3204 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 3 UNIT 3205 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 3 UNIT 3206 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 3 UNIT 3207 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 3 UNIT 3208 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 4 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 4 UNIT 4101 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 4 UNIT 4102 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 4 UNIT 4103 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 4 UNIT 4104 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 4 UNIT 4105 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 4 UNIT 4106 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 4 UNIT 4107 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 4 UNIT 4108 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 4 UNIT 4201 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 4 UNIT 4202 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 4 UNIT 4203 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 4 UNIT 4204 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 4 UNIT 4205 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 4 UNIT 4206 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 4 UNIT 4207 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 4 UNIT 4208 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 5 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 5 UNIT 5101 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 5 UNIT 5102 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 5 UNIT 5103 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 5 UNIT 5104 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 5 UNIT 5105 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 5 UNIT 5106 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 5 UNIT 5107 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 5 UNIT 5108 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 5 UNIT 5201 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 5 UNIT 5202 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 5 UNIT 5203 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 5 UNIT 5204 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 5 UNIT 5205 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 5 UNIT 5206 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 5 UNIT 5207 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 5 UNIT 5208 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 6 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 6 UNIT 6101 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 6 UNIT 6102 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 6 UNIT 6103 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 6 UNIT 6104 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 6 UNIT 6105 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 6 UNIT 6106 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 6 UNIT 6107 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 6 UNIT 6108 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 6 UNIT 6201 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 6 UNIT 6202 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 6 UNIT 6203 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 6 UNIT 6204 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 6 UNIT 6205 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 6 UNIT 6206 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 6 UNIT 6207 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 6 UNIT 6208 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 7 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 7 UNIT 7101 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 7 UNIT 7102 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 7 UNIT 7103 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 7 UNIT 7104 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 7 UNIT 7105 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 7 UNIT 7106 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 7 UNIT 7107 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 7 UNIT 7108 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 7 UNIT 7201 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 7 UNIT 7202 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 7 UNIT 7203 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 7 UNIT 7204 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 7 UNIT 7205 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 7 UNIT 7206 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 7 UNIT 7207 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 7 UNIT 7208 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 8 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 8 UNIT 8101 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 8 UNIT 8102 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 8 UNIT 8103 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 8 UNIT 8104 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 8 UNIT 8105 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 8 UNIT 8106 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 8 UNIT 8107 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 8 UNIT 8108 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 8 UNIT 8201 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 8 UNIT 8202 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 8 UNIT 8203 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 8 UNIT 8204 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 8 UNIT 8205 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 8 UNIT 8206 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 8 UNIT 8207 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 8 UNIT 8208 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 9 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 9 UNIT 9101 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 9 UNIT 9102 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 9 UNIT 9103 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 9 UNIT 9104 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 9 UNIT 9105 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 9 UNIT 9106 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 9 UNIT 9107 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 9 UNIT 9108 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 9 UNIT 9201 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 9 UNIT 9202 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 9 UNIT 9203 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 9 UNIT 9204 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 9 UNIT 9205 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 9 UNIT 9206 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 9 UNIT 9207 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 9 UNIT 9208 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 UNIT 100 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 UNIT 106 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 UNIT 110 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 UNIT 112 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 UNIT 118 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 UNIT 120 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 UNIT 124 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 UNIT 130 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 UNIT 136 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 UNIT 140 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 UNIT 142 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 UNIT 150 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 UNIT 160 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 UNIT 166 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 UNIT 172 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 UNIT 178 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 UNIT 184 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 UNIT 188 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 UNIT 196 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TS-PRM-1124-00502 Inspections complete 11/18/2024 07/07/2025 UNIT 150 Sign - Permanent Front Lit Pan Channels mounted on wall
T02AN00823 Issued 09/06/2002 N/A ADDRNEW
T03AN00926 Issued 09/16/2003 N/A #120 ADDRNEW
T03AN00953 Issued 09/24/2003 N/A #130 ADDRNEW
T03AN00968 Issued 09/29/2003 N/A #100 ADDRNEW
T03AN00988 Issued 10/01/2003 N/A #150 ADDRNEW
T03BU00412 Final 02/14/2003 03/21/2004 GRADING GRADING:1300CY CUT & 50CY FILL
T03BU01771 Final 07/08/2003 03/27/2004 SPKLR FIRE:SPKR NEW 108
T03BU01947 Final 07/30/2003 02/23/2004 SPKLR FIRE SPKR:INSTALL 230LF OF 4" PIPE
T03BU02638 C of o 10/10/2003 04/20/2004 #120 BUILD TI:RETAIL- WALL
T03BU02886 Final 11/06/2003 06/05/2004 #160 SPKLR FIRE SPKR:RELOCATE 7
T03BU03125 Final 12/12/2003 08/23/2004 #100 BUILD FIRE SPKR:KITCHEN EXHAUST SYSTEM
T03CM00269 Final 01/22/2003 03/08/2005 COMBO NEW:RETAIL SHELL
T03CM02534 C of o 05/23/2003 06/21/2004 #160 COMBO TI:COFFEE SHOP
T03CM03776 Withdrwn 07/30/2003 N/A #150 COMBO TI:RETAIL
T03CM04686 C of o 09/29/2003 08/24/2004 #100 COMBO TI:RESTAURANT
T03CM04756 C of o 10/01/2003 06/05/2004 #150 COMBO TI:RETAIL
T03CM04966 C of o 10/16/2003 08/02/2004 #110 COMBO TI:RETAIL
T03EX00929 Closed 08/25/2003 10/24/2003 EXCAV EXCAV:150 LF TEP TRENCH
T03OT01649 Final 09/18/2003 04/27/2004 #130 SIGN SIGN:6046
T03OT01692 Final 09/23/2003 06/05/2004 #150 SIGN SIGN:#6083
T03OT01704 Final 09/25/2003 08/08/2004 #100 SIGN SIGN:6094
T03OT01733 C of o 09/30/2003 04/17/2004 #130 C-OF-O C OF O:CURVES
T03OT01843 Final 10/17/2003 05/22/2004 #110 SIGN SIGN:6191
T03OT01862 Final 10/21/2003 11/29/2004 #130 SIGN SIGN:6201
T03OT01944 Final 11/04/2003 05/19/2004 #120 SIGN SIGN:ELECTRIC:6267
T03OT01945 Final 11/04/2003 06/19/2004 #120 SIGN SIGN:6266
T03OT01976 Final 11/07/2003 07/05/2004 #160 SIGN SIGN:ELECTRIC:6289
T04BU00419 Final 02/24/2004 08/23/2004 #100 SPKLR FIRE SPRINKLER:RELOCATE 5
T05AN00471 Issued 04/29/2005 N/A #140 ADDRNEW
T05CM01903 Expired 04/29/2005 12/12/2005 #140 COMBO TI: COMMERCIAL CHECK CASH NO INTERIOR CONSTRUCTION, MILLWORK AND 5' HIGH OFFICE PARTITIONS ONLY, REMAINDER COMPLETED WITH SHELL STRUCTURE, PER PLANS.
T05EL01116 Expired 06/03/2005 12/06/2005 #140 ELECT RECONNECT ELECTRIC
T05OT01636 Final 07/01/2005 02/12/2006 #140 SIGN BANNER: 9287 CHECK INTO CASH
T05OT01637 Expired 07/01/2005 05/24/2006 #140 SIGN SIGN: CHECK INTO CASH 9288
T06OT00469 Final 02/16/2006 01/16/2007 #160 SIGN 10667
T08BU01875 Final 10/20/2008 05/13/2009 #150 SPKLR Relocate 2 fire sprinkler heads.
T08CM03268 Final 10/03/2008 05/03/2009 #120 COMBO TI: H & R BLOCK (#120)
T08CM03510 Final 10/30/2008 05/12/2009 #150 COMBO TI: RETAIL (#150)
T08OT00525 Final 03/06/2008 10/06/2008 #120 SIGN 14579
T08OT00526 Final 03/06/2008 12/06/2008 SIGN 14578
T08OT02443 Expired 10/14/2008 07/08/2009 #120 SIGN 15741
T08OT02463 Final 10/15/2008 09/14/2010 #120 SIGN 15747
T08OT02704 Final 11/17/2008 06/20/2009 #150 SIGN 15913
T08OT02962 Expired 12/18/2008 02/01/2009 #150 SIGN 16069
T09OT00552 Final 03/19/2009 11/10/2009 #160 SIGN 16432
T09OT00553 Final 03/19/2009 10/31/2009 #160 SIGN 16431
T09OT00605 Final 03/27/2009 09/26/2009 #160 SIGN 16446
T09OT00960 Final 05/15/2009 11/15/2009 #150 SIGN 16660
T10BU01534 Final 10/06/2010 05/18/2011 #140 SPKLR Add 17 fire sprinklers
T10BU01800 Final 12/07/2010 06/08/2011 #140 BUILD INSTALL:FIRE HOOD SYSTEM
T10BU01819 Final 12/09/2010 06/08/2011 BUILD MODIFICTION TO EXISTING ALARM SYSTEM
T10CM01649 C of o 06/17/2010 06/07/2011 #140 COMBO TI & C OF O: RESTAURANT
T10CM02707 Void 09/29/2010 N/A #140 COMBO TI:RESTAURANT LITTLE CEASARS
T10OT01767 Final 08/19/2010 02/28/2011 #130 SIGN 18771
T10OT02316 Final 10/27/2010 05/09/2011 #140 SIGN CHANGE OF COPY 19066
T10OT02617 Final 12/09/2010 07/24/2011 #140 SIGN BANNER; 45 DAY, FROM 12/09/10 - 01/23/11
T11OT01295 Final 06/29/2011 04/29/2012 #120 SIGN BANNER: 90 DAYS START: 06/29/11 END: 09/27/11
T11OT02051 Final 11/01/2011 05/14/2012 SIGN BANNER 9/28/11 TO 11/12/11
T12CM06735 Final 10/22/2012 04/24/2013 #160 COMBO RECONNECT ELECTRIC; COMMERCL
T12OT00924 Denied 06/20/2012 03/25/2013 #120 SIGN BANNER; 90 DAY, 06/25/12 - 09/23/12
T13OT01373 Expired 11/19/2013 05/25/2014 #120 SIGN 2- ILLUM WALL SIGNS
T14OT01458 Final 11/19/2014 10/05/2015 #120 SIGN BANNER 90 DAY: 01/15/2015 TO 04/15/2015
T15CM06032 Withdrwn 08/28/2015 N/A COMBO TI: NEW INTERIOR WALLS
T15OT00155 Final 02/03/2015 08/12/2015 #120 SIGN A-FRAME SIGN TRE
T18OT01074 Final 10/11/2018 05/29/2019 SIGN 3-ILLUM WALL SIGNs
T18RW02776 Final 06/20/2018 08/19/2018 ROW Starting on the S/W corner of E. Valencia Rd and Nexus Pull through Existing Conduit going East for 125', Trench /bore South for 85' placing another 3x3x3 pothole for New Vault , trench East 5' Placing New Fiber Cabinet . ( Cir 276093)
T18RW04193 Final 09/18/2018 11/17/2018 ROW Starting on the S/W corner of E. Valencia Rd and Nexus Pull through Existing Conduit going East for 125', Trench /bore South for 85' placing another 3x3x3 pothole for New Vault , trench East 5' Placing New Fiber Cabinet . ( Cir 276093)
T18RW04539 Final 10/08/2018 11/10/2018 ROW POTHOLING FOR FUTURE DEVELOPEMENT ADDRESS ON APPLICATION-VALENCIA EAST OF NEXUS, NORTH OF RITA RD
T20OT00540 Final 08/06/2020 02/13/2021 #130 SIGN 1- illum wall sign
T21FC00161 Final 02/25/2021 09/21/2021 FIRECONS Ansul system installation
T22OT00290 Final 04/20/2022 10/24/2022 #110 SIGN 1 wall sign

Code Enforcement

Parcel Number - 141148180
Date - 12/20/2025 10:23 a.m.
Total Number Of Code Cases - 13
Case Number Case Status Entered Date Closed Date Unit Type Description
CE-VIO0525-01889 Closed - resolved 05/05/2025 05/06/2025 Code Enforcement Case Sign Sweep
T06FR01558 Complete 05/30/2006 N/A #130 FIREINSP self inspection program.
T08FR00208 Complete 01/17/2008 N/A #160 FIREINSP General Inspection
T08FR00222 Complete 01/22/2008 N/A #150 FIREINSP General Inspection
T08FR00238 Complete 01/24/2008 N/A #140 FIREINSP General Inspection
T08FR00239 Complete 01/24/2008 N/A #110 FIREINSP General Inspection
T08FR00302 Complete 01/28/2008 N/A #100 FIREINSP General Inspection
T09FR00994 Complete 03/17/2009 N/A FIREINSP SIP
T15DV00289 Complian 01/16/2015 N/A DNR_VIOL BANNERS, FEATHER BANNERS, BANDIT SIGNS ,AFRAMES
T15DV01625 Complian 03/05/2015 N/A DNR_VIOL SIGN VIOLATION
T19DV09386 Complian 12/13/2019 N/A DNR_VIOL Viva Coffee House: illegal and unpermitted bandit and homemade signs throughout neighborhoods in Rita Ranch area, including ones attached to traffic lights with chains. Nexus & Rita, Valenica & Houghton, Rita Ranch neighborhood ROWs.
T20DV01254 Complian 02/20/2020 N/A DNR_VIOL ILLEGAL SIGN
T21DV01604 Complian 03/22/2021 N/A DNR_VIOL Sign promoting business too close to the ground, from Viva Cafe. (Located on E Valencia Rd & Nexus Rd); Sign attached to traffic signal at intersection; other signs on ROW at Nexus & Rita Rd.