Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Parcel Search: 141148180
Parcel Search
Parcel Attributes
| Parcel | 141148180 |
|---|---|
| Jurisdiction | Tucson, Pima County |
| City of Tucson Zoning | C-1 |
| Tucson Ward | Ward 4 |
| Tucson Registered Neighborhood | Rita Ranch |
| Major Street & Route | Gateway Route |
| Pima County Data | Assessor, Recorder, Treasurer, ... |
| Parcel Map | Map |
| Address | |
| Parcel Attributes Issue? | |
Annexations & Original City Zoning (OCZ)
Date - 12/20/2025 10:23 a.m.
Total Number Of OZC Plans - (1)
Special Development Requests & Requirements
Date - 12/20/2025 10:23 a.m.
Total Number Of Special Development Permits - (2)
| Activity Number | Status | Apply Date | Expired Date | Type | Description |
|---|---|---|---|---|---|
| H000009103 | Closed | N/A | |||
| T11SA00357 | Complete | N/A |
Permits
Parcel Number - 141148180
Date - 12/20/2025 10:23 a.m.
Total Number Of Permits - (426)
| Permit | Permit Status | Entered Date | Expired Date | Unit | Type | Description |
|---|---|---|---|---|---|---|
| TR-UTL-0223-00853 | Complete | 02/13/2023 | 09/24/2023 | Right-of-Way (ROW) - Utility | PRJ242537-4-RL-5916-City of Tucson CIP SR14-Valencia Rd project. Trench 20' South from existing pedestal location to relocate to new pedestal location per CIP. | |
| TS-PRM-0523-00294 | Issued | 05/03/2023 | 10/30/2023 | UNIT 160 | Sign - Permanent | Flush mount led illuminated channel lettering |
| TF-FCP-0524-00393 | Complete | 05/21/2024 | 11/30/2024 | UNIT 150 | Fire Construction Permit | To add 9-ea. sprinkler heads for drop ceiling. |
| T20CM05848 | Expired | 09/03/2020 | N/A | 130 | Commercial Building | PLUMBING ADDED FOR SINK |
| T18OT01007 | Submitted | 09/19/2018 | N/A | Sign - Permanent | 3 wall signs on east elevation (facing Nexus) | |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project | |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 1 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 1 UNIT 1101 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 1 UNIT 1102 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 1 UNIT 1103 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 1 UNIT 1104 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 1 UNIT 1105 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 1 UNIT 1106 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 1 UNIT 1107 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 1 UNIT 1108 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 1 UNIT 1201 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 1 UNIT 1202 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 1 UNIT 1203 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 1 UNIT 1204 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 1 UNIT 1205 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 1 UNIT 1206 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 1 UNIT 1207 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 1 UNIT 1208 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 10 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 10 UNIT 10101 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 10 UNIT 10102 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 10 UNIT 10103 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 10 UNIT 10104 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 10 UNIT 10105 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 10 UNIT 10106 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 10 UNIT 10107 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 10 UNIT 10108 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 10 UNIT 10201 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 10 UNIT 10202 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 10 UNIT 10203 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 10 UNIT 10204 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 10 UNIT 10205 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 10 UNIT 10206 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 10 UNIT 10207 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 10 UNIT 10208 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 11 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 11 UNIT 11101 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 11 UNIT 11102 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 11 UNIT 11103 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 11 UNIT 11104 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 11 UNIT 11105 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 11 UNIT 11106 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 11 UNIT 11107 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 11 UNIT 11108 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 11 UNIT 11201 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 11 UNIT 11202 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 11 UNIT 11203 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 11 UNIT 11204 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 11 UNIT 11205 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 11 UNIT 11206 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 11 UNIT 11207 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 11 UNIT 11208 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 11 UNIT 11301 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 11 UNIT 11302 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 11 UNIT 11303 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 11 UNIT 11304 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 11 UNIT 11305 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 11 UNIT 11306 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 11 UNIT 11307 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 11 UNIT 11308 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 12 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 12 UNIT 12101 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 12 UNIT 12102 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 12 UNIT 12103 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 12 UNIT 12104 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 12 UNIT 12105 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 12 UNIT 12106 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 12 UNIT 12107 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 12 UNIT 12108 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 12 UNIT 12201 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 12 UNIT 12202 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 12 UNIT 12203 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 12 UNIT 12204 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 12 UNIT 12205 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 12 UNIT 12206 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 12 UNIT 12207 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 12 UNIT 12208 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 12 UNIT 12301 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 12 UNIT 12302 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 12 UNIT 12303 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 12 UNIT 12304 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 12 UNIT 12305 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 12 UNIT 12306 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 12 UNIT 12307 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 12 UNIT 12308 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 13 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 13 UNIT 13101 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 13 UNIT 13102 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 13 UNIT 13103 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 13 UNIT 13104 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 13 UNIT 13105 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 13 UNIT 13106 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 13 UNIT 13107 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 13 UNIT 13108 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 13 UNIT 13201 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 13 UNIT 13202 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 13 UNIT 13203 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 13 UNIT 13204 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 13 UNIT 13205 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 13 UNIT 13206 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 13 UNIT 13207 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 13 UNIT 13208 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 13 UNIT 13301 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 13 UNIT 13302 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 13 UNIT 13303 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 13 UNIT 13304 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 13 UNIT 13305 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 13 UNIT 13306 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 13 UNIT 13307 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 13 UNIT 13308 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 14 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 14 UNIT 14101 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 14 UNIT 14102 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 14 UNIT 14103 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 14 UNIT 14104 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 14 UNIT 14105 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 14 UNIT 14106 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 14 UNIT 14107 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 14 UNIT 14108 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 14 UNIT 14201 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 14 UNIT 14202 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 14 UNIT 14203 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 14 UNIT 14204 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 14 UNIT 14205 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 14 UNIT 14206 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 14 UNIT 14207 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 14 UNIT 14208 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 14 UNIT 14301 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 14 UNIT 14302 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 14 UNIT 14303 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 14 UNIT 14304 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 14 UNIT 14305 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 14 UNIT 14306 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 14 UNIT 14307 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 14 UNIT 14308 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 15 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 15 UNIT 15101 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 15 UNIT 15102 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 15 UNIT 15103 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 15 UNIT 15104 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 15 UNIT 15105 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 15 UNIT 15106 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 15 UNIT 15107 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 15 UNIT 15108 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 15 UNIT 15201 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 15 UNIT 15202 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 15 UNIT 15203 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 15 UNIT 15204 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 15 UNIT 15205 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 15 UNIT 15206 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 15 UNIT 15207 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 15 UNIT 15208 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 15 UNIT 15301 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 15 UNIT 15302 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 15 UNIT 15303 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 15 UNIT 15304 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 15 UNIT 15305 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 15 UNIT 15306 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 15 UNIT 15307 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 15 UNIT 15308 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 16 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 16 UNIT 16101 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 16 UNIT 16102 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 16 UNIT 16103 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 16 UNIT 16104 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 16 UNIT 16105 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 16 UNIT 16106 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 16 UNIT 16107 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 16 UNIT 16108 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 16 UNIT 16201 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 16 UNIT 16202 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 16 UNIT 16203 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 16 UNIT 16204 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 16 UNIT 16205 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 16 UNIT 16206 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 16 UNIT 16207 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 16 UNIT 16208 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 16 UNIT 16301 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 16 UNIT 16302 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 16 UNIT 16303 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 16 UNIT 16304 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 16 UNIT 16305 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 16 UNIT 16306 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 16 UNIT 16307 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 16 UNIT 16308 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 17 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 18 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 2 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 2 UNIT 2101 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 2 UNIT 2102 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 2 UNIT 2103 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 2 UNIT 2104 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 2 UNIT 2105 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 2 UNIT 2106 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 2 UNIT 2107 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 2 UNIT 2108 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 2 UNIT 2201 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 2 UNIT 2202 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 2 UNIT 2203 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 2 UNIT 2204 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 2 UNIT 2205 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 2 UNIT 2206 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 2 UNIT 2207 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 2 UNIT 2208 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 2 UNIT 2301 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 2 UNIT 2302 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 2 UNIT 2303 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 2 UNIT 2304 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 2 UNIT 2305 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 2 UNIT 2306 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 2 UNIT 2307 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 2 UNIT 2308 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 3 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 3 UNIT 3101 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 3 UNIT 3102 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 3 UNIT 3103 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 3 UNIT 3104 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 3 UNIT 3105 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 3 UNIT 3106 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 3 UNIT 3107 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 3 UNIT 3108 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 3 UNIT 3201 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 3 UNIT 3202 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 3 UNIT 3203 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 3 UNIT 3204 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 3 UNIT 3205 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 3 UNIT 3206 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 3 UNIT 3207 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 3 UNIT 3208 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 4 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 4 UNIT 4101 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 4 UNIT 4102 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 4 UNIT 4103 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 4 UNIT 4104 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 4 UNIT 4105 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 4 UNIT 4106 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 4 UNIT 4107 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 4 UNIT 4108 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 4 UNIT 4201 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 4 UNIT 4202 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 4 UNIT 4203 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 4 UNIT 4204 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 4 UNIT 4205 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 4 UNIT 4206 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 4 UNIT 4207 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 4 UNIT 4208 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 5 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 5 UNIT 5101 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 5 UNIT 5102 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 5 UNIT 5103 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 5 UNIT 5104 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 5 UNIT 5105 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 5 UNIT 5106 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 5 UNIT 5107 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 5 UNIT 5108 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 5 UNIT 5201 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 5 UNIT 5202 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 5 UNIT 5203 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 5 UNIT 5204 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 5 UNIT 5205 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 5 UNIT 5206 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 5 UNIT 5207 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 5 UNIT 5208 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 6 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 6 UNIT 6101 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 6 UNIT 6102 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 6 UNIT 6103 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 6 UNIT 6104 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 6 UNIT 6105 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 6 UNIT 6106 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 6 UNIT 6107 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 6 UNIT 6108 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 6 UNIT 6201 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 6 UNIT 6202 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 6 UNIT 6203 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 6 UNIT 6204 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 6 UNIT 6205 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 6 UNIT 6206 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 6 UNIT 6207 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 6 UNIT 6208 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 7 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 7 UNIT 7101 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 7 UNIT 7102 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 7 UNIT 7103 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 7 UNIT 7104 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 7 UNIT 7105 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 7 UNIT 7106 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 7 UNIT 7107 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 7 UNIT 7108 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 7 UNIT 7201 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 7 UNIT 7202 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 7 UNIT 7203 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 7 UNIT 7204 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 7 UNIT 7205 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 7 UNIT 7206 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 7 UNIT 7207 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 7 UNIT 7208 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 8 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 8 UNIT 8101 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 8 UNIT 8102 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 8 UNIT 8103 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 8 UNIT 8104 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 8 UNIT 8105 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 8 UNIT 8106 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 8 UNIT 8107 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 8 UNIT 8108 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 8 UNIT 8201 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 8 UNIT 8202 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 8 UNIT 8203 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 8 UNIT 8204 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 8 UNIT 8205 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 8 UNIT 8206 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 8 UNIT 8207 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 8 UNIT 8208 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 9 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 9 UNIT 9101 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 9 UNIT 9102 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 9 UNIT 9103 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 9 UNIT 9104 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 9 UNIT 9105 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 9 UNIT 9106 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 9 UNIT 9107 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 9 UNIT 9108 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 9 UNIT 9201 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 9 UNIT 9202 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 9 UNIT 9203 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 9 UNIT 9204 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 9 UNIT 9205 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 9 UNIT 9206 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 9 UNIT 9207 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | BLDG 9 UNIT 9208 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | UNIT 100 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | UNIT 106 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | UNIT 110 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | UNIT 112 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | UNIT 118 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | UNIT 120 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | UNIT 124 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | UNIT 130 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | UNIT 136 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | UNIT 140 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | UNIT 142 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | UNIT 150 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | UNIT 160 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | UNIT 166 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | UNIT 172 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | UNIT 178 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | UNIT 184 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | UNIT 188 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TR-ROW-1123-01353 | Complete | 11/14/2023 | 12/27/2023 | UNIT 196 | Right-of-Way (ROW) | Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project |
| TS-PRM-1124-00502 | Inspections complete | 11/18/2024 | 07/07/2025 | UNIT 150 | Sign - Permanent | Front Lit Pan Channels mounted on wall |
| T02AN00823 | Issued | 09/06/2002 | N/A | ADDRNEW | ||
| T03AN00926 | Issued | 09/16/2003 | N/A | #120 | ADDRNEW | |
| T03AN00953 | Issued | 09/24/2003 | N/A | #130 | ADDRNEW | |
| T03AN00968 | Issued | 09/29/2003 | N/A | #100 | ADDRNEW | |
| T03AN00988 | Issued | 10/01/2003 | N/A | #150 | ADDRNEW | |
| T03BU00412 | Final | 02/14/2003 | 03/21/2004 | GRADING | GRADING:1300CY CUT & 50CY FILL | |
| T03BU01771 | Final | 07/08/2003 | 03/27/2004 | SPKLR | FIRE:SPKR NEW 108 | |
| T03BU01947 | Final | 07/30/2003 | 02/23/2004 | SPKLR | FIRE SPKR:INSTALL 230LF OF 4" PIPE | |
| T03BU02638 | C of o | 10/10/2003 | 04/20/2004 | #120 | BUILD | TI:RETAIL- WALL |
| T03BU02886 | Final | 11/06/2003 | 06/05/2004 | #160 | SPKLR | FIRE SPKR:RELOCATE 7 |
| T03BU03125 | Final | 12/12/2003 | 08/23/2004 | #100 | BUILD | FIRE SPKR:KITCHEN EXHAUST SYSTEM |
| T03CM00269 | Final | 01/22/2003 | 03/08/2005 | COMBO | NEW:RETAIL SHELL | |
| T03CM02534 | C of o | 05/23/2003 | 06/21/2004 | #160 | COMBO | TI:COFFEE SHOP |
| T03CM03776 | Withdrwn | 07/30/2003 | N/A | #150 | COMBO | TI:RETAIL |
| T03CM04686 | C of o | 09/29/2003 | 08/24/2004 | #100 | COMBO | TI:RESTAURANT |
| T03CM04756 | C of o | 10/01/2003 | 06/05/2004 | #150 | COMBO | TI:RETAIL |
| T03CM04966 | C of o | 10/16/2003 | 08/02/2004 | #110 | COMBO | TI:RETAIL |
| T03EX00929 | Closed | 08/25/2003 | 10/24/2003 | EXCAV | EXCAV:150 LF TEP TRENCH | |
| T03OT01649 | Final | 09/18/2003 | 04/27/2004 | #130 | SIGN | SIGN:6046 |
| T03OT01692 | Final | 09/23/2003 | 06/05/2004 | #150 | SIGN | SIGN:#6083 |
| T03OT01704 | Final | 09/25/2003 | 08/08/2004 | #100 | SIGN | SIGN:6094 |
| T03OT01733 | C of o | 09/30/2003 | 04/17/2004 | #130 | C-OF-O | C OF O:CURVES |
| T03OT01843 | Final | 10/17/2003 | 05/22/2004 | #110 | SIGN | SIGN:6191 |
| T03OT01862 | Final | 10/21/2003 | 11/29/2004 | #130 | SIGN | SIGN:6201 |
| T03OT01944 | Final | 11/04/2003 | 05/19/2004 | #120 | SIGN | SIGN:ELECTRIC:6267 |
| T03OT01945 | Final | 11/04/2003 | 06/19/2004 | #120 | SIGN | SIGN:6266 |
| T03OT01976 | Final | 11/07/2003 | 07/05/2004 | #160 | SIGN | SIGN:ELECTRIC:6289 |
| T04BU00419 | Final | 02/24/2004 | 08/23/2004 | #100 | SPKLR | FIRE SPRINKLER:RELOCATE 5 |
| T05AN00471 | Issued | 04/29/2005 | N/A | #140 | ADDRNEW | |
| T05CM01903 | Expired | 04/29/2005 | 12/12/2005 | #140 | COMBO | TI: COMMERCIAL CHECK CASH NO INTERIOR CONSTRUCTION, MILLWORK AND 5' HIGH OFFICE PARTITIONS ONLY, REMAINDER COMPLETED WITH SHELL STRUCTURE, PER PLANS. |
| T05EL01116 | Expired | 06/03/2005 | 12/06/2005 | #140 | ELECT | RECONNECT ELECTRIC |
| T05OT01636 | Final | 07/01/2005 | 02/12/2006 | #140 | SIGN | BANNER: 9287 CHECK INTO CASH |
| T05OT01637 | Expired | 07/01/2005 | 05/24/2006 | #140 | SIGN | SIGN: CHECK INTO CASH 9288 |
| T06OT00469 | Final | 02/16/2006 | 01/16/2007 | #160 | SIGN | 10667 |
| T08BU01875 | Final | 10/20/2008 | 05/13/2009 | #150 | SPKLR | Relocate 2 fire sprinkler heads. |
| T08CM03268 | Final | 10/03/2008 | 05/03/2009 | #120 | COMBO | TI: H & R BLOCK (#120) |
| T08CM03510 | Final | 10/30/2008 | 05/12/2009 | #150 | COMBO | TI: RETAIL (#150) |
| T08OT00525 | Final | 03/06/2008 | 10/06/2008 | #120 | SIGN | 14579 |
| T08OT00526 | Final | 03/06/2008 | 12/06/2008 | SIGN | 14578 | |
| T08OT02443 | Expired | 10/14/2008 | 07/08/2009 | #120 | SIGN | 15741 |
| T08OT02463 | Final | 10/15/2008 | 09/14/2010 | #120 | SIGN | 15747 |
| T08OT02704 | Final | 11/17/2008 | 06/20/2009 | #150 | SIGN | 15913 |
| T08OT02962 | Expired | 12/18/2008 | 02/01/2009 | #150 | SIGN | 16069 |
| T09OT00552 | Final | 03/19/2009 | 11/10/2009 | #160 | SIGN | 16432 |
| T09OT00553 | Final | 03/19/2009 | 10/31/2009 | #160 | SIGN | 16431 |
| T09OT00605 | Final | 03/27/2009 | 09/26/2009 | #160 | SIGN | 16446 |
| T09OT00960 | Final | 05/15/2009 | 11/15/2009 | #150 | SIGN | 16660 |
| T10BU01534 | Final | 10/06/2010 | 05/18/2011 | #140 | SPKLR | Add 17 fire sprinklers |
| T10BU01800 | Final | 12/07/2010 | 06/08/2011 | #140 | BUILD | INSTALL:FIRE HOOD SYSTEM |
| T10BU01819 | Final | 12/09/2010 | 06/08/2011 | BUILD | MODIFICTION TO EXISTING ALARM SYSTEM | |
| T10CM01649 | C of o | 06/17/2010 | 06/07/2011 | #140 | COMBO | TI & C OF O: RESTAURANT |
| T10CM02707 | Void | 09/29/2010 | N/A | #140 | COMBO | TI:RESTAURANT LITTLE CEASARS |
| T10OT01767 | Final | 08/19/2010 | 02/28/2011 | #130 | SIGN | 18771 |
| T10OT02316 | Final | 10/27/2010 | 05/09/2011 | #140 | SIGN | CHANGE OF COPY 19066 |
| T10OT02617 | Final | 12/09/2010 | 07/24/2011 | #140 | SIGN | BANNER; 45 DAY, FROM 12/09/10 - 01/23/11 |
| T11OT01295 | Final | 06/29/2011 | 04/29/2012 | #120 | SIGN | BANNER: 90 DAYS START: 06/29/11 END: 09/27/11 |
| T11OT02051 | Final | 11/01/2011 | 05/14/2012 | SIGN | BANNER 9/28/11 TO 11/12/11 | |
| T12CM06735 | Final | 10/22/2012 | 04/24/2013 | #160 | COMBO | RECONNECT ELECTRIC; COMMERCL |
| T12OT00924 | Denied | 06/20/2012 | 03/25/2013 | #120 | SIGN | BANNER; 90 DAY, 06/25/12 - 09/23/12 |
| T13OT01373 | Expired | 11/19/2013 | 05/25/2014 | #120 | SIGN | 2- ILLUM WALL SIGNS |
| T14OT01458 | Final | 11/19/2014 | 10/05/2015 | #120 | SIGN | BANNER 90 DAY: 01/15/2015 TO 04/15/2015 |
| T15CM06032 | Withdrwn | 08/28/2015 | N/A | COMBO | TI: NEW INTERIOR WALLS | |
| T15OT00155 | Final | 02/03/2015 | 08/12/2015 | #120 | SIGN | A-FRAME SIGN TRE |
| T18OT01074 | Final | 10/11/2018 | 05/29/2019 | SIGN | 3-ILLUM WALL SIGNs | |
| T18RW02776 | Final | 06/20/2018 | 08/19/2018 | ROW | Starting on the S/W corner of E. Valencia Rd and Nexus Pull through Existing Conduit going East for 125', Trench /bore South for 85' placing another 3x3x3 pothole for New Vault , trench East 5' Placing New Fiber Cabinet . ( Cir 276093) | |
| T18RW04193 | Final | 09/18/2018 | 11/17/2018 | ROW | Starting on the S/W corner of E. Valencia Rd and Nexus Pull through Existing Conduit going East for 125', Trench /bore South for 85' placing another 3x3x3 pothole for New Vault , trench East 5' Placing New Fiber Cabinet . ( Cir 276093) | |
| T18RW04539 | Final | 10/08/2018 | 11/10/2018 | ROW | POTHOLING FOR FUTURE DEVELOPEMENT ADDRESS ON APPLICATION-VALENCIA EAST OF NEXUS, NORTH OF RITA RD | |
| T20OT00540 | Final | 08/06/2020 | 02/13/2021 | #130 | SIGN | 1- illum wall sign |
| T21FC00161 | Final | 02/25/2021 | 09/21/2021 | FIRECONS | Ansul system installation | |
| T22OT00290 | Final | 04/20/2022 | 10/24/2022 | #110 | SIGN | 1 wall sign |
Code Enforcement
Parcel Number - 141148180
Date - 12/20/2025 10:23 a.m.
Total Number Of Code Cases - 13
| Case Number | Case Status | Entered Date | Closed Date | Unit | Type | Description |
|---|---|---|---|---|---|---|
| CE-VIO0525-01889 | Closed - resolved | 05/05/2025 | 05/06/2025 | Code Enforcement Case | Sign Sweep | |
| T06FR01558 | Complete | 05/30/2006 | N/A | #130 | FIREINSP | self inspection program. |
| T08FR00208 | Complete | 01/17/2008 | N/A | #160 | FIREINSP | General Inspection |
| T08FR00222 | Complete | 01/22/2008 | N/A | #150 | FIREINSP | General Inspection |
| T08FR00238 | Complete | 01/24/2008 | N/A | #140 | FIREINSP | General Inspection |
| T08FR00239 | Complete | 01/24/2008 | N/A | #110 | FIREINSP | General Inspection |
| T08FR00302 | Complete | 01/28/2008 | N/A | #100 | FIREINSP | General Inspection |
| T09FR00994 | Complete | 03/17/2009 | N/A | FIREINSP | SIP | |
| T15DV00289 | Complian | 01/16/2015 | N/A | DNR_VIOL | BANNERS, FEATHER BANNERS, BANDIT SIGNS ,AFRAMES | |
| T15DV01625 | Complian | 03/05/2015 | N/A | DNR_VIOL | SIGN VIOLATION | |
| T19DV09386 | Complian | 12/13/2019 | N/A | DNR_VIOL | Viva Coffee House: illegal and unpermitted bandit and homemade signs throughout neighborhoods in Rita Ranch area, including ones attached to traffic lights with chains. Nexus & Rita, Valenica & Houghton, Rita Ranch neighborhood ROWs. | |
| T20DV01254 | Complian | 02/20/2020 | N/A | DNR_VIOL | ILLEGAL SIGN | |
| T21DV01604 | Complian | 03/22/2021 | N/A | DNR_VIOL | Sign promoting business too close to the ground, from Viva Cafe. (Located on E Valencia Rd & Nexus Rd); Sign attached to traffic signal at intersection; other signs on ROW at Nexus & Rita Rd. |