Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Parcel Search

 
Parcel Attributes
Parcel141112880
JurisdictionTucson
City of Tucson ZoningMH-1
Airport Environs Zone

NCD-A Davis Monthan AEZ Paddle

,

Tucson International AEZ Paddle

Tucson WardWard 4
Tucson Registered NeighborhoodRita Ranch
Major Streets & Routes

Gateway Route

,

Intersection Buffer

Pima County Data Assessor, Recorder, Treasurer, ...
Parcel Map Map
Address

Annexations & Original City Zoning (OCZ)

Date - 12/23/2024 6:08 p.m.
Total Number Of OZC Plans - (1)
Plan Description Annexation Ordinance Effective Date OCZ Ordinance
C9-64-84 Area 7 6142 01/17/1985 6143

Rezoning Cases

Date - 12/23/2024 6:08 p.m.
Total Number Of Rezone Cases - (1)
Case No. Description New Zone Status Status Date Address
C9-93-15 Rita Land Corp - Valencia Road R-3 Withdrawn 09/16/2009 E HODGMAN

Permits

Parcel Number - 141112880
Date - 12/23/2024 6:08 p.m.
Total Number Of Permits - (354)
Permit Permit Status Entered Date Expired Date Unit Type Description
TC-SOL-0724-00172 Issued 07/03/2024 01/28/2025 Solar Solarapp - Installation of 15.20kW PV System / Derate
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 1 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 1 UNIT 1101 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 1 UNIT 1102 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 1 UNIT 1103 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 1 UNIT 1104 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 1 UNIT 1105 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 1 UNIT 1106 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 1 UNIT 1107 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 1 UNIT 1108 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 1 UNIT 1201 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 1 UNIT 1202 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 1 UNIT 1203 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 1 UNIT 1204 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 1 UNIT 1205 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 1 UNIT 1206 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 1 UNIT 1207 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 1 UNIT 1208 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 10 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 10 UNIT 10101 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 10 UNIT 10102 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 10 UNIT 10103 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 10 UNIT 10104 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 10 UNIT 10105 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 10 UNIT 10106 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 10 UNIT 10107 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 10 UNIT 10108 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 10 UNIT 10201 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 10 UNIT 10202 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 10 UNIT 10203 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 10 UNIT 10204 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 10 UNIT 10205 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 10 UNIT 10206 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 10 UNIT 10207 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 10 UNIT 10208 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 11 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 11 UNIT 11101 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 11 UNIT 11102 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 11 UNIT 11103 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 11 UNIT 11104 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 11 UNIT 11105 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 11 UNIT 11106 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 11 UNIT 11107 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 11 UNIT 11108 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 11 UNIT 11201 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 11 UNIT 11202 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 11 UNIT 11203 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 11 UNIT 11204 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 11 UNIT 11205 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 11 UNIT 11206 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 11 UNIT 11207 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 11 UNIT 11208 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 11 UNIT 11301 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 11 UNIT 11302 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 11 UNIT 11303 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 11 UNIT 11304 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 11 UNIT 11305 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 11 UNIT 11306 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 11 UNIT 11307 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 11 UNIT 11308 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 12 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 12 UNIT 12101 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 12 UNIT 12102 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 12 UNIT 12103 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 12 UNIT 12104 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 12 UNIT 12105 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 12 UNIT 12106 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 12 UNIT 12107 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 12 UNIT 12108 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 12 UNIT 12201 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 12 UNIT 12202 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 12 UNIT 12203 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 12 UNIT 12204 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 12 UNIT 12205 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 12 UNIT 12206 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 12 UNIT 12207 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 12 UNIT 12208 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 12 UNIT 12301 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 12 UNIT 12302 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 12 UNIT 12303 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 12 UNIT 12304 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 12 UNIT 12305 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 12 UNIT 12306 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 12 UNIT 12307 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 12 UNIT 12308 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 13 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 13 UNIT 13101 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 13 UNIT 13102 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 13 UNIT 13103 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 13 UNIT 13104 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 13 UNIT 13105 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 13 UNIT 13106 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 13 UNIT 13107 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 13 UNIT 13108 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 13 UNIT 13201 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 13 UNIT 13202 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 13 UNIT 13203 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 13 UNIT 13204 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 13 UNIT 13205 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 13 UNIT 13206 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 13 UNIT 13207 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 13 UNIT 13208 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 13 UNIT 13301 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 13 UNIT 13302 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 13 UNIT 13303 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 13 UNIT 13304 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 13 UNIT 13305 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 13 UNIT 13306 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 13 UNIT 13307 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 13 UNIT 13308 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 14 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 14 UNIT 14101 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 14 UNIT 14102 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 14 UNIT 14103 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 14 UNIT 14104 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 14 UNIT 14105 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 14 UNIT 14106 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 14 UNIT 14107 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 14 UNIT 14108 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 14 UNIT 14201 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 14 UNIT 14202 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 14 UNIT 14203 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 14 UNIT 14204 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 14 UNIT 14205 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 14 UNIT 14206 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 14 UNIT 14207 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 14 UNIT 14208 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 14 UNIT 14301 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 14 UNIT 14302 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 14 UNIT 14303 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 14 UNIT 14304 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 14 UNIT 14305 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 14 UNIT 14306 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 14 UNIT 14307 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 14 UNIT 14308 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 15 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 15 UNIT 15101 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 15 UNIT 15102 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 15 UNIT 15103 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 15 UNIT 15104 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 15 UNIT 15105 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 15 UNIT 15106 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 15 UNIT 15107 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 15 UNIT 15108 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 15 UNIT 15201 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 15 UNIT 15202 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 15 UNIT 15203 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 15 UNIT 15204 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 15 UNIT 15205 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 15 UNIT 15206 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 15 UNIT 15207 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 15 UNIT 15208 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 15 UNIT 15301 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 15 UNIT 15302 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 15 UNIT 15303 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 15 UNIT 15304 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 15 UNIT 15305 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 15 UNIT 15306 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 15 UNIT 15307 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 15 UNIT 15308 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 16 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 16 UNIT 16101 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 16 UNIT 16102 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 16 UNIT 16103 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 16 UNIT 16104 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 16 UNIT 16105 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 16 UNIT 16106 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 16 UNIT 16107 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 16 UNIT 16108 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 16 UNIT 16201 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 16 UNIT 16202 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 16 UNIT 16203 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 16 UNIT 16204 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 16 UNIT 16205 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 16 UNIT 16206 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 16 UNIT 16207 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 16 UNIT 16208 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 16 UNIT 16301 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 16 UNIT 16302 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 16 UNIT 16303 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 16 UNIT 16304 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 16 UNIT 16305 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 16 UNIT 16306 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 16 UNIT 16307 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 16 UNIT 16308 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 17 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 18 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 2 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 2 UNIT 2101 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 2 UNIT 2102 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 2 UNIT 2103 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 2 UNIT 2104 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 2 UNIT 2105 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 2 UNIT 2106 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 2 UNIT 2107 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 2 UNIT 2108 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 2 UNIT 2201 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 2 UNIT 2202 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 2 UNIT 2203 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 2 UNIT 2204 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 2 UNIT 2205 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 2 UNIT 2206 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 2 UNIT 2207 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 2 UNIT 2208 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 2 UNIT 2301 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 2 UNIT 2302 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 2 UNIT 2303 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 2 UNIT 2304 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 2 UNIT 2305 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 2 UNIT 2306 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 2 UNIT 2307 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 2 UNIT 2308 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 3 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 3 UNIT 3101 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 3 UNIT 3102 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 3 UNIT 3103 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 3 UNIT 3104 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 3 UNIT 3105 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 3 UNIT 3106 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 3 UNIT 3107 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 3 UNIT 3108 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 3 UNIT 3201 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 3 UNIT 3202 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 3 UNIT 3203 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 3 UNIT 3204 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 3 UNIT 3205 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 3 UNIT 3206 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 3 UNIT 3207 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 3 UNIT 3208 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 4 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 4 UNIT 4101 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 4 UNIT 4102 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 4 UNIT 4103 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 4 UNIT 4104 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 4 UNIT 4105 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 4 UNIT 4106 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 4 UNIT 4107 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 4 UNIT 4108 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 4 UNIT 4201 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 4 UNIT 4202 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 4 UNIT 4203 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 4 UNIT 4204 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 4 UNIT 4205 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 4 UNIT 4206 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 4 UNIT 4207 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 4 UNIT 4208 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 5 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 5 UNIT 5101 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 5 UNIT 5102 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 5 UNIT 5103 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 5 UNIT 5104 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 5 UNIT 5105 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 5 UNIT 5106 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 5 UNIT 5107 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 5 UNIT 5108 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 5 UNIT 5201 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 5 UNIT 5202 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 5 UNIT 5203 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 5 UNIT 5204 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 5 UNIT 5205 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 5 UNIT 5206 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 5 UNIT 5207 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 5 UNIT 5208 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 6 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 6 UNIT 6101 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 6 UNIT 6102 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 6 UNIT 6103 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 6 UNIT 6104 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 6 UNIT 6105 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 6 UNIT 6106 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 6 UNIT 6107 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 6 UNIT 6108 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 6 UNIT 6201 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 6 UNIT 6202 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 6 UNIT 6203 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 6 UNIT 6204 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 6 UNIT 6205 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 6 UNIT 6206 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 6 UNIT 6207 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 6 UNIT 6208 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 7 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 7 UNIT 7101 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 7 UNIT 7102 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 7 UNIT 7103 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 7 UNIT 7104 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 7 UNIT 7105 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 7 UNIT 7106 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 7 UNIT 7107 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 7 UNIT 7108 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 7 UNIT 7201 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 7 UNIT 7202 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 7 UNIT 7203 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 7 UNIT 7204 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 7 UNIT 7205 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 7 UNIT 7206 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 7 UNIT 7207 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 7 UNIT 7208 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 8 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 8 UNIT 8101 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 8 UNIT 8102 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 8 UNIT 8103 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 8 UNIT 8104 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 8 UNIT 8105 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 8 UNIT 8106 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 8 UNIT 8107 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 8 UNIT 8108 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 8 UNIT 8201 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 8 UNIT 8202 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 8 UNIT 8203 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 8 UNIT 8204 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 8 UNIT 8205 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 8 UNIT 8206 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 8 UNIT 8207 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 8 UNIT 8208 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 9 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 9 UNIT 9101 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 9 UNIT 9102 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 9 UNIT 9103 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 9 UNIT 9104 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 9 UNIT 9105 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 9 UNIT 9106 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 9 UNIT 9107 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 9 UNIT 9108 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 9 UNIT 9201 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 9 UNIT 9202 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 9 UNIT 9203 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 9 UNIT 9204 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 9 UNIT 9205 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 9 UNIT 9206 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 9 UNIT 9207 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 9 UNIT 9208 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 UNIT 100 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 UNIT 106 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 UNIT 110 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 UNIT 112 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 UNIT 118 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 UNIT 120 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 UNIT 124 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 UNIT 130 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 UNIT 136 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 UNIT 140 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 UNIT 142 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 UNIT 150 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 UNIT 160 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 UNIT 166 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 UNIT 172 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 UNIT 178 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 UNIT 184 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 UNIT 188 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 UNIT 196 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
T01CM00219 Final 01/16/2001 11/07/2001 COMBO SFR:TD#14-88-15
T04BU02440 Final 10/06/2004 04/05/2005 BUILD ADDITION: PATIO
T12CM07702 Final 12/05/2012 06/12/2013 COMBO RECONNECT - ELECTRIC

Code Enforcement

Parcel Number - 141112880
Date - 12/23/2024 6:08 p.m.
Total Number Of Code Cases - 1
Case Number Case Status Entered Date Closed Date Unit Type Description
T22DV05422 Referred 09/20/2022 N/A DNR_VIOL Black 4dr Honda Sedan Az plates 9A2ZA rear damage