Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Parcel Search: 14101019B
Parcel Search
Annexations & Original City Zoning (OCZ)
Date - 12/23/2024 7:59 a.m.
Total Number Of OZC Plans - (1)
Rezoning Cases
Date - 12/23/2024 7:59 a.m.
Total Number Of Rezone Cases - (1)
Case No. | Description | New Zone | Status | Status Date | Address |
---|---|---|---|---|---|
C9-05-02 | Civano Master PAD - Houghton | PAD | Effectuated | 06/01/2006 | S HOUGHTON |
Special Development Requests & Requirements
Date - 12/23/2024 7:59 a.m.
Total Number Of Special Development Permits - (2)
Activity Number | Status | Apply Date | Expired Date | Type | Description |
---|---|---|---|---|---|
H000005056 | Closed | N/A | RECORD TO SHOW BILLBOARD AZ488/CLEAR CHANNEL #301 REMOVED DUE TO STORM DAMAGE | ||
H000005088 | Closed | N/A | RECORD TO SHOW BILLBOARD AZ488/CLEAR CHANNEL #301 REMOVED DUE TO STORM DAMAGE |
Permits
Parcel Number - 14101019B
Date - 12/23/2024 7:59 a.m.
Total Number Of Permits - (23)
Permit | Permit Status | Entered Date | Expired Date | Unit | Type | Description |
---|---|---|---|---|---|---|
TS-PRM-0323-00214 | Withdrawn | 03/01/2023 | 08/28/2023 | Sign - Permanent | Customer request to withdraw TS-PRM-0323-00214 Approved. Wrong address was used to apply for permit. (No MSP needed and another contractor had a sign permit issued prior) Master Sign Program to install 4 lighted wall signs and lighted faces for monument sign. | |
T22OT00162 | Expired | 03/07/2022 | 09/03/2022 | Sign - Permanent | 4-illum wall sign | |
T22CM01682 | Expired | 03/08/2022 | N/A | Commercial Building | TI: Office - new overhead doors & man doors | |
TF-FCP-0323-00470 | Expired | 03/10/2023 | 03/17/2024 | Fire Construction Permit | Replacement of Control Panel | |
TF-FCP-0823-00930 | Complete | 08/03/2023 | 02/29/2024 | Fire Construction Permit | Install of 2 Ansul Piranha kitchen hood fire suppression systems. System 1 using 15 of 17 Flow points System 2 using 2 of 7 Flow points | |
DP22-0239 | Expired | 08/17/2022 | 08/16/2023 | Development Package | Site/Grading - Steamy Concepts. Site expansion with paved driveway. | |
T01CM02725 | C of o | 06/04/2001 | 02/06/2002 | COMBO | TI:MANUFACTURING | |
T02AN01097 | Issued | 11/26/2002 | N/A | ADDRNEW | ||
T02CM02531 | Final | 05/22/2002 | 06/04/2011 | COMBO | TI:FACTORY 34' x 30' AREA FOR OFFICE/CONFERENCE ROOM, METAL STUDS W/ GYP BD | |
T02CM05491 | Closed | 11/27/2002 | 06/04/2011 | COMBO | TI:MANUFACTURING | |
T03BU00153 | Closed | 01/22/2003 | 07/21/2003 | SPKLR | FIRE SPKR:ADD 14 | |
T06CM04440 | Withdrwn | 08/03/2006 | N/A | COMBO | ADDITION:MODULAR DRYER SOLAR | |
T10OT02584 | Closed | 12/06/2010 | 06/06/2011 | C-OF-O | C OF O:MANUFACTURING | |
T12CM04284 | Final | 07/17/2012 | 01/16/2013 | COMBO | REPLACEMENT OF SERVICE EQUIPMENT & REACTIVATE ELECTRICAL SERVICE TO THE BUILDING. | |
T14OT01540 | Final | 12/09/2014 | 07/20/2015 | SIGN | INDIVIDUAL PLASIC LETTERING NO SPECIAL INSPECTION NECESSARY | |
T17RW03555 | Final | 08/12/2017 | 10/16/2017 | ROW | Start Point: from the TEP on the E Side of S Houghton Rd and E Seven Generations Way begin 1904' overlash heading South. Riser down 25', trench/bore 60' heading north. Head East 45' to out of row. | |
T17RW04109 | Final | 09/15/2017 | 11/14/2017 | ROW | APPROX (36) BELLHOLES IN DIRT SHOULDER/ASPHALT/BIKE PATH TO INSPECT GAS LINE SOUTH HOUGHTON-IRVINGTON TO VALENCIA ADDRESS ON APPLICATION - 5575 S HOUGHTON | |
T18FC00246 | Final | 03/22/2018 | 10/28/2018 | FIRECONS | Modify Existing Wet Pipe Fire Sprinkler System | |
T18FC00250 | Final | 03/26/2018 | 10/28/2018 | FIRECONS | MODIFY EXISTING WET PIRE FOR FIRE SPRINKLER SYSTEM. | |
T18RW05658 | Final | 12/26/2018 | 01/25/2019 | ROW | START POINT- FROM THE TEP POLE ON THE NORTH SIDE OF 5755 S HOUGHTON RD BEGIN 254' OVERLASH HEADING SOUTH, TIE IN | |
T20RW05463 | Final | 10/06/2020 | 12/05/2020 | ROW | Starting on the East side of S. Houghton Rd North of E. Drexel rd at Cox existing vault. Place New ped next to existing vault & connect ped to vault. From vault trench/bore South 655' placing 2-2" conduits and .625 coax, continue East 272' placing 3x3x3 potholes where needed along the way to Cox existing vault, Place New ped next to vault & connect to existing 2-2"conduits, pull coax in to PED. From Vault pull through existing conduit going South 87' then S/E 43' to out of row NOTE: HOUGHTON RD is under a pavement moratorium, any new asphalt that is disturbed will require a 2” mill and overlay for 50’ in each direction from the outside of the cut for all effected travel lanes. ADDRESS ON APPLICATION WAS 10350 E DREXEL RD | |
T21FC00588 | Final | 07/26/2021 | 05/18/2022 | FIRECONS | Demo (8) existing pendent sprinklers and 1" drops in Clean Room that owner is removing. | |
T22RW00451 | Final | 02/09/2022 | 04/24/2022 | ROW | STARTING IN FRONT OF ADDRESS AT TEP POWELL TIE IN .48 CT FIBER RISER DOWN POLE PULL THROUGH EXISTING CONDUIT 22' NORTH CONTINUING 10' EAST TO OUT OF ROW |
Code Enforcement
Parcel Number - 14101019B
Date - 12/23/2024 7:59 a.m.
Total Number Of Code Cases - 3
Case Number | Case Status | Entered Date | Closed Date | Unit | Type | Description |
---|---|---|---|---|---|---|
T07FR00250 | Complete | 02/01/2007 | N/A | FIREINSP | FPI conducted Friday 1/25/07 | |
T09FR00967 | Complete | 03/16/2009 | N/A | FIREINSP | FIRE SPRINKLER SYSTEM COMPLAINT | |
T12DV07869 | Complian | 08/30/2012 | N/A | DNR_VIOL | Interior work being done on this exsisting structure. Framing, electrical, and plumbing. Contractor working on site is not licensed. He is currently suspended. |
Plans
Parcel Number - 14101019B
Date - 12/23/2024 7:59 a.m.
Total Number Of Plans - 1
Plan Number | Plan Status | Application Date | Expired Date | Unit | Type | Description |
---|---|---|---|---|---|---|
CWH-22-0239 | Active | 08/17/2022 | 08/17/2023 | Basin | Site/Grading - Steamy Concepts. Site expansion with paved driveway. |