Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Parcel Search
 
Parcel Attributes
Parcel140372350
JurisdictionTucson, Pima County
City of Tucson ZoningR-1
Tucson WardWard 5
Major Street & Route

Arterial or Collector
-
Intersection Buffer

Pima County Data Assessor, Recorder, Treasurer, ...
Parcel Map Map
Address
Parcel Attributes Issue?

Annexations & Original City Zoning (OCZ)

Date - 10/09/2026 12:24 p.m.
Total Number Of OZC Plans - (1)
Plan Description Annexation Ordinance Effective Date OCZ Ordinance
C15-95-16 Wilmot / I-10 8655 04/03/1996 8677

Permits

Parcel Number - 140372350
Date - 10/09/2026 12:24 p.m.
Total Number Of Permits - (6)
Permit Permit Status Entered Date Expired Date Unit Type Description
TR-UTL-0524-01071 Complete 05/30/2024 09/15/2024 Right-of-Way (ROW) - Utility East of 7279 S Prospector Peak Dr ( S Wilmot Rd and E Camino Boledoras) PULL THRU 870' TO INSTALL NEW CATV CONDUIT FOR SYSTEM TIE
T00ME00240 Final 03/13/2000 09/10/2000 MECH AIR COND:NEW
T00MH00023 Final 01/18/2000 09/10/2000 MH MANUFACCTURED HOME:SETUP
T03EL00655 Final 04/07/2003 10/05/2003 ELECT RECONNECT:ELECTRIC:SFR
T20RW03985 Final 07/11/2020 11/21/2020 ROW From TEP Pole E of 7279 S Prospector Peak Dr, Head S and begin 1610' aerial overlash 288ct fiber. Head SE and continue 239' aerial overlash 288ct fiber in to out of ROW. Continuing from ADOT ROW, heading N, continue 270' aerial overlash 288ct fiber. Head E and continue 134' aerial overlash 288 ct fiber. Head S 10' in to out of ROW.
T21RW02962 Final 06/18/2021 02/25/2022 ROW From TEP Pole E of 7279 S Prospector Peak Dr, Head S and begin 1610' aerial overlash 288ct fiber. Head SE and continue 239' aerial overlash 288ct fiber in to out of ROW. Continuing from ADOT ROW, heading N, continue 270' aerial overlash 288ct fiber. Head E and continue 134' aerial overlash 288 ct fiber. Head S 10' in to out of ROW. PREVIOUSLY PERMITTED UNDER T20RW03985 PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING.