Parcel Search

 
Parcel Attributes
Parcel14036005E
City of Tucson ZoningPAD-21
Tucson WardWard 5
Pima County Data Assessor, Recorder, Treasurer, ...
Parcel Map Map

Permits

Parcel Number - 14036005E
Date - 12/24/2024 4:23 p.m.
Total Number Of Permits - (2)
Permit Permit Status Entered Date Expired Date Unit Type Description
DP18-0053 Issued 03/07/2018 08/24/2026 Development Package TENTATIVE PLAT/FLD/GRADE/SWPPP - Valencia Crossing, Neighborhoods 3 & 4, Lots 1-162.
T20RW01428 Final 03/04/2020 05/16/2020 ROW NEW GAS LINE INSTALLATION TO SERVE NEW SUBDIVISION AT VALENCIA RD AND LITTLETOWN RD. PLEASE SEE ATTACHED DESIGN.

Plans

Parcel Number - 14036005E
Date - 12/24/2024 4:23 p.m.
Total Number Of Plans - 5
Plan Number Plan Status Application Date Expired Date Unit Type Description
S18-053 Complete 06/11/2018 07/21/2024 Land Division Valencia Crossing 3 & 4,1-162
S22-032 In review 05/30/2022 N/A Land Division Valencia Crossing, Final Plat
T18PI00013 Final 05/07/2018 01/24/2022 PAVING Construction/Installation of Improvements associated with VALENCIA CROSSING INFRASTRUCTURE, which comprises of installation, back-filling, grading and all clean-up necessary to install those improvements as shown on City of Tucson approved plan number I-2018-008 (all in accordance with Pima Associates of Governments (PAG) Standards and Specifications and Details). Construction inspection will be performed by the City of Tucson Department of Transportation in accordance with PAG Standards and Specifications. Any required special inspection shall be performed by the developer's engineer of record. The developer/contractor shall be responsible for the backfill of all wet and dry utility trenches per PAG Standards and Specifications for Public Improvements. Compaction and material testing reports and construction surveillance notes pertaining to the backfilling of the utility trenches must be submitted to the City of Tucson Department of Transportation, Permits and Codes Section, for review prior to start of construction.
T18PI00016 Final 06/26/2018 01/24/2022 PAVING Construction/Installation of offsite Improvements associated with Valencia Crossing Neighborhoods 3 & 4 , which comprises of installation, back-filling, grading and all clean-up necessary to install those improvements as shown on City of Tucson approved plan number I-2018-010 (all in accordance with Pima Associates of Governments (PAG) Standards and Specifications and Details). Construction inspection will be performed by the City of Tucson Department of Transportation in accordance with PAG Standards and Specifications. Any required special inspection shall be performed by the developer's engineer of record. The developer/contractor shall be responsible for the backfill of all wet and dry utility trenches per PAG Standards and Specifications for Public Improvements. Compaction and material testing reports and construction surveillance notes pertaining to the backfilling of the utility trenches must be submitted to the City of Tucson Department of Transportation, Permits and Codes Section, for review prior to start of construction.
T18PRE0012 Closed 01/26/2018 N/A NEIGHBORHOOD NOTIFICATION