Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Parcel Search: 140324360
Parcel Search
Annexations & Original City Zoning (OCZ)
Date - 04/16/2025 10:15 p.m.
Total Number Of OZC Plans - (1)
Rezoning Cases
Date - 04/16/2025 10:15 p.m.
Total Number Of Rezone Cases - (1)
Case No. | Description | New Zone | Status | Status Date | Address |
---|---|---|---|---|---|
C9-90-18 | Gugino/Graves - Alvernon Way | I-1 | Effectuated | 10/28/2009 | E MESQUITE DESERT |
Permits
Parcel Number - 140324360
Date - 04/16/2025 10:15 p.m.
Total Number Of Permits - (5)
Permit | Permit Status | Entered Date | Expired Date | Unit | Type | Description |
---|---|---|---|---|---|---|
TC-SOL-0225-00215 | Issued | 02/21/2025 | 08/20/2025 | Solar | Due to the fact that this project may be within a regulated floodplain and requires a Floodplain Use Review (FUP.), we have moved this project into a standard 30 Day Review Time Frame. Please start a new FUP at our permit application web page: https://tdc-online.tucsonaz.gov/#/home NOTE: Documentation of a cost estimate will be required for solar installations. The cost estimate must have a cost breakdown, it must include both the cost of materials and the cost of labor, and it may not be a leasing document. Instructions: 1. Navigate into the current project in the “My Work” tab. Within the permit, navigate to the “Sub-Records” tab and click “Apply” on the Floodplain Use Permit Sub-Record 2. Locations -> Confirm the location is accurate to the project. Click “Next” 3. Type -> Fill in the “Square Feet” and “Valuation” boxes with the project area and a contractor-provided cost estimate (See note above: for new structures, input 0). Click “Next” 4. Contacts -> Confirm contacts and add any additional contacts if applicable. Click “Next” 5. More Info -> This will be filled in by the engineer assigned to your case, Click “Next” 6. Attachments -> Please attach the project plan, supporting documentation for the cost estimate (if applicable), and a drainage/hydrology report (if applicable). Click “Next” 7. Signature -> Read the statement and type your name. Sign your name below (You may Enable Type Signature to have the software sign for you.) Click “Next” 8. Review and Submit -> Review all information to ensure accuracy. Click “Submit” Contact Michael Ortiz at michael.ortiz@tucsonaz.gov if you have any questions about the FUP. 3.28 kW DC System- Roof Mount PV w/ storage , derate 175A, existing system | |
TE-FPU-0325-00109 | Void | 03/20/2025 | N/A | Floodplain Use | Due to the fact that this project may be within a regulated floodplain and requires a Floodplain Use Review (FUP.), we have moved this project into a standard 30 Day Review Time Frame. Please start a new FUP at our permit application web page: https://tdc-online.tucsonaz.gov/#/home NOTE: Documentation of a cost estimate will be required for solar installations. The cost estimate must have a cost breakdown, it must include both the cost of materials and the cost of labor, and it may not be a leasing document. Instructions: 1. Navigate into the current project in the “My Work” tab. Within the permit, navigate to the “Sub-Records” tab and click “Apply” on the Floodplain Use Permit Sub-Record 2. Locations -> Confirm the location is accurate to the project. Click “Next” 3. Type -> Fill in the “Square Feet” and “Valuation” boxes with the project area and a contractor-provided cost estimate (See note above: for new structures, input 0). Click “Next” 4. Contacts -> Confirm contacts and add any additional contacts if applicable. Click “Next” 5. More Info -> This will be filled in by the engineer assigned to your case, Click “Next” 6. Attachments -> Please attach the project plan, supporting documentation for the cost estimate (if applicable), and a drainage/hydrology report (if applicable). Click “Next” 7. Signature -> Read the statement and type your name. Sign your name below (You may Enable Type Signature to have the software sign for you.) Click “Next” 8. Review and Submit -> Review all information to ensure accuracy. Click “Submit” Contact Michael Ortiz at michael.ortiz@tucsonaz.gov if you have any questions about the FUP. 3.28 kW DC System- Roof Mount PV w/ storage , derate 175A, existing system | |
T20CM07545 | Expired | 10/30/2020 | 07/06/2021 | Residential Building - One or Two Family | installation of rooftop 5.12kw DC photovoltaic solar system | |
T04CM05412 | C of o | 12/15/2004 | 11/07/2005 | COMBO | SFR:TD#15-70-50 | |
T14CM08248 | Void | 12/04/2014 | N/A | COMBO | INSTALL PV SOLAR SYSTEM |