Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Parcel Search: 14032003B
Parcel Search
Annexations & Original City Zoning (OCZ)
Date - 11/13/2024 2:15 a.m.
Total Number Of OZC Plans - (1)
Permits
Parcel Number - 14032003B
Date - 11/13/2024 2:15 a.m.
Total Number Of Permits - (16)
Permit | Permit Status | Entered Date | Expired Date | Unit | Type | Description |
---|---|---|---|---|---|---|
TC-COM-0124-00006 | Complete | 01/02/2024 | 01/08/2025 | Commercial Building | Gas pressure test(s) for 6 rooms in the 3 building. Room #'s: 3122, 3124, 3126, 3128, 3125, 3131 | |
TF-FOP-0424-00437 | Complete | 04/15/2024 | 05/24/2024 | Fire Operational Permit | Desert View High School - 1.4G pyrotechnics - Special Events Vendor 1.4G with 134 total effects Kevin Luckenbill HP 520-405-0329 Display through graduation - start time 7pm | |
TF-FOP-0423-00910 | Complete | 04/19/2023 | 05/25/2023 | Fire Operational Permit | Desert View HS Graduation 1.4 display on 5/24/23 1.4G display with a total of 134 effects Display during and post graduation Graduation start time 7pm | |
TR-ROW-1123-01373 | Complete | 11/21/2023 | 04/09/2024 | Right-of-Way (ROW) | Install Traffic Signs per Site Map on N/B & S/B Alvernon Way, from Valencia Rd to Benson Hwy, and on E/B and W/B Valencia Rd from Alvernon Way to Benson Hwy/Swan Rd. COT Manager- Hal Feldman 520-649-0778 - PO# 41542 - JB# 72847 | |
T17FO00410 | Void | 05/10/2017 | N/A | FIREOPER | GRADUATION FIREWORKS - DESERT VIEW HS 5/24/17 | |
T18CM01800 | Final | 03/08/2018 | 10/14/2018 | COMBO | (SUNNY SIDE UNIFIED SCHOOL DISTRICT) INSTALL LIGHTING AND OUTLETS IN BASEBALL BATTING CAGES | |
T18CM04952 | Final | 06/25/2018 | 03/09/2020 | COMBO | NEW TMOBILE CELL TOWER | |
T18FO00563 | Final | 07/09/2018 | 11/20/2018 | FIREOPER | Graduation pyro 05/24/18 | |
T18RW02370 | Final | 05/23/2018 | 05/25/2018 | ROW | DESERT VIEW GRADUATION | |
T18RW05154 | Final | 11/19/2018 | 03/05/2019 | ROW | Starting on the S/E corner of S. Antrim Loop and S. Alvernon Way at TEP pole, Overlash to Existing going North for 250' then South 250' riser down pole and Trench /Bore North for 35' continuing East for 300' Placing a 3x3x3 pothole for new cox Vault, continue trench /bore East 300' then South 10' Placing a 3x3x3 pothole for New cox Vault continue trench bore South 3' to Existing T Mobile Vault | |
T19CM05657 | Final | 08/07/2019 | 04/18/2023 | COMBO | E - COMMERCIAL SOLAR ELECTRIC SYSTEM ADDITION | |
T19CM05969 | Withdrwn | 08/20/2019 | N/A | COMBO | ELECTRICAL PANEL CHANGE OUT | |
T19RW02718 | Final | 05/14/2019 | 05/25/2019 | ROW | DESERT VIEW GRADUATION | |
T19RW03755 | Final | 07/03/2019 | 08/07/2019 | ROW | TRENCH/BORE 418 LF FROM THE NE CORNER OF E KEENER WAY / S ANTRIM LP FOR NEW ELECTRICAL LINE TO FACILITY | |
T22CM02575 | Final | 04/07/2022 | 04/02/2023 | COMBO | Swap (3) RRU's and Remove (3) RRU's; Swap (3) Antenna's; Add (1) Hybrid Cable w/Breakout Pendant; Add (1) Junction Box; Add (3) New Horizontal Stiffener Pipes; Add (1) New Back-t0-back Pipe Mount. | |
T22FO00456 | Final | 05/16/2022 | 11/28/2022 | FIREOPER | DESERT VIEW H.S. 5/25/22 KEVIN LUCHENBILL (520)405-0329 |
Plans
Parcel Number - 14032003B
Date - 11/13/2024 2:15 a.m.
Total Number Of Plans - 2
Plan Number | Plan Status | Application Date | Expired Date | Unit | Type | Description |
---|---|---|---|---|---|---|
T07SE00016 | Approved | 06/29/2007 | 08/08/2008 | Map/Use Changes - Entitlements | SE-07-16 Cricket-Valencia Rd - The preliminary development plan dated 6/29/07 proposes to place six antennas on an existing ball-field light pole. | |
T18BA00012 | Submitted | 01/30/2018 | N/A | Basin |