Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Parcel Search: 140294900
Parcel Search
Annexations & Original City Zoning (OCZ)
Date - 11/23/2024 7 p.m.
Total Number Of OZC Plans - (1)
Rezoning Cases
Date - 11/23/2024 7 p.m.
Total Number Of Rezone Cases - (1)
Case No. | Description | New Zone | Status | Status Date | Address |
---|---|---|---|---|---|
C9-01-31 | KB Home - Alvernon Way | R-2 | Effectuated | 12/06/2006 | S SUN VIEW |
Permits
Parcel Number - 140294900
Date - 11/23/2024 7 p.m.
Total Number Of Permits - (5)
Permit | Permit Status | Entered Date | Expired Date | Unit | Type | Description |
---|---|---|---|---|---|---|
T06CM01590 | C of o | 03/22/2006 | 04/08/2007 | COMBO | SFR TD# 16-48-34 | |
T06CM05579 | Final | 10/24/2006 | 02/05/2008 | COMBO | ADDITION:REAR PORCH | |
T13CM01255 | Final | 03/05/2013 | 09/07/2013 | COMBO | RECONNECT - ELECTRIC | |
T13CM07185 | Final | 11/27/2013 | 10/14/2014 | COMBO | GREEN REMODEL; REPLACE WATER HEATER | |
T20RW03533 | Final | 06/23/2020 | 10/31/2020 | ROW | REQUESTING R-DIRECTIONAL TO BORE 1117' WITH (3) 1.25" INNER-DUCT, PLACE (2) 30" X 48" VAULTS AND INTERCEPTING (1) 3048 VAULT, PLACE (1) 2'X5' BORE PITS, STARTING AT 6303 S SUN VIEW WAY & END AT 3825 E BRIGHT VIEW ST ON PROJECT Z3UFBPG211-TUC_TUC30_063 - FIBER INSTALLATION INGRESS/ EGRESS FOR BUSINESS AND RESIDENTIAL ACCESS SHALL BE MAINTAINED. FIELD ADJUSTMENTS MAY BE REQUIRED. PAVEMENT PATCHING IS NECESSARY WHERE PAVEMENT IS CUT. PATCH LIMITS- THE LIMITS OF THE PAVING SHALL BE A MINIMUM OF 1-FT OUTSIDE THE EXCAVATION. POTHOLES SPACED CLOSELY TOGETHER AND WITHIN 8-FT OF EACH OTHER WILL NEED TO BE JOINED TOGETHER BY ONE SURFACE PATCH. BACKFILL WITH CLSM SLURRY OR AGGREGATE BASE COURSE (ABC.) ASPHALTIC CONCRETE USED SHALL BE CITY OF TUCSON MIX NO. 3 OR COT MIX NO. 2 WITH TR-22, INSPECTOR TO ADVISE. REPAIR ALL LANDSCAPING DISTURBED. THIS INCLUDES IRRIGATION, PLANTINGS, GROUNDCOVER, AND HARDSCAPE. GOOD HOUSEKEEPING MEASURES SHALL BE PRACTICED DURING WORK AND CONSTRUCTION. MAINTAIN PEDESTRIAN ACCESS |