Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Parcel Search

 
Parcel Attributes
Parcel140102720
JurisdictionTucson
City of Tucson ZoningMH-2
Tucson WardWard 5
Pima County Data Assessor, Recorder, Treasurer, ...
Parcel Map Map
Address

Annexations & Original City Zoning (OCZ)

Date - 11/14/2024 7:34 a.m.
Total Number Of OZC Plans - (1)
Plan Description Annexation Ordinance Effective Date OCZ Ordinance
C9-60-39 West To Silverbell Road And South To San Xavier Indian Reservation 2014 03/18/1960 2045

Rezoning Cases

Date - 11/14/2024 7:34 a.m.
Total Number Of Rezone Cases - (1)
Case No. Description New Zone Status Status Date Address
C9-98-29 Talmadge - Country Club Road MH-2 Effectuated 04/20/2009 S MESQUITE CLUB

Permits

Parcel Number - 140102720
Date - 11/14/2024 7:34 a.m.
Total Number Of Permits - (8)
Permit Permit Status Entered Date Expired Date Unit Type Description
TR-UTL-0424-00728 Complete 04/08/2024 07/28/2024 Right-of-Way (ROW) - Utility PRJ269597-1 On W Side of 5030 S Mesquite Club Lane on S Treat Ave, Cox to remove and replace existing pedestal with 24x42x24" pedestal. Tie in.
T00BU01784 Expired 06/12/2000 12/30/2000 WALL/FEN WALL:54LF OF 6HI PROTO II TD#14-04-40
T01EL01656 Expired 06/27/2001 12/24/2001 ELECT ELECTRICAL PEDESTAL
T01ME00598 Final 07/13/2001 01/12/2002 MECH AIR COND:NEW
T01MH00377 Expired 06/27/2001 01/02/2002 MH MOBILE HOME:SET UP
T10EL01967 Withdrwn 08/19/2010 N/A ELECT TEP OUTDOOR LIGHTING CODE COMPLIANCE
T10EX00522 Closed 10/28/2010 12/27/2010 EXCAV INSTALLATION OF LIGHT POLE AND ELECTRICAL LINE
T22RW00985 Final 03/16/2022 08/05/2022 ROW CONTINUEING FROM OUT OF ROW, FROM TEP POLE, HEAD SE AND BEGIN 81' AERIAL OVERLASH 288ct FIBER. RISER DOWN POLE, PULL 288ct FIBER THROUGH 125' EXISTING CONDUIT. REMOVE AND REPLACE EXISTING PED. PLACE 4x4' POT HOLE AND NEW COX CAULT. TIE IN. WORK LOCATION IS ON TREAT AVE BEHIND POSTED ADDRESS. ** PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING.