Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

PRO is currently experiencing an outage. Some documents and records may not be available on PRO momentarily. We apologize for the inconvenience and are working to restore full access.

Parcel Search
 
Parcel Attributes
Parcel138234820
JurisdictionTucson, Pima County
City of Tucson ZoningR-1
Tucson WardWard 1
Tucson Registered NeighborhoodElvira
Major Street & Route

Arterial or Collector

Pima County Data Assessor, Recorder, Treasurer, ...
Parcel Map Map
Address
Parcel Attributes Issue?

Annexations & Original City Zoning (OCZ)

Date - 09/08/2026 5:08 p.m.
Total Number Of OZC Plans - (1)
Plan Description Annexation Ordinance Effective Date OCZ Ordinance
C9-60-39 West To Silverbell Road And South To San Xavier Indian Reservation 2014 03/18/1960 2045

Rezoning Cases

Date - 09/08/2026 5:08 p.m.
Total Number Of Rezone Cases - (1)
Case No. Description New Zone Status Status Date Address
C9-81-25 Tucson Property Consultants - Santa Clara Avenue R-2 Expired 10/13/2010 729 W LIGHTSTAR

Permits

Parcel Number - 138234820
Date - 09/08/2026 5:08 p.m.
Total Number Of Permits - (48)
Permit Permit Status Entered Date Expired Date Unit Type Description
TR-UTL-0423-01312 Complete 04/14/2023 07/02/2023 Right-of-Way (ROW) - Utility EXCAVATE (1) 5'X5' BELL HOLE IN CONCRETE SIDEWAK, (1) 5'X5' BELL HOLE IN ASPHALT, AND (1) 3'X15' TRENCH CROSSING W LIGHTSTAR CIR FOR GAS SERVICE REPLACEMENT.
TR-ROW-1223-01487 Void 12/29/2023 N/A Right-of-Way (ROW) KE&G will be preforming milling and paving operations in the Barrio Nopal and Elvira neighborhoods including concrete sidewalk and ADA ramps.
TR-ROW-1223-01487 Void 12/29/2023 N/A BLDG 1 Right-of-Way (ROW) KE&G will be preforming milling and paving operations in the Barrio Nopal and Elvira neighborhoods including concrete sidewalk and ADA ramps.
TR-ROW-1223-01487 Void 12/29/2023 N/A BLDG 1 UNIT 1 Right-of-Way (ROW) KE&G will be preforming milling and paving operations in the Barrio Nopal and Elvira neighborhoods including concrete sidewalk and ADA ramps.
TR-ROW-1223-01487 Void 12/29/2023 N/A BLDG 1 UNIT 2 Right-of-Way (ROW) KE&G will be preforming milling and paving operations in the Barrio Nopal and Elvira neighborhoods including concrete sidewalk and ADA ramps.
TR-ROW-1223-01487 Void 12/29/2023 N/A BLDG 2 Right-of-Way (ROW) KE&G will be preforming milling and paving operations in the Barrio Nopal and Elvira neighborhoods including concrete sidewalk and ADA ramps.
TR-ROW-1223-01487 Void 12/29/2023 N/A BLDG 2 UNIT 1 Right-of-Way (ROW) KE&G will be preforming milling and paving operations in the Barrio Nopal and Elvira neighborhoods including concrete sidewalk and ADA ramps.
TR-ROW-1223-01487 Void 12/29/2023 N/A BLDG 2 UNIT 2 Right-of-Way (ROW) KE&G will be preforming milling and paving operations in the Barrio Nopal and Elvira neighborhoods including concrete sidewalk and ADA ramps.
TR-ROW-1223-01487 Void 12/29/2023 N/A BLDG 3 Right-of-Way (ROW) KE&G will be preforming milling and paving operations in the Barrio Nopal and Elvira neighborhoods including concrete sidewalk and ADA ramps.
TR-ROW-1223-01487 Void 12/29/2023 N/A BLDG 3 UNIT 1 Right-of-Way (ROW) KE&G will be preforming milling and paving operations in the Barrio Nopal and Elvira neighborhoods including concrete sidewalk and ADA ramps.
TR-ROW-1223-01487 Void 12/29/2023 N/A BLDG 3 UNIT 2 Right-of-Way (ROW) KE&G will be preforming milling and paving operations in the Barrio Nopal and Elvira neighborhoods including concrete sidewalk and ADA ramps.
TR-ROW-1223-01487 Void 12/29/2023 N/A BLDG 4 Right-of-Way (ROW) KE&G will be preforming milling and paving operations in the Barrio Nopal and Elvira neighborhoods including concrete sidewalk and ADA ramps.
TR-ROW-1223-01487 Void 12/29/2023 N/A BLDG 4 UNIT 1 Right-of-Way (ROW) KE&G will be preforming milling and paving operations in the Barrio Nopal and Elvira neighborhoods including concrete sidewalk and ADA ramps.
TR-ROW-1223-01487 Void 12/29/2023 N/A BLDG 4 UNIT 2 Right-of-Way (ROW) KE&G will be preforming milling and paving operations in the Barrio Nopal and Elvira neighborhoods including concrete sidewalk and ADA ramps.
TR-ROW-1223-01487 Void 12/29/2023 N/A BLDG 5 Right-of-Way (ROW) KE&G will be preforming milling and paving operations in the Barrio Nopal and Elvira neighborhoods including concrete sidewalk and ADA ramps.
TR-ROW-1223-01487 Void 12/29/2023 N/A BLDG 6 Right-of-Way (ROW) KE&G will be preforming milling and paving operations in the Barrio Nopal and Elvira neighborhoods including concrete sidewalk and ADA ramps.
TR-ROW-1223-01487 Void 12/29/2023 N/A BLDG 7 Right-of-Way (ROW) KE&G will be preforming milling and paving operations in the Barrio Nopal and Elvira neighborhoods including concrete sidewalk and ADA ramps.
TR-ROW-1223-01487 Void 12/29/2023 N/A UNIT 1 Right-of-Way (ROW) KE&G will be preforming milling and paving operations in the Barrio Nopal and Elvira neighborhoods including concrete sidewalk and ADA ramps.
TR-ROW-1223-01487 Void 12/29/2023 N/A UNIT 10 Right-of-Way (ROW) KE&G will be preforming milling and paving operations in the Barrio Nopal and Elvira neighborhoods including concrete sidewalk and ADA ramps.
TR-ROW-1223-01487 Void 12/29/2023 N/A UNIT 11 Right-of-Way (ROW) KE&G will be preforming milling and paving operations in the Barrio Nopal and Elvira neighborhoods including concrete sidewalk and ADA ramps.
TR-ROW-1223-01487 Void 12/29/2023 N/A UNIT 12 Right-of-Way (ROW) KE&G will be preforming milling and paving operations in the Barrio Nopal and Elvira neighborhoods including concrete sidewalk and ADA ramps.
TR-ROW-1223-01487 Void 12/29/2023 N/A UNIT 13 Right-of-Way (ROW) KE&G will be preforming milling and paving operations in the Barrio Nopal and Elvira neighborhoods including concrete sidewalk and ADA ramps.
TR-ROW-1223-01487 Void 12/29/2023 N/A UNIT 14 Right-of-Way (ROW) KE&G will be preforming milling and paving operations in the Barrio Nopal and Elvira neighborhoods including concrete sidewalk and ADA ramps.
TR-ROW-1223-01487 Void 12/29/2023 N/A UNIT 15 Right-of-Way (ROW) KE&G will be preforming milling and paving operations in the Barrio Nopal and Elvira neighborhoods including concrete sidewalk and ADA ramps.
TR-ROW-1223-01487 Void 12/29/2023 N/A UNIT 16 Right-of-Way (ROW) KE&G will be preforming milling and paving operations in the Barrio Nopal and Elvira neighborhoods including concrete sidewalk and ADA ramps.
TR-ROW-1223-01487 Void 12/29/2023 N/A UNIT 17 Right-of-Way (ROW) KE&G will be preforming milling and paving operations in the Barrio Nopal and Elvira neighborhoods including concrete sidewalk and ADA ramps.
TR-ROW-1223-01487 Void 12/29/2023 N/A UNIT 18 Right-of-Way (ROW) KE&G will be preforming milling and paving operations in the Barrio Nopal and Elvira neighborhoods including concrete sidewalk and ADA ramps.
TR-ROW-1223-01487 Void 12/29/2023 N/A UNIT 19 Right-of-Way (ROW) KE&G will be preforming milling and paving operations in the Barrio Nopal and Elvira neighborhoods including concrete sidewalk and ADA ramps.
TR-ROW-1223-01487 Void 12/29/2023 N/A UNIT 19A Right-of-Way (ROW) KE&G will be preforming milling and paving operations in the Barrio Nopal and Elvira neighborhoods including concrete sidewalk and ADA ramps.
TR-ROW-1223-01487 Void 12/29/2023 N/A UNIT 19B Right-of-Way (ROW) KE&G will be preforming milling and paving operations in the Barrio Nopal and Elvira neighborhoods including concrete sidewalk and ADA ramps.
TR-ROW-1223-01487 Void 12/29/2023 N/A UNIT 19C Right-of-Way (ROW) KE&G will be preforming milling and paving operations in the Barrio Nopal and Elvira neighborhoods including concrete sidewalk and ADA ramps.
TR-ROW-1223-01487 Void 12/29/2023 N/A UNIT 2 Right-of-Way (ROW) KE&G will be preforming milling and paving operations in the Barrio Nopal and Elvira neighborhoods including concrete sidewalk and ADA ramps.
TR-ROW-1223-01487 Void 12/29/2023 N/A UNIT 2101 Right-of-Way (ROW) KE&G will be preforming milling and paving operations in the Barrio Nopal and Elvira neighborhoods including concrete sidewalk and ADA ramps.
TR-ROW-1223-01487 Void 12/29/2023 N/A UNIT 2104 Right-of-Way (ROW) KE&G will be preforming milling and paving operations in the Barrio Nopal and Elvira neighborhoods including concrete sidewalk and ADA ramps.
TR-ROW-1223-01487 Void 12/29/2023 N/A UNIT 3 Right-of-Way (ROW) KE&G will be preforming milling and paving operations in the Barrio Nopal and Elvira neighborhoods including concrete sidewalk and ADA ramps.
TR-ROW-1223-01487 Void 12/29/2023 N/A UNIT 3101 Right-of-Way (ROW) KE&G will be preforming milling and paving operations in the Barrio Nopal and Elvira neighborhoods including concrete sidewalk and ADA ramps.
TR-ROW-1223-01487 Void 12/29/2023 N/A UNIT 3102 Right-of-Way (ROW) KE&G will be preforming milling and paving operations in the Barrio Nopal and Elvira neighborhoods including concrete sidewalk and ADA ramps.
TR-ROW-1223-01487 Void 12/29/2023 N/A UNIT 4 Right-of-Way (ROW) KE&G will be preforming milling and paving operations in the Barrio Nopal and Elvira neighborhoods including concrete sidewalk and ADA ramps.
TR-ROW-1223-01487 Void 12/29/2023 N/A UNIT 5 Right-of-Way (ROW) KE&G will be preforming milling and paving operations in the Barrio Nopal and Elvira neighborhoods including concrete sidewalk and ADA ramps.
TR-ROW-1223-01487 Void 12/29/2023 N/A UNIT 6 Right-of-Way (ROW) KE&G will be preforming milling and paving operations in the Barrio Nopal and Elvira neighborhoods including concrete sidewalk and ADA ramps.
TR-ROW-1223-01487 Void 12/29/2023 N/A UNIT 7 Right-of-Way (ROW) KE&G will be preforming milling and paving operations in the Barrio Nopal and Elvira neighborhoods including concrete sidewalk and ADA ramps.
TR-ROW-1223-01487 Void 12/29/2023 N/A UNIT 8 Right-of-Way (ROW) KE&G will be preforming milling and paving operations in the Barrio Nopal and Elvira neighborhoods including concrete sidewalk and ADA ramps.
TR-ROW-1223-01487 Void 12/29/2023 N/A UNIT 9 Right-of-Way (ROW) KE&G will be preforming milling and paving operations in the Barrio Nopal and Elvira neighborhoods including concrete sidewalk and ADA ramps.
TR-ROW-1223-01487 Void 12/29/2023 N/A UNIT M1 Right-of-Way (ROW) KE&G will be preforming milling and paving operations in the Barrio Nopal and Elvira neighborhoods including concrete sidewalk and ADA ramps.
TR-ROW-1223-01487 Void 12/29/2023 N/A UNIT M2 Right-of-Way (ROW) KE&G will be preforming milling and paving operations in the Barrio Nopal and Elvira neighborhoods including concrete sidewalk and ADA ramps.
T00EL02679 Final 11/16/2000 06/10/2001 ELECT INSTALL:ELECTRIC PEDESTAL
T00ME01525 Final 12/22/2000 06/25/2001 MECH A/C:REPLACEMENT(APA)
T00MH00611 Expired 11/16/2000 06/10/2001 MH MANUFACTURED HOME:SET UP

Code Enforcement

Parcel Number - 138234820
Date - 09/08/2026 5:08 p.m.
Total Number Of Code Cases - 1
Case Number Case Status Entered Date Closed Date Unit Type Description
T06DV02525 Void 11/30/2006 N/A DNR_VIOL SEVERAL JMVS ALONG SIDEWALK