Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Parcel Search
 
Parcel Attributes
Parcel138230640
JurisdictionTucson, Pima County
Water Course

Wash

City of Tucson ZoningR-1
Tucson WardWard 1
Tucson Registered NeighborhoodElvira
Major Street & Route

Arterial or Collector

Pima County Data Assessor, Recorder, Treasurer, ...
Parcel Map Map
Address
Parcel Attributes Issue?

Annexations & Original City Zoning (OCZ)

Date - 08/17/2026 6:03 p.m.
Total Number Of OZC Plans - (1)
Plan Description Annexation Ordinance Effective Date OCZ Ordinance
C9-60-39 West To Silverbell Road And South To San Xavier Indian Reservation 2014 03/18/1960 2045

Permits

Parcel Number - 138230640
Date - 08/17/2026 6:03 p.m.
Total Number Of Permits - (45)
Permit Permit Status Entered Date Expired Date Unit Type Description
TC-RES-0323-03961 Issued 03/29/2023 09/25/2023 Residential Building - One or Two Family REPLACE 200 AMP OVERHEAD RISER CONDUIT AND WIRE
TR-ROW-0925-01206 Void 09/30/2025 04/20/2026 Right-of-Way (ROW) Mission Manor neighborhood MAIN REPLACEMENT- the quarter section is delineated from W Calle Medina to Elvira Road, and S Santa Clara Avenue to S 12th Avenue. Latitude is 32.1288°, longitude is -110.9800°. Streets included in construction are W Calle Sevilla, W Calle Rita, W Calle Rita Ct, W Calle Aragon, W Calle Colado, S 14th Ave, W Elvira Rd, and Santa Clara Ave. 10/20/2025 - 6/30/2026, ~8 months Right of way will be impacted daily, but not in the same spot. Construction will finish each street entirely before moving on to the next street, starting with W Calle Rita, then W Calle Sevilla, then Elvira Rd, then Calle Colado and 14th Ave, then Calle Aragon. These streets will have rolling closures impacting only the segment we are working on. Closures will be ~300-500 LF. 1/27/26- 90 DAY RENEWAL AS OF 1/20/26 (REQUESTED UNDER TUCSON WATER). NEW EXPIRATION 4/20/26. 04/06/2026 - **DENIED ONLY ONE RENEWAL ALLOWED FOR EACH PERMIT PLEASE APPLY WITH NEW PERMIT THANKS**
TC-RES-1225-05929 Complete 12/10/2025 09/21/2026 Residential Building - One or Two Family Installation of new private plumbing from meter replacement service line renewal to home.
TR-ROW-1223-01485 Void 12/29/2023 N/A Right-of-Way (ROW) KE&G will be preforming milling and paving operations in the Barrio Nopal & Elvira neighborhoods including concrete work consisting of sidewalk and ADA ramps.
TR-ROW-1223-01485 Void 12/29/2023 N/A BLDG 1 Right-of-Way (ROW) KE&G will be preforming milling and paving operations in the Barrio Nopal & Elvira neighborhoods including concrete work consisting of sidewalk and ADA ramps.
TR-ROW-1223-01485 Void 12/29/2023 N/A BLDG 1 UNIT 1 Right-of-Way (ROW) KE&G will be preforming milling and paving operations in the Barrio Nopal & Elvira neighborhoods including concrete work consisting of sidewalk and ADA ramps.
TR-ROW-1223-01485 Void 12/29/2023 N/A BLDG 1 UNIT 2 Right-of-Way (ROW) KE&G will be preforming milling and paving operations in the Barrio Nopal & Elvira neighborhoods including concrete work consisting of sidewalk and ADA ramps.
TR-ROW-1223-01485 Void 12/29/2023 N/A BLDG 2 Right-of-Way (ROW) KE&G will be preforming milling and paving operations in the Barrio Nopal & Elvira neighborhoods including concrete work consisting of sidewalk and ADA ramps.
TR-ROW-1223-01485 Void 12/29/2023 N/A BLDG 2 UNIT 1 Right-of-Way (ROW) KE&G will be preforming milling and paving operations in the Barrio Nopal & Elvira neighborhoods including concrete work consisting of sidewalk and ADA ramps.
TR-ROW-1223-01485 Void 12/29/2023 N/A BLDG 2 UNIT 2 Right-of-Way (ROW) KE&G will be preforming milling and paving operations in the Barrio Nopal & Elvira neighborhoods including concrete work consisting of sidewalk and ADA ramps.
TR-ROW-1223-01485 Void 12/29/2023 N/A BLDG 3 Right-of-Way (ROW) KE&G will be preforming milling and paving operations in the Barrio Nopal & Elvira neighborhoods including concrete work consisting of sidewalk and ADA ramps.
TR-ROW-1223-01485 Void 12/29/2023 N/A BLDG 3 UNIT 1 Right-of-Way (ROW) KE&G will be preforming milling and paving operations in the Barrio Nopal & Elvira neighborhoods including concrete work consisting of sidewalk and ADA ramps.
TR-ROW-1223-01485 Void 12/29/2023 N/A BLDG 3 UNIT 2 Right-of-Way (ROW) KE&G will be preforming milling and paving operations in the Barrio Nopal & Elvira neighborhoods including concrete work consisting of sidewalk and ADA ramps.
TR-ROW-1223-01485 Void 12/29/2023 N/A BLDG 4 Right-of-Way (ROW) KE&G will be preforming milling and paving operations in the Barrio Nopal & Elvira neighborhoods including concrete work consisting of sidewalk and ADA ramps.
TR-ROW-1223-01485 Void 12/29/2023 N/A BLDG 4 UNIT 1 Right-of-Way (ROW) KE&G will be preforming milling and paving operations in the Barrio Nopal & Elvira neighborhoods including concrete work consisting of sidewalk and ADA ramps.
TR-ROW-1223-01485 Void 12/29/2023 N/A BLDG 4 UNIT 2 Right-of-Way (ROW) KE&G will be preforming milling and paving operations in the Barrio Nopal & Elvira neighborhoods including concrete work consisting of sidewalk and ADA ramps.
TR-ROW-1223-01485 Void 12/29/2023 N/A UNIT 1 Right-of-Way (ROW) KE&G will be preforming milling and paving operations in the Barrio Nopal & Elvira neighborhoods including concrete work consisting of sidewalk and ADA ramps.
TR-ROW-1223-01485 Void 12/29/2023 N/A UNIT 101 Right-of-Way (ROW) KE&G will be preforming milling and paving operations in the Barrio Nopal & Elvira neighborhoods including concrete work consisting of sidewalk and ADA ramps.
TR-ROW-1223-01485 Void 12/29/2023 N/A UNIT 102 Right-of-Way (ROW) KE&G will be preforming milling and paving operations in the Barrio Nopal & Elvira neighborhoods including concrete work consisting of sidewalk and ADA ramps.
TR-ROW-1223-01485 Void 12/29/2023 N/A UNIT 103 Right-of-Way (ROW) KE&G will be preforming milling and paving operations in the Barrio Nopal & Elvira neighborhoods including concrete work consisting of sidewalk and ADA ramps.
TR-ROW-1223-01485 Void 12/29/2023 N/A UNIT 104 Right-of-Way (ROW) KE&G will be preforming milling and paving operations in the Barrio Nopal & Elvira neighborhoods including concrete work consisting of sidewalk and ADA ramps.
TR-ROW-1223-01485 Void 12/29/2023 N/A UNIT 1101 Right-of-Way (ROW) KE&G will be preforming milling and paving operations in the Barrio Nopal & Elvira neighborhoods including concrete work consisting of sidewalk and ADA ramps.
TR-ROW-1223-01485 Void 12/29/2023 N/A UNIT 1102 Right-of-Way (ROW) KE&G will be preforming milling and paving operations in the Barrio Nopal & Elvira neighborhoods including concrete work consisting of sidewalk and ADA ramps.
TR-ROW-1223-01485 Void 12/29/2023 N/A UNIT 1103 Right-of-Way (ROW) KE&G will be preforming milling and paving operations in the Barrio Nopal & Elvira neighborhoods including concrete work consisting of sidewalk and ADA ramps.
TR-ROW-1223-01485 Void 12/29/2023 N/A UNIT 1104 Right-of-Way (ROW) KE&G will be preforming milling and paving operations in the Barrio Nopal & Elvira neighborhoods including concrete work consisting of sidewalk and ADA ramps.
TR-ROW-1223-01485 Void 12/29/2023 N/A UNIT 1105 Right-of-Way (ROW) KE&G will be preforming milling and paving operations in the Barrio Nopal & Elvira neighborhoods including concrete work consisting of sidewalk and ADA ramps.
TR-ROW-1223-01485 Void 12/29/2023 N/A UNIT 2 Right-of-Way (ROW) KE&G will be preforming milling and paving operations in the Barrio Nopal & Elvira neighborhoods including concrete work consisting of sidewalk and ADA ramps.
TR-ROW-1223-01485 Void 12/29/2023 N/A UNIT 2102 Right-of-Way (ROW) KE&G will be preforming milling and paving operations in the Barrio Nopal & Elvira neighborhoods including concrete work consisting of sidewalk and ADA ramps.
TR-ROW-1223-01485 Void 12/29/2023 N/A UNIT 2103 Right-of-Way (ROW) KE&G will be preforming milling and paving operations in the Barrio Nopal & Elvira neighborhoods including concrete work consisting of sidewalk and ADA ramps.
TR-ROW-1223-01485 Void 12/29/2023 N/A UNIT 2105 Right-of-Way (ROW) KE&G will be preforming milling and paving operations in the Barrio Nopal & Elvira neighborhoods including concrete work consisting of sidewalk and ADA ramps.
TR-ROW-1223-01485 Void 12/29/2023 N/A UNIT 3 Right-of-Way (ROW) KE&G will be preforming milling and paving operations in the Barrio Nopal & Elvira neighborhoods including concrete work consisting of sidewalk and ADA ramps.
TR-ROW-1223-01485 Void 12/29/2023 N/A UNIT 3103 Right-of-Way (ROW) KE&G will be preforming milling and paving operations in the Barrio Nopal & Elvira neighborhoods including concrete work consisting of sidewalk and ADA ramps.
TR-ROW-1223-01485 Void 12/29/2023 N/A UNIT 3104 Right-of-Way (ROW) KE&G will be preforming milling and paving operations in the Barrio Nopal & Elvira neighborhoods including concrete work consisting of sidewalk and ADA ramps.
TR-ROW-1223-01485 Void 12/29/2023 N/A UNIT 3105 Right-of-Way (ROW) KE&G will be preforming milling and paving operations in the Barrio Nopal & Elvira neighborhoods including concrete work consisting of sidewalk and ADA ramps.
TR-ROW-1223-01485 Void 12/29/2023 N/A UNIT 4 Right-of-Way (ROW) KE&G will be preforming milling and paving operations in the Barrio Nopal & Elvira neighborhoods including concrete work consisting of sidewalk and ADA ramps.
TR-ROW-1223-01485 Void 12/29/2023 N/A UNIT 5 Right-of-Way (ROW) KE&G will be preforming milling and paving operations in the Barrio Nopal & Elvira neighborhoods including concrete work consisting of sidewalk and ADA ramps.
TR-ROW-1223-01485 Void 12/29/2023 N/A UNIT 6 Right-of-Way (ROW) KE&G will be preforming milling and paving operations in the Barrio Nopal & Elvira neighborhoods including concrete work consisting of sidewalk and ADA ramps.
TR-ROW-1223-01485 Void 12/29/2023 N/A UNIT 7 Right-of-Way (ROW) KE&G will be preforming milling and paving operations in the Barrio Nopal & Elvira neighborhoods including concrete work consisting of sidewalk and ADA ramps.
TR-ROW-1223-01485 Void 12/29/2023 N/A UNIT 8 Right-of-Way (ROW) KE&G will be preforming milling and paving operations in the Barrio Nopal & Elvira neighborhoods including concrete work consisting of sidewalk and ADA ramps.
TR-ROW-1223-01485 Void 12/29/2023 N/A UNIT M1 Right-of-Way (ROW) KE&G will be preforming milling and paving operations in the Barrio Nopal & Elvira neighborhoods including concrete work consisting of sidewalk and ADA ramps.
TR-ROW-1223-01485 Void 12/29/2023 N/A UNIT M2 Right-of-Way (ROW) KE&G will be preforming milling and paving operations in the Barrio Nopal & Elvira neighborhoods including concrete work consisting of sidewalk and ADA ramps.
T02PL01629 Expired 09/06/2002 03/05/2003 PLUMB RELOCATE:DRAIN ON EXISTING WASHER
T09CM01342 Withdrwn 05/27/2009 N/A COMBO SLAB FOR FUTURE TO ENCLOSE GARAGE
T16RW00907 Expired 08/03/2016 09/02/2016 ROW 4LF EAST SIDE OF ADDRESS DIRT EASEMENT REPAIR MAIN EMERGENCY
T17CM05694 Expired 07/25/2017 02/10/2018 COMBO UPGRADE TO 200 AMPS