Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Parcel Search
 
Parcel Attributes
Parcel138211260
JurisdictionTucson, Pima County
City of Tucson ZoningR-1
Tucson WardWard 1
Tucson Registered NeighborhoodBarrio Nopal
Pima County Data Assessor, Recorder, Treasurer, ...
Parcel Map Map
Address
Parcel Attributes Issue?

Annexations & Original City Zoning (OCZ)

Date - 08/17/2026 12:34 p.m.
Total Number Of OZC Plans - (1)
Plan Description Annexation Ordinance Effective Date OCZ Ordinance
C9-60-39 West To Silverbell Road And South To San Xavier Indian Reservation 2014 03/18/1960 2045

Permits

Parcel Number - 138211260
Date - 08/17/2026 12:34 p.m.
Total Number Of Permits - (49)
Permit Permit Status Entered Date Expired Date Unit Type Description
TR-ROW-1223-01487 Void 12/29/2023 N/A Right-of-Way (ROW) KE&G will be preforming milling and paving operations in the Barrio Nopal and Elvira neighborhoods including concrete sidewalk and ADA ramps.
TR-ROW-1223-01487 Void 12/29/2023 N/A BLDG 1 Right-of-Way (ROW) KE&G will be preforming milling and paving operations in the Barrio Nopal and Elvira neighborhoods including concrete sidewalk and ADA ramps.
TR-ROW-1223-01487 Void 12/29/2023 N/A BLDG 1 UNIT 1 Right-of-Way (ROW) KE&G will be preforming milling and paving operations in the Barrio Nopal and Elvira neighborhoods including concrete sidewalk and ADA ramps.
TR-ROW-1223-01487 Void 12/29/2023 N/A BLDG 1 UNIT 2 Right-of-Way (ROW) KE&G will be preforming milling and paving operations in the Barrio Nopal and Elvira neighborhoods including concrete sidewalk and ADA ramps.
TR-ROW-1223-01487 Void 12/29/2023 N/A BLDG 2 Right-of-Way (ROW) KE&G will be preforming milling and paving operations in the Barrio Nopal and Elvira neighborhoods including concrete sidewalk and ADA ramps.
TR-ROW-1223-01487 Void 12/29/2023 N/A BLDG 2 UNIT 1 Right-of-Way (ROW) KE&G will be preforming milling and paving operations in the Barrio Nopal and Elvira neighborhoods including concrete sidewalk and ADA ramps.
TR-ROW-1223-01487 Void 12/29/2023 N/A BLDG 2 UNIT 2 Right-of-Way (ROW) KE&G will be preforming milling and paving operations in the Barrio Nopal and Elvira neighborhoods including concrete sidewalk and ADA ramps.
TR-ROW-1223-01487 Void 12/29/2023 N/A BLDG 3 Right-of-Way (ROW) KE&G will be preforming milling and paving operations in the Barrio Nopal and Elvira neighborhoods including concrete sidewalk and ADA ramps.
TR-ROW-1223-01487 Void 12/29/2023 N/A BLDG 3 UNIT 1 Right-of-Way (ROW) KE&G will be preforming milling and paving operations in the Barrio Nopal and Elvira neighborhoods including concrete sidewalk and ADA ramps.
TR-ROW-1223-01487 Void 12/29/2023 N/A BLDG 3 UNIT 2 Right-of-Way (ROW) KE&G will be preforming milling and paving operations in the Barrio Nopal and Elvira neighborhoods including concrete sidewalk and ADA ramps.
TR-ROW-1223-01487 Void 12/29/2023 N/A BLDG 4 Right-of-Way (ROW) KE&G will be preforming milling and paving operations in the Barrio Nopal and Elvira neighborhoods including concrete sidewalk and ADA ramps.
TR-ROW-1223-01487 Void 12/29/2023 N/A BLDG 4 UNIT 1 Right-of-Way (ROW) KE&G will be preforming milling and paving operations in the Barrio Nopal and Elvira neighborhoods including concrete sidewalk and ADA ramps.
TR-ROW-1223-01487 Void 12/29/2023 N/A BLDG 4 UNIT 2 Right-of-Way (ROW) KE&G will be preforming milling and paving operations in the Barrio Nopal and Elvira neighborhoods including concrete sidewalk and ADA ramps.
TR-ROW-1223-01487 Void 12/29/2023 N/A BLDG 5 Right-of-Way (ROW) KE&G will be preforming milling and paving operations in the Barrio Nopal and Elvira neighborhoods including concrete sidewalk and ADA ramps.
TR-ROW-1223-01487 Void 12/29/2023 N/A BLDG 6 Right-of-Way (ROW) KE&G will be preforming milling and paving operations in the Barrio Nopal and Elvira neighborhoods including concrete sidewalk and ADA ramps.
TR-ROW-1223-01487 Void 12/29/2023 N/A BLDG 7 Right-of-Way (ROW) KE&G will be preforming milling and paving operations in the Barrio Nopal and Elvira neighborhoods including concrete sidewalk and ADA ramps.
TR-ROW-1223-01487 Void 12/29/2023 N/A UNIT 1 Right-of-Way (ROW) KE&G will be preforming milling and paving operations in the Barrio Nopal and Elvira neighborhoods including concrete sidewalk and ADA ramps.
TR-ROW-1223-01487 Void 12/29/2023 N/A UNIT 10 Right-of-Way (ROW) KE&G will be preforming milling and paving operations in the Barrio Nopal and Elvira neighborhoods including concrete sidewalk and ADA ramps.
TR-ROW-1223-01487 Void 12/29/2023 N/A UNIT 11 Right-of-Way (ROW) KE&G will be preforming milling and paving operations in the Barrio Nopal and Elvira neighborhoods including concrete sidewalk and ADA ramps.
TR-ROW-1223-01487 Void 12/29/2023 N/A UNIT 12 Right-of-Way (ROW) KE&G will be preforming milling and paving operations in the Barrio Nopal and Elvira neighborhoods including concrete sidewalk and ADA ramps.
TR-ROW-1223-01487 Void 12/29/2023 N/A UNIT 13 Right-of-Way (ROW) KE&G will be preforming milling and paving operations in the Barrio Nopal and Elvira neighborhoods including concrete sidewalk and ADA ramps.
TR-ROW-1223-01487 Void 12/29/2023 N/A UNIT 14 Right-of-Way (ROW) KE&G will be preforming milling and paving operations in the Barrio Nopal and Elvira neighborhoods including concrete sidewalk and ADA ramps.
TR-ROW-1223-01487 Void 12/29/2023 N/A UNIT 15 Right-of-Way (ROW) KE&G will be preforming milling and paving operations in the Barrio Nopal and Elvira neighborhoods including concrete sidewalk and ADA ramps.
TR-ROW-1223-01487 Void 12/29/2023 N/A UNIT 16 Right-of-Way (ROW) KE&G will be preforming milling and paving operations in the Barrio Nopal and Elvira neighborhoods including concrete sidewalk and ADA ramps.
TR-ROW-1223-01487 Void 12/29/2023 N/A UNIT 17 Right-of-Way (ROW) KE&G will be preforming milling and paving operations in the Barrio Nopal and Elvira neighborhoods including concrete sidewalk and ADA ramps.
TR-ROW-1223-01487 Void 12/29/2023 N/A UNIT 18 Right-of-Way (ROW) KE&G will be preforming milling and paving operations in the Barrio Nopal and Elvira neighborhoods including concrete sidewalk and ADA ramps.
TR-ROW-1223-01487 Void 12/29/2023 N/A UNIT 19 Right-of-Way (ROW) KE&G will be preforming milling and paving operations in the Barrio Nopal and Elvira neighborhoods including concrete sidewalk and ADA ramps.
TR-ROW-1223-01487 Void 12/29/2023 N/A UNIT 19A Right-of-Way (ROW) KE&G will be preforming milling and paving operations in the Barrio Nopal and Elvira neighborhoods including concrete sidewalk and ADA ramps.
TR-ROW-1223-01487 Void 12/29/2023 N/A UNIT 19B Right-of-Way (ROW) KE&G will be preforming milling and paving operations in the Barrio Nopal and Elvira neighborhoods including concrete sidewalk and ADA ramps.
TR-ROW-1223-01487 Void 12/29/2023 N/A UNIT 19C Right-of-Way (ROW) KE&G will be preforming milling and paving operations in the Barrio Nopal and Elvira neighborhoods including concrete sidewalk and ADA ramps.
TR-ROW-1223-01487 Void 12/29/2023 N/A UNIT 2 Right-of-Way (ROW) KE&G will be preforming milling and paving operations in the Barrio Nopal and Elvira neighborhoods including concrete sidewalk and ADA ramps.
TR-ROW-1223-01487 Void 12/29/2023 N/A UNIT 2101 Right-of-Way (ROW) KE&G will be preforming milling and paving operations in the Barrio Nopal and Elvira neighborhoods including concrete sidewalk and ADA ramps.
TR-ROW-1223-01487 Void 12/29/2023 N/A UNIT 2104 Right-of-Way (ROW) KE&G will be preforming milling and paving operations in the Barrio Nopal and Elvira neighborhoods including concrete sidewalk and ADA ramps.
TR-ROW-1223-01487 Void 12/29/2023 N/A UNIT 3 Right-of-Way (ROW) KE&G will be preforming milling and paving operations in the Barrio Nopal and Elvira neighborhoods including concrete sidewalk and ADA ramps.
TR-ROW-1223-01487 Void 12/29/2023 N/A UNIT 3101 Right-of-Way (ROW) KE&G will be preforming milling and paving operations in the Barrio Nopal and Elvira neighborhoods including concrete sidewalk and ADA ramps.
TR-ROW-1223-01487 Void 12/29/2023 N/A UNIT 3102 Right-of-Way (ROW) KE&G will be preforming milling and paving operations in the Barrio Nopal and Elvira neighborhoods including concrete sidewalk and ADA ramps.
TR-ROW-1223-01487 Void 12/29/2023 N/A UNIT 4 Right-of-Way (ROW) KE&G will be preforming milling and paving operations in the Barrio Nopal and Elvira neighborhoods including concrete sidewalk and ADA ramps.
TR-ROW-1223-01487 Void 12/29/2023 N/A UNIT 5 Right-of-Way (ROW) KE&G will be preforming milling and paving operations in the Barrio Nopal and Elvira neighborhoods including concrete sidewalk and ADA ramps.
TR-ROW-1223-01487 Void 12/29/2023 N/A UNIT 6 Right-of-Way (ROW) KE&G will be preforming milling and paving operations in the Barrio Nopal and Elvira neighborhoods including concrete sidewalk and ADA ramps.
TR-ROW-1223-01487 Void 12/29/2023 N/A UNIT 7 Right-of-Way (ROW) KE&G will be preforming milling and paving operations in the Barrio Nopal and Elvira neighborhoods including concrete sidewalk and ADA ramps.
TR-ROW-1223-01487 Void 12/29/2023 N/A UNIT 8 Right-of-Way (ROW) KE&G will be preforming milling and paving operations in the Barrio Nopal and Elvira neighborhoods including concrete sidewalk and ADA ramps.
TR-ROW-1223-01487 Void 12/29/2023 N/A UNIT 9 Right-of-Way (ROW) KE&G will be preforming milling and paving operations in the Barrio Nopal and Elvira neighborhoods including concrete sidewalk and ADA ramps.
TR-ROW-1223-01487 Void 12/29/2023 N/A UNIT M1 Right-of-Way (ROW) KE&G will be preforming milling and paving operations in the Barrio Nopal and Elvira neighborhoods including concrete sidewalk and ADA ramps.
TR-ROW-1223-01487 Void 12/29/2023 N/A UNIT M2 Right-of-Way (ROW) KE&G will be preforming milling and paving operations in the Barrio Nopal and Elvira neighborhoods including concrete sidewalk and ADA ramps.
T12CM05199 Expired 08/22/2012 02/25/2013 COMBO REPLACE:COOLER WITH HEAT PUMP:RES
T16RW00970 Final 08/11/2016 09/10/2016 ROW (2) 5x5 BELLHOLE IN DIRT IN REAR OF PROPERTY TO REPLACE GAS LINE
T21CM04758 Final 06/08/2021 01/04/2022 COMBO Main panel upgrade
T21CM06852 Final 08/23/2021 10/17/2022 COMBO Solar Self Install
T21CM08136 Final 10/14/2021 07/26/2022 COMBO Porch and Addition

Code Enforcement

Parcel Number - 138211260
Date - 08/17/2026 12:34 p.m.
Total Number Of Code Cases - 1
Case Number Case Status Entered Date Closed Date Unit Type Description
T09DV03893 Complian 07/09/2009 N/A DNR_VIOL SOMEONE IS DUMPING TRASH AND ITS GOING INTO THE YARDS-THIS AREA HAS CURB GB ONLY