Parcel Search: 138200150
Parcel Search
Parcel Attributes
| Parcel | 138200150 |
|---|---|
| Jurisdiction | Tucson, Pima County |
| Water Course | Wash |
| City of Tucson Zoning | R-1 |
| Tucson Ward | Ward 1 |
| Tucson Registered Neighborhood | Barrio Nopal |
| Pima County Data | Assessor, Recorder, Treasurer, ... |
| Parcel Map | Map |
| Address | |
| Parcel Attributes Issue? | |
Annexations & Original City Zoning (OCZ)
Date - 10/11/2026 1:09 a.m.
Total Number Of OZC Plans - (1)
Permits
Parcel Number - 138200150
Date - 10/11/2026 1:09 a.m.
Total Number Of Permits - (83)
| Permit | Permit Status | Entered Date | Expired Date | Unit | Type | Description |
|---|---|---|---|---|---|---|
| TR-ROW-1223-01485 | Void | 12/29/2023 | N/A | Right-of-Way (ROW) | KE&G will be preforming milling and paving operations in the Barrio Nopal & Elvira neighborhoods including concrete work consisting of sidewalk and ADA ramps. | |
| TR-ROW-1223-01485 | Void | 12/29/2023 | N/A | BLDG 1 | Right-of-Way (ROW) | KE&G will be preforming milling and paving operations in the Barrio Nopal & Elvira neighborhoods including concrete work consisting of sidewalk and ADA ramps. |
| TR-ROW-1223-01485 | Void | 12/29/2023 | N/A | BLDG 1 UNIT 1 | Right-of-Way (ROW) | KE&G will be preforming milling and paving operations in the Barrio Nopal & Elvira neighborhoods including concrete work consisting of sidewalk and ADA ramps. |
| TR-ROW-1223-01485 | Void | 12/29/2023 | N/A | BLDG 1 UNIT 2 | Right-of-Way (ROW) | KE&G will be preforming milling and paving operations in the Barrio Nopal & Elvira neighborhoods including concrete work consisting of sidewalk and ADA ramps. |
| TR-ROW-1223-01485 | Void | 12/29/2023 | N/A | BLDG 2 | Right-of-Way (ROW) | KE&G will be preforming milling and paving operations in the Barrio Nopal & Elvira neighborhoods including concrete work consisting of sidewalk and ADA ramps. |
| TR-ROW-1223-01485 | Void | 12/29/2023 | N/A | BLDG 2 UNIT 1 | Right-of-Way (ROW) | KE&G will be preforming milling and paving operations in the Barrio Nopal & Elvira neighborhoods including concrete work consisting of sidewalk and ADA ramps. |
| TR-ROW-1223-01485 | Void | 12/29/2023 | N/A | BLDG 2 UNIT 2 | Right-of-Way (ROW) | KE&G will be preforming milling and paving operations in the Barrio Nopal & Elvira neighborhoods including concrete work consisting of sidewalk and ADA ramps. |
| TR-ROW-1223-01485 | Void | 12/29/2023 | N/A | BLDG 3 | Right-of-Way (ROW) | KE&G will be preforming milling and paving operations in the Barrio Nopal & Elvira neighborhoods including concrete work consisting of sidewalk and ADA ramps. |
| TR-ROW-1223-01485 | Void | 12/29/2023 | N/A | BLDG 3 UNIT 1 | Right-of-Way (ROW) | KE&G will be preforming milling and paving operations in the Barrio Nopal & Elvira neighborhoods including concrete work consisting of sidewalk and ADA ramps. |
| TR-ROW-1223-01485 | Void | 12/29/2023 | N/A | BLDG 3 UNIT 2 | Right-of-Way (ROW) | KE&G will be preforming milling and paving operations in the Barrio Nopal & Elvira neighborhoods including concrete work consisting of sidewalk and ADA ramps. |
| TR-ROW-1223-01485 | Void | 12/29/2023 | N/A | BLDG 4 | Right-of-Way (ROW) | KE&G will be preforming milling and paving operations in the Barrio Nopal & Elvira neighborhoods including concrete work consisting of sidewalk and ADA ramps. |
| TR-ROW-1223-01485 | Void | 12/29/2023 | N/A | BLDG 4 UNIT 1 | Right-of-Way (ROW) | KE&G will be preforming milling and paving operations in the Barrio Nopal & Elvira neighborhoods including concrete work consisting of sidewalk and ADA ramps. |
| TR-ROW-1223-01485 | Void | 12/29/2023 | N/A | BLDG 4 UNIT 2 | Right-of-Way (ROW) | KE&G will be preforming milling and paving operations in the Barrio Nopal & Elvira neighborhoods including concrete work consisting of sidewalk and ADA ramps. |
| TR-ROW-1223-01485 | Void | 12/29/2023 | N/A | UNIT 1 | Right-of-Way (ROW) | KE&G will be preforming milling and paving operations in the Barrio Nopal & Elvira neighborhoods including concrete work consisting of sidewalk and ADA ramps. |
| TR-ROW-1223-01485 | Void | 12/29/2023 | N/A | UNIT 101 | Right-of-Way (ROW) | KE&G will be preforming milling and paving operations in the Barrio Nopal & Elvira neighborhoods including concrete work consisting of sidewalk and ADA ramps. |
| TR-ROW-1223-01485 | Void | 12/29/2023 | N/A | UNIT 102 | Right-of-Way (ROW) | KE&G will be preforming milling and paving operations in the Barrio Nopal & Elvira neighborhoods including concrete work consisting of sidewalk and ADA ramps. |
| TR-ROW-1223-01485 | Void | 12/29/2023 | N/A | UNIT 103 | Right-of-Way (ROW) | KE&G will be preforming milling and paving operations in the Barrio Nopal & Elvira neighborhoods including concrete work consisting of sidewalk and ADA ramps. |
| TR-ROW-1223-01485 | Void | 12/29/2023 | N/A | UNIT 104 | Right-of-Way (ROW) | KE&G will be preforming milling and paving operations in the Barrio Nopal & Elvira neighborhoods including concrete work consisting of sidewalk and ADA ramps. |
| TR-ROW-1223-01485 | Void | 12/29/2023 | N/A | UNIT 1101 | Right-of-Way (ROW) | KE&G will be preforming milling and paving operations in the Barrio Nopal & Elvira neighborhoods including concrete work consisting of sidewalk and ADA ramps. |
| TR-ROW-1223-01485 | Void | 12/29/2023 | N/A | UNIT 1102 | Right-of-Way (ROW) | KE&G will be preforming milling and paving operations in the Barrio Nopal & Elvira neighborhoods including concrete work consisting of sidewalk and ADA ramps. |
| TR-ROW-1223-01485 | Void | 12/29/2023 | N/A | UNIT 1103 | Right-of-Way (ROW) | KE&G will be preforming milling and paving operations in the Barrio Nopal & Elvira neighborhoods including concrete work consisting of sidewalk and ADA ramps. |
| TR-ROW-1223-01485 | Void | 12/29/2023 | N/A | UNIT 1104 | Right-of-Way (ROW) | KE&G will be preforming milling and paving operations in the Barrio Nopal & Elvira neighborhoods including concrete work consisting of sidewalk and ADA ramps. |
| TR-ROW-1223-01485 | Void | 12/29/2023 | N/A | UNIT 1105 | Right-of-Way (ROW) | KE&G will be preforming milling and paving operations in the Barrio Nopal & Elvira neighborhoods including concrete work consisting of sidewalk and ADA ramps. |
| TR-ROW-1223-01485 | Void | 12/29/2023 | N/A | UNIT 2 | Right-of-Way (ROW) | KE&G will be preforming milling and paving operations in the Barrio Nopal & Elvira neighborhoods including concrete work consisting of sidewalk and ADA ramps. |
| TR-ROW-1223-01485 | Void | 12/29/2023 | N/A | UNIT 2102 | Right-of-Way (ROW) | KE&G will be preforming milling and paving operations in the Barrio Nopal & Elvira neighborhoods including concrete work consisting of sidewalk and ADA ramps. |
| TR-ROW-1223-01485 | Void | 12/29/2023 | N/A | UNIT 2103 | Right-of-Way (ROW) | KE&G will be preforming milling and paving operations in the Barrio Nopal & Elvira neighborhoods including concrete work consisting of sidewalk and ADA ramps. |
| TR-ROW-1223-01485 | Void | 12/29/2023 | N/A | UNIT 2105 | Right-of-Way (ROW) | KE&G will be preforming milling and paving operations in the Barrio Nopal & Elvira neighborhoods including concrete work consisting of sidewalk and ADA ramps. |
| TR-ROW-1223-01485 | Void | 12/29/2023 | N/A | UNIT 3 | Right-of-Way (ROW) | KE&G will be preforming milling and paving operations in the Barrio Nopal & Elvira neighborhoods including concrete work consisting of sidewalk and ADA ramps. |
| TR-ROW-1223-01485 | Void | 12/29/2023 | N/A | UNIT 3103 | Right-of-Way (ROW) | KE&G will be preforming milling and paving operations in the Barrio Nopal & Elvira neighborhoods including concrete work consisting of sidewalk and ADA ramps. |
| TR-ROW-1223-01485 | Void | 12/29/2023 | N/A | UNIT 3104 | Right-of-Way (ROW) | KE&G will be preforming milling and paving operations in the Barrio Nopal & Elvira neighborhoods including concrete work consisting of sidewalk and ADA ramps. |
| TR-ROW-1223-01485 | Void | 12/29/2023 | N/A | UNIT 3105 | Right-of-Way (ROW) | KE&G will be preforming milling and paving operations in the Barrio Nopal & Elvira neighborhoods including concrete work consisting of sidewalk and ADA ramps. |
| TR-ROW-1223-01485 | Void | 12/29/2023 | N/A | UNIT 4 | Right-of-Way (ROW) | KE&G will be preforming milling and paving operations in the Barrio Nopal & Elvira neighborhoods including concrete work consisting of sidewalk and ADA ramps. |
| TR-ROW-1223-01485 | Void | 12/29/2023 | N/A | UNIT 5 | Right-of-Way (ROW) | KE&G will be preforming milling and paving operations in the Barrio Nopal & Elvira neighborhoods including concrete work consisting of sidewalk and ADA ramps. |
| TR-ROW-1223-01485 | Void | 12/29/2023 | N/A | UNIT 6 | Right-of-Way (ROW) | KE&G will be preforming milling and paving operations in the Barrio Nopal & Elvira neighborhoods including concrete work consisting of sidewalk and ADA ramps. |
| TR-ROW-1223-01485 | Void | 12/29/2023 | N/A | UNIT 7 | Right-of-Way (ROW) | KE&G will be preforming milling and paving operations in the Barrio Nopal & Elvira neighborhoods including concrete work consisting of sidewalk and ADA ramps. |
| TR-ROW-1223-01485 | Void | 12/29/2023 | N/A | UNIT 8 | Right-of-Way (ROW) | KE&G will be preforming milling and paving operations in the Barrio Nopal & Elvira neighborhoods including concrete work consisting of sidewalk and ADA ramps. |
| TR-ROW-1223-01485 | Void | 12/29/2023 | N/A | UNIT M1 | Right-of-Way (ROW) | KE&G will be preforming milling and paving operations in the Barrio Nopal & Elvira neighborhoods including concrete work consisting of sidewalk and ADA ramps. |
| TR-ROW-1223-01485 | Void | 12/29/2023 | N/A | UNIT M2 | Right-of-Way (ROW) | KE&G will be preforming milling and paving operations in the Barrio Nopal & Elvira neighborhoods including concrete work consisting of sidewalk and ADA ramps. |
| TR-ROW-1223-01487 | Void | 12/29/2023 | N/A | Right-of-Way (ROW) | KE&G will be preforming milling and paving operations in the Barrio Nopal and Elvira neighborhoods including concrete sidewalk and ADA ramps. | |
| TR-ROW-1223-01487 | Void | 12/29/2023 | N/A | BLDG 1 | Right-of-Way (ROW) | KE&G will be preforming milling and paving operations in the Barrio Nopal and Elvira neighborhoods including concrete sidewalk and ADA ramps. |
| TR-ROW-1223-01487 | Void | 12/29/2023 | N/A | BLDG 1 UNIT 1 | Right-of-Way (ROW) | KE&G will be preforming milling and paving operations in the Barrio Nopal and Elvira neighborhoods including concrete sidewalk and ADA ramps. |
| TR-ROW-1223-01487 | Void | 12/29/2023 | N/A | BLDG 1 UNIT 2 | Right-of-Way (ROW) | KE&G will be preforming milling and paving operations in the Barrio Nopal and Elvira neighborhoods including concrete sidewalk and ADA ramps. |
| TR-ROW-1223-01487 | Void | 12/29/2023 | N/A | BLDG 2 | Right-of-Way (ROW) | KE&G will be preforming milling and paving operations in the Barrio Nopal and Elvira neighborhoods including concrete sidewalk and ADA ramps. |
| TR-ROW-1223-01487 | Void | 12/29/2023 | N/A | BLDG 2 UNIT 1 | Right-of-Way (ROW) | KE&G will be preforming milling and paving operations in the Barrio Nopal and Elvira neighborhoods including concrete sidewalk and ADA ramps. |
| TR-ROW-1223-01487 | Void | 12/29/2023 | N/A | BLDG 2 UNIT 2 | Right-of-Way (ROW) | KE&G will be preforming milling and paving operations in the Barrio Nopal and Elvira neighborhoods including concrete sidewalk and ADA ramps. |
| TR-ROW-1223-01487 | Void | 12/29/2023 | N/A | BLDG 3 | Right-of-Way (ROW) | KE&G will be preforming milling and paving operations in the Barrio Nopal and Elvira neighborhoods including concrete sidewalk and ADA ramps. |
| TR-ROW-1223-01487 | Void | 12/29/2023 | N/A | BLDG 3 UNIT 1 | Right-of-Way (ROW) | KE&G will be preforming milling and paving operations in the Barrio Nopal and Elvira neighborhoods including concrete sidewalk and ADA ramps. |
| TR-ROW-1223-01487 | Void | 12/29/2023 | N/A | BLDG 3 UNIT 2 | Right-of-Way (ROW) | KE&G will be preforming milling and paving operations in the Barrio Nopal and Elvira neighborhoods including concrete sidewalk and ADA ramps. |
| TR-ROW-1223-01487 | Void | 12/29/2023 | N/A | BLDG 4 | Right-of-Way (ROW) | KE&G will be preforming milling and paving operations in the Barrio Nopal and Elvira neighborhoods including concrete sidewalk and ADA ramps. |
| TR-ROW-1223-01487 | Void | 12/29/2023 | N/A | BLDG 4 UNIT 1 | Right-of-Way (ROW) | KE&G will be preforming milling and paving operations in the Barrio Nopal and Elvira neighborhoods including concrete sidewalk and ADA ramps. |
| TR-ROW-1223-01487 | Void | 12/29/2023 | N/A | BLDG 4 UNIT 2 | Right-of-Way (ROW) | KE&G will be preforming milling and paving operations in the Barrio Nopal and Elvira neighborhoods including concrete sidewalk and ADA ramps. |
| TR-ROW-1223-01487 | Void | 12/29/2023 | N/A | BLDG 5 | Right-of-Way (ROW) | KE&G will be preforming milling and paving operations in the Barrio Nopal and Elvira neighborhoods including concrete sidewalk and ADA ramps. |
| TR-ROW-1223-01487 | Void | 12/29/2023 | N/A | BLDG 6 | Right-of-Way (ROW) | KE&G will be preforming milling and paving operations in the Barrio Nopal and Elvira neighborhoods including concrete sidewalk and ADA ramps. |
| TR-ROW-1223-01487 | Void | 12/29/2023 | N/A | BLDG 7 | Right-of-Way (ROW) | KE&G will be preforming milling and paving operations in the Barrio Nopal and Elvira neighborhoods including concrete sidewalk and ADA ramps. |
| TR-ROW-1223-01487 | Void | 12/29/2023 | N/A | UNIT 1 | Right-of-Way (ROW) | KE&G will be preforming milling and paving operations in the Barrio Nopal and Elvira neighborhoods including concrete sidewalk and ADA ramps. |
| TR-ROW-1223-01487 | Void | 12/29/2023 | N/A | UNIT 10 | Right-of-Way (ROW) | KE&G will be preforming milling and paving operations in the Barrio Nopal and Elvira neighborhoods including concrete sidewalk and ADA ramps. |
| TR-ROW-1223-01487 | Void | 12/29/2023 | N/A | UNIT 11 | Right-of-Way (ROW) | KE&G will be preforming milling and paving operations in the Barrio Nopal and Elvira neighborhoods including concrete sidewalk and ADA ramps. |
| TR-ROW-1223-01487 | Void | 12/29/2023 | N/A | UNIT 12 | Right-of-Way (ROW) | KE&G will be preforming milling and paving operations in the Barrio Nopal and Elvira neighborhoods including concrete sidewalk and ADA ramps. |
| TR-ROW-1223-01487 | Void | 12/29/2023 | N/A | UNIT 13 | Right-of-Way (ROW) | KE&G will be preforming milling and paving operations in the Barrio Nopal and Elvira neighborhoods including concrete sidewalk and ADA ramps. |
| TR-ROW-1223-01487 | Void | 12/29/2023 | N/A | UNIT 14 | Right-of-Way (ROW) | KE&G will be preforming milling and paving operations in the Barrio Nopal and Elvira neighborhoods including concrete sidewalk and ADA ramps. |
| TR-ROW-1223-01487 | Void | 12/29/2023 | N/A | UNIT 15 | Right-of-Way (ROW) | KE&G will be preforming milling and paving operations in the Barrio Nopal and Elvira neighborhoods including concrete sidewalk and ADA ramps. |
| TR-ROW-1223-01487 | Void | 12/29/2023 | N/A | UNIT 16 | Right-of-Way (ROW) | KE&G will be preforming milling and paving operations in the Barrio Nopal and Elvira neighborhoods including concrete sidewalk and ADA ramps. |
| TR-ROW-1223-01487 | Void | 12/29/2023 | N/A | UNIT 17 | Right-of-Way (ROW) | KE&G will be preforming milling and paving operations in the Barrio Nopal and Elvira neighborhoods including concrete sidewalk and ADA ramps. |
| TR-ROW-1223-01487 | Void | 12/29/2023 | N/A | UNIT 18 | Right-of-Way (ROW) | KE&G will be preforming milling and paving operations in the Barrio Nopal and Elvira neighborhoods including concrete sidewalk and ADA ramps. |
| TR-ROW-1223-01487 | Void | 12/29/2023 | N/A | UNIT 19 | Right-of-Way (ROW) | KE&G will be preforming milling and paving operations in the Barrio Nopal and Elvira neighborhoods including concrete sidewalk and ADA ramps. |
| TR-ROW-1223-01487 | Void | 12/29/2023 | N/A | UNIT 19A | Right-of-Way (ROW) | KE&G will be preforming milling and paving operations in the Barrio Nopal and Elvira neighborhoods including concrete sidewalk and ADA ramps. |
| TR-ROW-1223-01487 | Void | 12/29/2023 | N/A | UNIT 19B | Right-of-Way (ROW) | KE&G will be preforming milling and paving operations in the Barrio Nopal and Elvira neighborhoods including concrete sidewalk and ADA ramps. |
| TR-ROW-1223-01487 | Void | 12/29/2023 | N/A | UNIT 19C | Right-of-Way (ROW) | KE&G will be preforming milling and paving operations in the Barrio Nopal and Elvira neighborhoods including concrete sidewalk and ADA ramps. |
| TR-ROW-1223-01487 | Void | 12/29/2023 | N/A | UNIT 2 | Right-of-Way (ROW) | KE&G will be preforming milling and paving operations in the Barrio Nopal and Elvira neighborhoods including concrete sidewalk and ADA ramps. |
| TR-ROW-1223-01487 | Void | 12/29/2023 | N/A | UNIT 2101 | Right-of-Way (ROW) | KE&G will be preforming milling and paving operations in the Barrio Nopal and Elvira neighborhoods including concrete sidewalk and ADA ramps. |
| TR-ROW-1223-01487 | Void | 12/29/2023 | N/A | UNIT 2104 | Right-of-Way (ROW) | KE&G will be preforming milling and paving operations in the Barrio Nopal and Elvira neighborhoods including concrete sidewalk and ADA ramps. |
| TR-ROW-1223-01487 | Void | 12/29/2023 | N/A | UNIT 3 | Right-of-Way (ROW) | KE&G will be preforming milling and paving operations in the Barrio Nopal and Elvira neighborhoods including concrete sidewalk and ADA ramps. |
| TR-ROW-1223-01487 | Void | 12/29/2023 | N/A | UNIT 3101 | Right-of-Way (ROW) | KE&G will be preforming milling and paving operations in the Barrio Nopal and Elvira neighborhoods including concrete sidewalk and ADA ramps. |
| TR-ROW-1223-01487 | Void | 12/29/2023 | N/A | UNIT 3102 | Right-of-Way (ROW) | KE&G will be preforming milling and paving operations in the Barrio Nopal and Elvira neighborhoods including concrete sidewalk and ADA ramps. |
| TR-ROW-1223-01487 | Void | 12/29/2023 | N/A | UNIT 4 | Right-of-Way (ROW) | KE&G will be preforming milling and paving operations in the Barrio Nopal and Elvira neighborhoods including concrete sidewalk and ADA ramps. |
| TR-ROW-1223-01487 | Void | 12/29/2023 | N/A | UNIT 5 | Right-of-Way (ROW) | KE&G will be preforming milling and paving operations in the Barrio Nopal and Elvira neighborhoods including concrete sidewalk and ADA ramps. |
| TR-ROW-1223-01487 | Void | 12/29/2023 | N/A | UNIT 6 | Right-of-Way (ROW) | KE&G will be preforming milling and paving operations in the Barrio Nopal and Elvira neighborhoods including concrete sidewalk and ADA ramps. |
| TR-ROW-1223-01487 | Void | 12/29/2023 | N/A | UNIT 7 | Right-of-Way (ROW) | KE&G will be preforming milling and paving operations in the Barrio Nopal and Elvira neighborhoods including concrete sidewalk and ADA ramps. |
| TR-ROW-1223-01487 | Void | 12/29/2023 | N/A | UNIT 8 | Right-of-Way (ROW) | KE&G will be preforming milling and paving operations in the Barrio Nopal and Elvira neighborhoods including concrete sidewalk and ADA ramps. |
| TR-ROW-1223-01487 | Void | 12/29/2023 | N/A | UNIT 9 | Right-of-Way (ROW) | KE&G will be preforming milling and paving operations in the Barrio Nopal and Elvira neighborhoods including concrete sidewalk and ADA ramps. |
| TR-ROW-1223-01487 | Void | 12/29/2023 | N/A | UNIT M1 | Right-of-Way (ROW) | KE&G will be preforming milling and paving operations in the Barrio Nopal and Elvira neighborhoods including concrete sidewalk and ADA ramps. |
| TR-ROW-1223-01487 | Void | 12/29/2023 | N/A | UNIT M2 | Right-of-Way (ROW) | KE&G will be preforming milling and paving operations in the Barrio Nopal and Elvira neighborhoods including concrete sidewalk and ADA ramps. |
| T16RW02392 | Final | 10/29/2016 | 12/03/2016 | ROW | (2) 5x5 BELLHOLES IN DIRT ALLEY - TO RELOCATE GAS LINE |
Code Enforcement
Parcel Number - 138200150
Date - 10/11/2026 1:09 a.m.
Total Number Of Code Cases - 1
| Case Number | Case Status | Entered Date | Closed Date | Unit | Type | Description |
|---|---|---|---|---|---|---|
| T19DV01778 | Complian | 03/13/2019 | N/A | DNR_VIOL | overgrown grass & weeds |