Parcel Search: 138191880
Parcel Search
Parcel Attributes
| Parcel | 138191880 |
|---|---|
| Jurisdiction | Tucson, Pima County |
| City of Tucson Zoning | R-1 |
| Tucson Ward | Ward 1 |
| Tucson Registered Neighborhood | Barrio Nopal |
| Pima County Data | Assessor, Recorder, Treasurer, ... |
| Parcel Map | Map |
| Address | |
| Parcel Attributes Issue? | |
Annexations & Original City Zoning (OCZ)
Date - 08/18/2026 7:07 a.m.
Total Number Of OZC Plans - (1)
Special Development Requests & Requirements
Date - 08/18/2026 7:07 a.m.
Total Number Of Special Development Permits - (1)
| Activity Number | Status | Apply Date | Expired Date | Type | Description |
|---|---|---|---|---|---|
| T08SA00373 | Closed | N/A | TO ALLOW THE EXISTING CARPORT BE EXPANDED WITH A REDUCED SIDE YARD SETBACK OF ZERO FOOT TO THE EAST LOT LINE OF THE PROPERTY, AS SHOWN ON THE SITE AND ELEVATION PLANS SUBMITTED FOR THE PROJECT. APPROVED..11/05/08 |
Permits
Parcel Number - 138191880
Date - 08/18/2026 7:07 a.m.
Total Number Of Permits - (42)
| Permit | Permit Status | Entered Date | Expired Date | Unit | Type | Description |
|---|---|---|---|---|---|---|
| TR-ROW-1223-01485 | Void | 12/29/2023 | N/A | Right-of-Way (ROW) | KE&G will be preforming milling and paving operations in the Barrio Nopal & Elvira neighborhoods including concrete work consisting of sidewalk and ADA ramps. | |
| TR-ROW-1223-01485 | Void | 12/29/2023 | N/A | BLDG 1 | Right-of-Way (ROW) | KE&G will be preforming milling and paving operations in the Barrio Nopal & Elvira neighborhoods including concrete work consisting of sidewalk and ADA ramps. |
| TR-ROW-1223-01485 | Void | 12/29/2023 | N/A | BLDG 1 UNIT 1 | Right-of-Way (ROW) | KE&G will be preforming milling and paving operations in the Barrio Nopal & Elvira neighborhoods including concrete work consisting of sidewalk and ADA ramps. |
| TR-ROW-1223-01485 | Void | 12/29/2023 | N/A | BLDG 1 UNIT 2 | Right-of-Way (ROW) | KE&G will be preforming milling and paving operations in the Barrio Nopal & Elvira neighborhoods including concrete work consisting of sidewalk and ADA ramps. |
| TR-ROW-1223-01485 | Void | 12/29/2023 | N/A | BLDG 2 | Right-of-Way (ROW) | KE&G will be preforming milling and paving operations in the Barrio Nopal & Elvira neighborhoods including concrete work consisting of sidewalk and ADA ramps. |
| TR-ROW-1223-01485 | Void | 12/29/2023 | N/A | BLDG 2 UNIT 1 | Right-of-Way (ROW) | KE&G will be preforming milling and paving operations in the Barrio Nopal & Elvira neighborhoods including concrete work consisting of sidewalk and ADA ramps. |
| TR-ROW-1223-01485 | Void | 12/29/2023 | N/A | BLDG 2 UNIT 2 | Right-of-Way (ROW) | KE&G will be preforming milling and paving operations in the Barrio Nopal & Elvira neighborhoods including concrete work consisting of sidewalk and ADA ramps. |
| TR-ROW-1223-01485 | Void | 12/29/2023 | N/A | BLDG 3 | Right-of-Way (ROW) | KE&G will be preforming milling and paving operations in the Barrio Nopal & Elvira neighborhoods including concrete work consisting of sidewalk and ADA ramps. |
| TR-ROW-1223-01485 | Void | 12/29/2023 | N/A | BLDG 3 UNIT 1 | Right-of-Way (ROW) | KE&G will be preforming milling and paving operations in the Barrio Nopal & Elvira neighborhoods including concrete work consisting of sidewalk and ADA ramps. |
| TR-ROW-1223-01485 | Void | 12/29/2023 | N/A | BLDG 3 UNIT 2 | Right-of-Way (ROW) | KE&G will be preforming milling and paving operations in the Barrio Nopal & Elvira neighborhoods including concrete work consisting of sidewalk and ADA ramps. |
| TR-ROW-1223-01485 | Void | 12/29/2023 | N/A | BLDG 4 | Right-of-Way (ROW) | KE&G will be preforming milling and paving operations in the Barrio Nopal & Elvira neighborhoods including concrete work consisting of sidewalk and ADA ramps. |
| TR-ROW-1223-01485 | Void | 12/29/2023 | N/A | BLDG 4 UNIT 1 | Right-of-Way (ROW) | KE&G will be preforming milling and paving operations in the Barrio Nopal & Elvira neighborhoods including concrete work consisting of sidewalk and ADA ramps. |
| TR-ROW-1223-01485 | Void | 12/29/2023 | N/A | BLDG 4 UNIT 2 | Right-of-Way (ROW) | KE&G will be preforming milling and paving operations in the Barrio Nopal & Elvira neighborhoods including concrete work consisting of sidewalk and ADA ramps. |
| TR-ROW-1223-01485 | Void | 12/29/2023 | N/A | UNIT 1 | Right-of-Way (ROW) | KE&G will be preforming milling and paving operations in the Barrio Nopal & Elvira neighborhoods including concrete work consisting of sidewalk and ADA ramps. |
| TR-ROW-1223-01485 | Void | 12/29/2023 | N/A | UNIT 101 | Right-of-Way (ROW) | KE&G will be preforming milling and paving operations in the Barrio Nopal & Elvira neighborhoods including concrete work consisting of sidewalk and ADA ramps. |
| TR-ROW-1223-01485 | Void | 12/29/2023 | N/A | UNIT 102 | Right-of-Way (ROW) | KE&G will be preforming milling and paving operations in the Barrio Nopal & Elvira neighborhoods including concrete work consisting of sidewalk and ADA ramps. |
| TR-ROW-1223-01485 | Void | 12/29/2023 | N/A | UNIT 103 | Right-of-Way (ROW) | KE&G will be preforming milling and paving operations in the Barrio Nopal & Elvira neighborhoods including concrete work consisting of sidewalk and ADA ramps. |
| TR-ROW-1223-01485 | Void | 12/29/2023 | N/A | UNIT 104 | Right-of-Way (ROW) | KE&G will be preforming milling and paving operations in the Barrio Nopal & Elvira neighborhoods including concrete work consisting of sidewalk and ADA ramps. |
| TR-ROW-1223-01485 | Void | 12/29/2023 | N/A | UNIT 1101 | Right-of-Way (ROW) | KE&G will be preforming milling and paving operations in the Barrio Nopal & Elvira neighborhoods including concrete work consisting of sidewalk and ADA ramps. |
| TR-ROW-1223-01485 | Void | 12/29/2023 | N/A | UNIT 1102 | Right-of-Way (ROW) | KE&G will be preforming milling and paving operations in the Barrio Nopal & Elvira neighborhoods including concrete work consisting of sidewalk and ADA ramps. |
| TR-ROW-1223-01485 | Void | 12/29/2023 | N/A | UNIT 1103 | Right-of-Way (ROW) | KE&G will be preforming milling and paving operations in the Barrio Nopal & Elvira neighborhoods including concrete work consisting of sidewalk and ADA ramps. |
| TR-ROW-1223-01485 | Void | 12/29/2023 | N/A | UNIT 1104 | Right-of-Way (ROW) | KE&G will be preforming milling and paving operations in the Barrio Nopal & Elvira neighborhoods including concrete work consisting of sidewalk and ADA ramps. |
| TR-ROW-1223-01485 | Void | 12/29/2023 | N/A | UNIT 1105 | Right-of-Way (ROW) | KE&G will be preforming milling and paving operations in the Barrio Nopal & Elvira neighborhoods including concrete work consisting of sidewalk and ADA ramps. |
| TR-ROW-1223-01485 | Void | 12/29/2023 | N/A | UNIT 2 | Right-of-Way (ROW) | KE&G will be preforming milling and paving operations in the Barrio Nopal & Elvira neighborhoods including concrete work consisting of sidewalk and ADA ramps. |
| TR-ROW-1223-01485 | Void | 12/29/2023 | N/A | UNIT 2102 | Right-of-Way (ROW) | KE&G will be preforming milling and paving operations in the Barrio Nopal & Elvira neighborhoods including concrete work consisting of sidewalk and ADA ramps. |
| TR-ROW-1223-01485 | Void | 12/29/2023 | N/A | UNIT 2103 | Right-of-Way (ROW) | KE&G will be preforming milling and paving operations in the Barrio Nopal & Elvira neighborhoods including concrete work consisting of sidewalk and ADA ramps. |
| TR-ROW-1223-01485 | Void | 12/29/2023 | N/A | UNIT 2105 | Right-of-Way (ROW) | KE&G will be preforming milling and paving operations in the Barrio Nopal & Elvira neighborhoods including concrete work consisting of sidewalk and ADA ramps. |
| TR-ROW-1223-01485 | Void | 12/29/2023 | N/A | UNIT 3 | Right-of-Way (ROW) | KE&G will be preforming milling and paving operations in the Barrio Nopal & Elvira neighborhoods including concrete work consisting of sidewalk and ADA ramps. |
| TR-ROW-1223-01485 | Void | 12/29/2023 | N/A | UNIT 3103 | Right-of-Way (ROW) | KE&G will be preforming milling and paving operations in the Barrio Nopal & Elvira neighborhoods including concrete work consisting of sidewalk and ADA ramps. |
| TR-ROW-1223-01485 | Void | 12/29/2023 | N/A | UNIT 3104 | Right-of-Way (ROW) | KE&G will be preforming milling and paving operations in the Barrio Nopal & Elvira neighborhoods including concrete work consisting of sidewalk and ADA ramps. |
| TR-ROW-1223-01485 | Void | 12/29/2023 | N/A | UNIT 3105 | Right-of-Way (ROW) | KE&G will be preforming milling and paving operations in the Barrio Nopal & Elvira neighborhoods including concrete work consisting of sidewalk and ADA ramps. |
| TR-ROW-1223-01485 | Void | 12/29/2023 | N/A | UNIT 4 | Right-of-Way (ROW) | KE&G will be preforming milling and paving operations in the Barrio Nopal & Elvira neighborhoods including concrete work consisting of sidewalk and ADA ramps. |
| TR-ROW-1223-01485 | Void | 12/29/2023 | N/A | UNIT 5 | Right-of-Way (ROW) | KE&G will be preforming milling and paving operations in the Barrio Nopal & Elvira neighborhoods including concrete work consisting of sidewalk and ADA ramps. |
| TR-ROW-1223-01485 | Void | 12/29/2023 | N/A | UNIT 6 | Right-of-Way (ROW) | KE&G will be preforming milling and paving operations in the Barrio Nopal & Elvira neighborhoods including concrete work consisting of sidewalk and ADA ramps. |
| TR-ROW-1223-01485 | Void | 12/29/2023 | N/A | UNIT 7 | Right-of-Way (ROW) | KE&G will be preforming milling and paving operations in the Barrio Nopal & Elvira neighborhoods including concrete work consisting of sidewalk and ADA ramps. |
| TR-ROW-1223-01485 | Void | 12/29/2023 | N/A | UNIT 8 | Right-of-Way (ROW) | KE&G will be preforming milling and paving operations in the Barrio Nopal & Elvira neighborhoods including concrete work consisting of sidewalk and ADA ramps. |
| TR-ROW-1223-01485 | Void | 12/29/2023 | N/A | UNIT M1 | Right-of-Way (ROW) | KE&G will be preforming milling and paving operations in the Barrio Nopal & Elvira neighborhoods including concrete work consisting of sidewalk and ADA ramps. |
| TR-ROW-1223-01485 | Void | 12/29/2023 | N/A | UNIT M2 | Right-of-Way (ROW) | KE&G will be preforming milling and paving operations in the Barrio Nopal & Elvira neighborhoods including concrete work consisting of sidewalk and ADA ramps. |
| T07BU00658 | Void | 03/27/2007 | N/A | BUILD | ADDT CARPORT | |
| T07CM01232 | Expired | 03/27/2007 | 11/01/2009 | COMBO | ADDT DETACHED SLEEPING QUARTERS & CARPORT R1 - Switch swamp cooler with mini split unit R2 - ADD CARPOT W/ 1 HR RATED WALL AT PL | |
| T08PL00358 | Expired | 02/25/2008 | 08/23/2008 | PLUMB | REPLACE: WATER HEATER | |
| T18CM00627 | Final | 01/25/2018 | 09/04/2018 | COMBO | INSTALL ROOF TOP SOLAR PV SYSTEM |
Code Enforcement
Parcel Number - 138191880
Date - 08/18/2026 7:07 a.m.
Total Number Of Code Cases - 1
| Case Number | Case Status | Entered Date | Closed Date | Unit | Type | Description |
|---|---|---|---|---|---|---|
| T09DV05840 | Complian | 10/09/2009 | N/A | DNR_VIOL | Overgrown weeds and trash |