Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Parcel Search: 13819035J
Parcel Search
Parcel Attributes
| Parcel | 13819035J |
|---|---|
| Jurisdiction | Tucson, Pima County |
| City of Tucson Zoning | O-3, C-2 |
| Tucson Ward | Ward 1 |
| Tucson Registered Neighborhood | Barrio Nopal |
| Major Street & Route | Gateway Route |
| Pima County Data | Assessor, Recorder, Treasurer, ... |
| Parcel Map | Map |
| Address | |
| Parcel Attributes Issue? | |
Annexations & Original City Zoning (OCZ)
Date - 12/08/2025 2:10 a.m.
Total Number Of OZC Plans - (1)
Rezoning Cases
Date - 12/08/2025 2:10 a.m.
Total Number Of Rezone Cases - (4)
| Case No. | Description | New Zone | Status | Status Date | Address |
|---|---|---|---|---|---|
| C9-85-24 | Paul Ash Investment Co - Valencia Road | B-2A | Effectuated | 05/04/2010 | 351 W VALENCIA |
| C9-85-24 | Paul Ash Investment Co - Valencia Road | B-2A | Expired | 05/04/2010 | 351 W VALENCIA |
| C9-88-19 | Griesemer - Valencia Road | B-1 | Withdrawn | 11/09/2009 | 351 W VALENCIA |
| C9-89-47 | Griesemer - Valencia Road | B-2A | Effectuated | 04/01/2009 | 351 W VALENCIA |
Special Development Requests & Requirements
Date - 12/08/2025 2:10 a.m.
Total Number Of Special Development Permits - (1)
| Activity Number | Status | Apply Date | Expired Date | Type | Description |
|---|---|---|---|---|---|
| H000010005 | Closed | N/A |
Permits
Parcel Number - 13819035J
Date - 12/08/2025 2:10 a.m.
Total Number Of Permits - (50)
| Permit | Permit Status | Entered Date | Expired Date | Unit | Type | Description |
|---|---|---|---|---|---|---|
| TR-UTL-0224-00215 | Complete | 02/02/2024 | 05/08/2024 | Right-of-Way (ROW) - Utility | 351 W VALENCIA RD 15 13 13 NW - REPAIR A LEAKING SERVICE ON THE NORTH SIDE IN ASPHALT, 10LF - WORK ORDER 2723535 | |
| TS-PRM-0924-00426 | Issued | 09/26/2024 | 03/25/2025 | Sign - Permanent | Change of copy on existing pan channel raceway | |
| TR-ROW-1223-01487 | Void | 12/29/2023 | N/A | Right-of-Way (ROW) | KE&G will be preforming milling and paving operations in the Barrio Nopal and Elvira neighborhoods including concrete sidewalk and ADA ramps. | |
| TR-ROW-1223-01487 | Void | 12/29/2023 | N/A | BLDG 1 | Right-of-Way (ROW) | KE&G will be preforming milling and paving operations in the Barrio Nopal and Elvira neighborhoods including concrete sidewalk and ADA ramps. |
| TR-ROW-1223-01487 | Void | 12/29/2023 | N/A | BLDG 1 UNIT 1 | Right-of-Way (ROW) | KE&G will be preforming milling and paving operations in the Barrio Nopal and Elvira neighborhoods including concrete sidewalk and ADA ramps. |
| TR-ROW-1223-01487 | Void | 12/29/2023 | N/A | BLDG 1 UNIT 2 | Right-of-Way (ROW) | KE&G will be preforming milling and paving operations in the Barrio Nopal and Elvira neighborhoods including concrete sidewalk and ADA ramps. |
| TR-ROW-1223-01487 | Void | 12/29/2023 | N/A | BLDG 2 | Right-of-Way (ROW) | KE&G will be preforming milling and paving operations in the Barrio Nopal and Elvira neighborhoods including concrete sidewalk and ADA ramps. |
| TR-ROW-1223-01487 | Void | 12/29/2023 | N/A | BLDG 2 UNIT 1 | Right-of-Way (ROW) | KE&G will be preforming milling and paving operations in the Barrio Nopal and Elvira neighborhoods including concrete sidewalk and ADA ramps. |
| TR-ROW-1223-01487 | Void | 12/29/2023 | N/A | BLDG 2 UNIT 2 | Right-of-Way (ROW) | KE&G will be preforming milling and paving operations in the Barrio Nopal and Elvira neighborhoods including concrete sidewalk and ADA ramps. |
| TR-ROW-1223-01487 | Void | 12/29/2023 | N/A | BLDG 3 | Right-of-Way (ROW) | KE&G will be preforming milling and paving operations in the Barrio Nopal and Elvira neighborhoods including concrete sidewalk and ADA ramps. |
| TR-ROW-1223-01487 | Void | 12/29/2023 | N/A | BLDG 3 UNIT 1 | Right-of-Way (ROW) | KE&G will be preforming milling and paving operations in the Barrio Nopal and Elvira neighborhoods including concrete sidewalk and ADA ramps. |
| TR-ROW-1223-01487 | Void | 12/29/2023 | N/A | BLDG 3 UNIT 2 | Right-of-Way (ROW) | KE&G will be preforming milling and paving operations in the Barrio Nopal and Elvira neighborhoods including concrete sidewalk and ADA ramps. |
| TR-ROW-1223-01487 | Void | 12/29/2023 | N/A | BLDG 4 | Right-of-Way (ROW) | KE&G will be preforming milling and paving operations in the Barrio Nopal and Elvira neighborhoods including concrete sidewalk and ADA ramps. |
| TR-ROW-1223-01487 | Void | 12/29/2023 | N/A | BLDG 4 UNIT 1 | Right-of-Way (ROW) | KE&G will be preforming milling and paving operations in the Barrio Nopal and Elvira neighborhoods including concrete sidewalk and ADA ramps. |
| TR-ROW-1223-01487 | Void | 12/29/2023 | N/A | BLDG 4 UNIT 2 | Right-of-Way (ROW) | KE&G will be preforming milling and paving operations in the Barrio Nopal and Elvira neighborhoods including concrete sidewalk and ADA ramps. |
| TR-ROW-1223-01487 | Void | 12/29/2023 | N/A | BLDG 5 | Right-of-Way (ROW) | KE&G will be preforming milling and paving operations in the Barrio Nopal and Elvira neighborhoods including concrete sidewalk and ADA ramps. |
| TR-ROW-1223-01487 | Void | 12/29/2023 | N/A | BLDG 6 | Right-of-Way (ROW) | KE&G will be preforming milling and paving operations in the Barrio Nopal and Elvira neighborhoods including concrete sidewalk and ADA ramps. |
| TR-ROW-1223-01487 | Void | 12/29/2023 | N/A | BLDG 7 | Right-of-Way (ROW) | KE&G will be preforming milling and paving operations in the Barrio Nopal and Elvira neighborhoods including concrete sidewalk and ADA ramps. |
| TR-ROW-1223-01487 | Void | 12/29/2023 | N/A | UNIT 1 | Right-of-Way (ROW) | KE&G will be preforming milling and paving operations in the Barrio Nopal and Elvira neighborhoods including concrete sidewalk and ADA ramps. |
| TR-ROW-1223-01487 | Void | 12/29/2023 | N/A | UNIT 10 | Right-of-Way (ROW) | KE&G will be preforming milling and paving operations in the Barrio Nopal and Elvira neighborhoods including concrete sidewalk and ADA ramps. |
| TR-ROW-1223-01487 | Void | 12/29/2023 | N/A | UNIT 11 | Right-of-Way (ROW) | KE&G will be preforming milling and paving operations in the Barrio Nopal and Elvira neighborhoods including concrete sidewalk and ADA ramps. |
| TR-ROW-1223-01487 | Void | 12/29/2023 | N/A | UNIT 12 | Right-of-Way (ROW) | KE&G will be preforming milling and paving operations in the Barrio Nopal and Elvira neighborhoods including concrete sidewalk and ADA ramps. |
| TR-ROW-1223-01487 | Void | 12/29/2023 | N/A | UNIT 13 | Right-of-Way (ROW) | KE&G will be preforming milling and paving operations in the Barrio Nopal and Elvira neighborhoods including concrete sidewalk and ADA ramps. |
| TR-ROW-1223-01487 | Void | 12/29/2023 | N/A | UNIT 14 | Right-of-Way (ROW) | KE&G will be preforming milling and paving operations in the Barrio Nopal and Elvira neighborhoods including concrete sidewalk and ADA ramps. |
| TR-ROW-1223-01487 | Void | 12/29/2023 | N/A | UNIT 15 | Right-of-Way (ROW) | KE&G will be preforming milling and paving operations in the Barrio Nopal and Elvira neighborhoods including concrete sidewalk and ADA ramps. |
| TR-ROW-1223-01487 | Void | 12/29/2023 | N/A | UNIT 16 | Right-of-Way (ROW) | KE&G will be preforming milling and paving operations in the Barrio Nopal and Elvira neighborhoods including concrete sidewalk and ADA ramps. |
| TR-ROW-1223-01487 | Void | 12/29/2023 | N/A | UNIT 17 | Right-of-Way (ROW) | KE&G will be preforming milling and paving operations in the Barrio Nopal and Elvira neighborhoods including concrete sidewalk and ADA ramps. |
| TR-ROW-1223-01487 | Void | 12/29/2023 | N/A | UNIT 18 | Right-of-Way (ROW) | KE&G will be preforming milling and paving operations in the Barrio Nopal and Elvira neighborhoods including concrete sidewalk and ADA ramps. |
| TR-ROW-1223-01487 | Void | 12/29/2023 | N/A | UNIT 19 | Right-of-Way (ROW) | KE&G will be preforming milling and paving operations in the Barrio Nopal and Elvira neighborhoods including concrete sidewalk and ADA ramps. |
| TR-ROW-1223-01487 | Void | 12/29/2023 | N/A | UNIT 19A | Right-of-Way (ROW) | KE&G will be preforming milling and paving operations in the Barrio Nopal and Elvira neighborhoods including concrete sidewalk and ADA ramps. |
| TR-ROW-1223-01487 | Void | 12/29/2023 | N/A | UNIT 19B | Right-of-Way (ROW) | KE&G will be preforming milling and paving operations in the Barrio Nopal and Elvira neighborhoods including concrete sidewalk and ADA ramps. |
| TR-ROW-1223-01487 | Void | 12/29/2023 | N/A | UNIT 19C | Right-of-Way (ROW) | KE&G will be preforming milling and paving operations in the Barrio Nopal and Elvira neighborhoods including concrete sidewalk and ADA ramps. |
| TR-ROW-1223-01487 | Void | 12/29/2023 | N/A | UNIT 2 | Right-of-Way (ROW) | KE&G will be preforming milling and paving operations in the Barrio Nopal and Elvira neighborhoods including concrete sidewalk and ADA ramps. |
| TR-ROW-1223-01487 | Void | 12/29/2023 | N/A | UNIT 2101 | Right-of-Way (ROW) | KE&G will be preforming milling and paving operations in the Barrio Nopal and Elvira neighborhoods including concrete sidewalk and ADA ramps. |
| TR-ROW-1223-01487 | Void | 12/29/2023 | N/A | UNIT 2104 | Right-of-Way (ROW) | KE&G will be preforming milling and paving operations in the Barrio Nopal and Elvira neighborhoods including concrete sidewalk and ADA ramps. |
| TR-ROW-1223-01487 | Void | 12/29/2023 | N/A | UNIT 3 | Right-of-Way (ROW) | KE&G will be preforming milling and paving operations in the Barrio Nopal and Elvira neighborhoods including concrete sidewalk and ADA ramps. |
| TR-ROW-1223-01487 | Void | 12/29/2023 | N/A | UNIT 3101 | Right-of-Way (ROW) | KE&G will be preforming milling and paving operations in the Barrio Nopal and Elvira neighborhoods including concrete sidewalk and ADA ramps. |
| TR-ROW-1223-01487 | Void | 12/29/2023 | N/A | UNIT 3102 | Right-of-Way (ROW) | KE&G will be preforming milling and paving operations in the Barrio Nopal and Elvira neighborhoods including concrete sidewalk and ADA ramps. |
| TR-ROW-1223-01487 | Void | 12/29/2023 | N/A | UNIT 4 | Right-of-Way (ROW) | KE&G will be preforming milling and paving operations in the Barrio Nopal and Elvira neighborhoods including concrete sidewalk and ADA ramps. |
| TR-ROW-1223-01487 | Void | 12/29/2023 | N/A | UNIT 5 | Right-of-Way (ROW) | KE&G will be preforming milling and paving operations in the Barrio Nopal and Elvira neighborhoods including concrete sidewalk and ADA ramps. |
| TR-ROW-1223-01487 | Void | 12/29/2023 | N/A | UNIT 6 | Right-of-Way (ROW) | KE&G will be preforming milling and paving operations in the Barrio Nopal and Elvira neighborhoods including concrete sidewalk and ADA ramps. |
| TR-ROW-1223-01487 | Void | 12/29/2023 | N/A | UNIT 7 | Right-of-Way (ROW) | KE&G will be preforming milling and paving operations in the Barrio Nopal and Elvira neighborhoods including concrete sidewalk and ADA ramps. |
| TR-ROW-1223-01487 | Void | 12/29/2023 | N/A | UNIT 8 | Right-of-Way (ROW) | KE&G will be preforming milling and paving operations in the Barrio Nopal and Elvira neighborhoods including concrete sidewalk and ADA ramps. |
| TR-ROW-1223-01487 | Void | 12/29/2023 | N/A | UNIT 9 | Right-of-Way (ROW) | KE&G will be preforming milling and paving operations in the Barrio Nopal and Elvira neighborhoods including concrete sidewalk and ADA ramps. |
| TR-ROW-1223-01487 | Void | 12/29/2023 | N/A | UNIT M1 | Right-of-Way (ROW) | KE&G will be preforming milling and paving operations in the Barrio Nopal and Elvira neighborhoods including concrete sidewalk and ADA ramps. |
| TR-ROW-1223-01487 | Void | 12/29/2023 | N/A | UNIT M2 | Right-of-Way (ROW) | KE&G will be preforming milling and paving operations in the Barrio Nopal and Elvira neighborhoods including concrete sidewalk and ADA ramps. |
| T00EL01451 | Expired | 06/09/2000 | 12/20/2000 | ELECT | SIGN:CIRCUIT:794 | |
| T02BU02670 | Withdrwn | 10/15/2002 | N/A | TANKS | TANK:1200 GALLON | |
| T02OT00106 | Final | 01/18/2002 | 09/26/2004 | SIGN | SIGN:3562 | |
| T15OT01025 | Expired | 08/05/2015 | 02/01/2016 | SIGN | A-FRAME SIGN ON SITE 35' SETBACK |
Code Enforcement
Parcel Number - 13819035J
Date - 12/08/2025 2:10 a.m.
Total Number Of Code Cases - 10
| Case Number | Case Status | Entered Date | Closed Date | Unit | Type | Description |
|---|---|---|---|---|---|---|
| CE-VIO1224-04864 | Active | 12/05/2024 | N/A | Code Enforcement Case | HCAMP / Vacant desert lot westside of property homeless camps along wall, using wall trash tarps and mattresses | |
| T21DV05955 | Closed - resolved | 08/30/2021 | 01/26/2023 | Code Enforcement Case | Large amount of refuse left by homeless camp on two vacant parcels (TPDHOT) | |
| CE-VIO0523-03490 | Closed - resolved | 05/12/2023 | 08/04/2023 | Code Enforcement Case | PMMULT- Trash and weeds on property | |
| T07FR00477 | Field | 03/13/2007 | N/A | FIREINSP | full inspection | |
| T08DV03201 | Complian | 04/18/2008 | N/A | DNR_VIOL | POSS SIGN VIOLATION | |
| T08FR04067 | Complete | 10/30/2008 | N/A | FIREINSP | BRAKE MASTERS FIRE INSPECTON | |
| T10FR00790 | Complete | 04/22/2010 | N/A | FIREINSP | Valencia Brake masters fire inspection. | |
| T11DV02533 | Noverify | 04/13/2011 | N/A | DNR_VIOL | Sign violation. | |
| T15DV00869 | Complian | 02/11/2015 | N/A | DNR_VIOL | FLAPPING SIGN - BRAKEMASTERS | |
| T19DV05763 | Complian | 07/18/2019 | N/A | DNR_VIOL | HOMELESS CAMPS ON A VACANT LOT |