Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Parcel Search
 
Parcel Attributes
Parcel138182100
JurisdictionTucson, Pima County
City of Tucson ZoningR-2
Tucson WardWard 1
Tucson Registered NeighborhoodBarrio Nopal
Major Street & Route

Arterial or Collector

Pima County Data Assessor, Recorder, Treasurer, ...
Parcel Map Map
Address
Parcel Attributes Issue?

Annexations & Original City Zoning (OCZ)

Date - 11/19/2026 2:19 p.m.
Total Number Of OZC Plans - (1)
Plan Description Annexation Ordinance Effective Date OCZ Ordinance
C9-60-39 West To Silverbell Road And South To San Xavier Indian Reservation 2014 03/18/1960 2045

Permits

Parcel Number - 138182100
Date - 11/19/2026 2:19 p.m.
Total Number Of Permits - (47)
Permit Permit Status Entered Date Expired Date Unit Type Description
TR-UTL-0725-01167 Complete 07/20/2025 08/14/2025 Right-of-Way (ROW) - Utility Emergency - 233 e los reales rd 15-13-13 se, repair leaking valve, work order 3081746, east side of lot in dirt, 6lf.ca
TR-ROW-1223-01487 Void 12/29/2023 N/A Right-of-Way (ROW) KE&G will be preforming milling and paving operations in the Barrio Nopal and Elvira neighborhoods including concrete sidewalk and ADA ramps.
TR-ROW-1223-01487 Void 12/29/2023 N/A BLDG 1 Right-of-Way (ROW) KE&G will be preforming milling and paving operations in the Barrio Nopal and Elvira neighborhoods including concrete sidewalk and ADA ramps.
TR-ROW-1223-01487 Void 12/29/2023 N/A BLDG 1 UNIT 1 Right-of-Way (ROW) KE&G will be preforming milling and paving operations in the Barrio Nopal and Elvira neighborhoods including concrete sidewalk and ADA ramps.
TR-ROW-1223-01487 Void 12/29/2023 N/A BLDG 1 UNIT 2 Right-of-Way (ROW) KE&G will be preforming milling and paving operations in the Barrio Nopal and Elvira neighborhoods including concrete sidewalk and ADA ramps.
TR-ROW-1223-01487 Void 12/29/2023 N/A BLDG 2 Right-of-Way (ROW) KE&G will be preforming milling and paving operations in the Barrio Nopal and Elvira neighborhoods including concrete sidewalk and ADA ramps.
TR-ROW-1223-01487 Void 12/29/2023 N/A BLDG 2 UNIT 1 Right-of-Way (ROW) KE&G will be preforming milling and paving operations in the Barrio Nopal and Elvira neighborhoods including concrete sidewalk and ADA ramps.
TR-ROW-1223-01487 Void 12/29/2023 N/A BLDG 2 UNIT 2 Right-of-Way (ROW) KE&G will be preforming milling and paving operations in the Barrio Nopal and Elvira neighborhoods including concrete sidewalk and ADA ramps.
TR-ROW-1223-01487 Void 12/29/2023 N/A BLDG 3 Right-of-Way (ROW) KE&G will be preforming milling and paving operations in the Barrio Nopal and Elvira neighborhoods including concrete sidewalk and ADA ramps.
TR-ROW-1223-01487 Void 12/29/2023 N/A BLDG 3 UNIT 1 Right-of-Way (ROW) KE&G will be preforming milling and paving operations in the Barrio Nopal and Elvira neighborhoods including concrete sidewalk and ADA ramps.
TR-ROW-1223-01487 Void 12/29/2023 N/A BLDG 3 UNIT 2 Right-of-Way (ROW) KE&G will be preforming milling and paving operations in the Barrio Nopal and Elvira neighborhoods including concrete sidewalk and ADA ramps.
TR-ROW-1223-01487 Void 12/29/2023 N/A BLDG 4 Right-of-Way (ROW) KE&G will be preforming milling and paving operations in the Barrio Nopal and Elvira neighborhoods including concrete sidewalk and ADA ramps.
TR-ROW-1223-01487 Void 12/29/2023 N/A BLDG 4 UNIT 1 Right-of-Way (ROW) KE&G will be preforming milling and paving operations in the Barrio Nopal and Elvira neighborhoods including concrete sidewalk and ADA ramps.
TR-ROW-1223-01487 Void 12/29/2023 N/A BLDG 4 UNIT 2 Right-of-Way (ROW) KE&G will be preforming milling and paving operations in the Barrio Nopal and Elvira neighborhoods including concrete sidewalk and ADA ramps.
TR-ROW-1223-01487 Void 12/29/2023 N/A BLDG 5 Right-of-Way (ROW) KE&G will be preforming milling and paving operations in the Barrio Nopal and Elvira neighborhoods including concrete sidewalk and ADA ramps.
TR-ROW-1223-01487 Void 12/29/2023 N/A BLDG 6 Right-of-Way (ROW) KE&G will be preforming milling and paving operations in the Barrio Nopal and Elvira neighborhoods including concrete sidewalk and ADA ramps.
TR-ROW-1223-01487 Void 12/29/2023 N/A BLDG 7 Right-of-Way (ROW) KE&G will be preforming milling and paving operations in the Barrio Nopal and Elvira neighborhoods including concrete sidewalk and ADA ramps.
TR-ROW-1223-01487 Void 12/29/2023 N/A UNIT 1 Right-of-Way (ROW) KE&G will be preforming milling and paving operations in the Barrio Nopal and Elvira neighborhoods including concrete sidewalk and ADA ramps.
TR-ROW-1223-01487 Void 12/29/2023 N/A UNIT 10 Right-of-Way (ROW) KE&G will be preforming milling and paving operations in the Barrio Nopal and Elvira neighborhoods including concrete sidewalk and ADA ramps.
TR-ROW-1223-01487 Void 12/29/2023 N/A UNIT 11 Right-of-Way (ROW) KE&G will be preforming milling and paving operations in the Barrio Nopal and Elvira neighborhoods including concrete sidewalk and ADA ramps.
TR-ROW-1223-01487 Void 12/29/2023 N/A UNIT 12 Right-of-Way (ROW) KE&G will be preforming milling and paving operations in the Barrio Nopal and Elvira neighborhoods including concrete sidewalk and ADA ramps.
TR-ROW-1223-01487 Void 12/29/2023 N/A UNIT 13 Right-of-Way (ROW) KE&G will be preforming milling and paving operations in the Barrio Nopal and Elvira neighborhoods including concrete sidewalk and ADA ramps.
TR-ROW-1223-01487 Void 12/29/2023 N/A UNIT 14 Right-of-Way (ROW) KE&G will be preforming milling and paving operations in the Barrio Nopal and Elvira neighborhoods including concrete sidewalk and ADA ramps.
TR-ROW-1223-01487 Void 12/29/2023 N/A UNIT 15 Right-of-Way (ROW) KE&G will be preforming milling and paving operations in the Barrio Nopal and Elvira neighborhoods including concrete sidewalk and ADA ramps.
TR-ROW-1223-01487 Void 12/29/2023 N/A UNIT 16 Right-of-Way (ROW) KE&G will be preforming milling and paving operations in the Barrio Nopal and Elvira neighborhoods including concrete sidewalk and ADA ramps.
TR-ROW-1223-01487 Void 12/29/2023 N/A UNIT 17 Right-of-Way (ROW) KE&G will be preforming milling and paving operations in the Barrio Nopal and Elvira neighborhoods including concrete sidewalk and ADA ramps.
TR-ROW-1223-01487 Void 12/29/2023 N/A UNIT 18 Right-of-Way (ROW) KE&G will be preforming milling and paving operations in the Barrio Nopal and Elvira neighborhoods including concrete sidewalk and ADA ramps.
TR-ROW-1223-01487 Void 12/29/2023 N/A UNIT 19 Right-of-Way (ROW) KE&G will be preforming milling and paving operations in the Barrio Nopal and Elvira neighborhoods including concrete sidewalk and ADA ramps.
TR-ROW-1223-01487 Void 12/29/2023 N/A UNIT 19A Right-of-Way (ROW) KE&G will be preforming milling and paving operations in the Barrio Nopal and Elvira neighborhoods including concrete sidewalk and ADA ramps.
TR-ROW-1223-01487 Void 12/29/2023 N/A UNIT 19B Right-of-Way (ROW) KE&G will be preforming milling and paving operations in the Barrio Nopal and Elvira neighborhoods including concrete sidewalk and ADA ramps.
TR-ROW-1223-01487 Void 12/29/2023 N/A UNIT 19C Right-of-Way (ROW) KE&G will be preforming milling and paving operations in the Barrio Nopal and Elvira neighborhoods including concrete sidewalk and ADA ramps.
TR-ROW-1223-01487 Void 12/29/2023 N/A UNIT 2 Right-of-Way (ROW) KE&G will be preforming milling and paving operations in the Barrio Nopal and Elvira neighborhoods including concrete sidewalk and ADA ramps.
TR-ROW-1223-01487 Void 12/29/2023 N/A UNIT 2101 Right-of-Way (ROW) KE&G will be preforming milling and paving operations in the Barrio Nopal and Elvira neighborhoods including concrete sidewalk and ADA ramps.
TR-ROW-1223-01487 Void 12/29/2023 N/A UNIT 2104 Right-of-Way (ROW) KE&G will be preforming milling and paving operations in the Barrio Nopal and Elvira neighborhoods including concrete sidewalk and ADA ramps.
TR-ROW-1223-01487 Void 12/29/2023 N/A UNIT 3 Right-of-Way (ROW) KE&G will be preforming milling and paving operations in the Barrio Nopal and Elvira neighborhoods including concrete sidewalk and ADA ramps.
TR-ROW-1223-01487 Void 12/29/2023 N/A UNIT 3101 Right-of-Way (ROW) KE&G will be preforming milling and paving operations in the Barrio Nopal and Elvira neighborhoods including concrete sidewalk and ADA ramps.
TR-ROW-1223-01487 Void 12/29/2023 N/A UNIT 3102 Right-of-Way (ROW) KE&G will be preforming milling and paving operations in the Barrio Nopal and Elvira neighborhoods including concrete sidewalk and ADA ramps.
TR-ROW-1223-01487 Void 12/29/2023 N/A UNIT 4 Right-of-Way (ROW) KE&G will be preforming milling and paving operations in the Barrio Nopal and Elvira neighborhoods including concrete sidewalk and ADA ramps.
TR-ROW-1223-01487 Void 12/29/2023 N/A UNIT 5 Right-of-Way (ROW) KE&G will be preforming milling and paving operations in the Barrio Nopal and Elvira neighborhoods including concrete sidewalk and ADA ramps.
TR-ROW-1223-01487 Void 12/29/2023 N/A UNIT 6 Right-of-Way (ROW) KE&G will be preforming milling and paving operations in the Barrio Nopal and Elvira neighborhoods including concrete sidewalk and ADA ramps.
TR-ROW-1223-01487 Void 12/29/2023 N/A UNIT 7 Right-of-Way (ROW) KE&G will be preforming milling and paving operations in the Barrio Nopal and Elvira neighborhoods including concrete sidewalk and ADA ramps.
TR-ROW-1223-01487 Void 12/29/2023 N/A UNIT 8 Right-of-Way (ROW) KE&G will be preforming milling and paving operations in the Barrio Nopal and Elvira neighborhoods including concrete sidewalk and ADA ramps.
TR-ROW-1223-01487 Void 12/29/2023 N/A UNIT 9 Right-of-Way (ROW) KE&G will be preforming milling and paving operations in the Barrio Nopal and Elvira neighborhoods including concrete sidewalk and ADA ramps.
TR-ROW-1223-01487 Void 12/29/2023 N/A UNIT M1 Right-of-Way (ROW) KE&G will be preforming milling and paving operations in the Barrio Nopal and Elvira neighborhoods including concrete sidewalk and ADA ramps.
TR-ROW-1223-01487 Void 12/29/2023 N/A UNIT M2 Right-of-Way (ROW) KE&G will be preforming milling and paving operations in the Barrio Nopal and Elvira neighborhoods including concrete sidewalk and ADA ramps.
T07EL01846 Final 10/15/2007 04/23/2008 ELECT ELEC RECONNECT
T21RW00682 Final 02/10/2021 04/27/2021 ROW Starting on the the N/W corner of S. Nogales HWY and E. LOS REALES Rd at TEP pole, remove and replace existing coax and strand with the same (1) 1/4" strand and (1) .875 coax going West for 210' continuing oat TEP pole in front of 329 E. Los Reales Rd, removing abandoned cable going West for 528' then South 48'

Code Enforcement

Parcel Number - 138182100
Date - 11/19/2026 2:19 p.m.
Total Number Of Code Cases - 1
Case Number Case Status Entered Date Closed Date Unit Type Description
T07DV00224 Complian 01/09/2007 N/A DNR_VIOL WEEDS/TRASH/DEBRIS 3G-GTI-01/09/07