Parcel Search: 138181380
Parcel Search
Parcel Attributes
| Parcel | 138181380 |
|---|---|
| Jurisdiction | Tucson, Pima County |
| City of Tucson Zoning | R-2 |
| Tucson Ward | Ward 1 |
| Tucson Registered Neighborhood | Barrio Nopal |
| Pima County Data | Assessor, Recorder, Treasurer, ... |
| Parcel Map | Map |
| Addresses | |
| Parcel Attributes Issue? | |
Annexations & Original City Zoning (OCZ)
Date - 08/21/2026 9:46 p.m.
Total Number Of OZC Plans - (1)
Permits
Parcel Number - 138181380
Date - 08/21/2026 9:46 p.m.
Total Number Of Permits - (46)
| Permit | Permit Status | Entered Date | Expired Date | Unit | Type | Description |
|---|---|---|---|---|---|---|
| TC-RES-1122-00892 | Issued | 11/18/2022 | 06/11/2023 | Residential Building - One or Two Family | EMERGANCY GAS PRESSURE TEST | |
| TC-RES-1222-01378 | Void | 12/08/2022 | N/A | Residential Building - One or Two Family | VOIDED DUPLICATE OF PERMIT TC-RES-1122-00892 EMERGANCY HOME OWNER HAS NO GAS !!!!!!!!!!! GAS LINE REPACLE | |
| TR-ROW-1223-01487 | Void | 12/29/2023 | N/A | Right-of-Way (ROW) | KE&G will be preforming milling and paving operations in the Barrio Nopal and Elvira neighborhoods including concrete sidewalk and ADA ramps. | |
| TR-ROW-1223-01487 | Void | 12/29/2023 | N/A | BLDG 1 | Right-of-Way (ROW) | KE&G will be preforming milling and paving operations in the Barrio Nopal and Elvira neighborhoods including concrete sidewalk and ADA ramps. |
| TR-ROW-1223-01487 | Void | 12/29/2023 | N/A | BLDG 1 UNIT 1 | Right-of-Way (ROW) | KE&G will be preforming milling and paving operations in the Barrio Nopal and Elvira neighborhoods including concrete sidewalk and ADA ramps. |
| TR-ROW-1223-01487 | Void | 12/29/2023 | N/A | BLDG 1 UNIT 2 | Right-of-Way (ROW) | KE&G will be preforming milling and paving operations in the Barrio Nopal and Elvira neighborhoods including concrete sidewalk and ADA ramps. |
| TR-ROW-1223-01487 | Void | 12/29/2023 | N/A | BLDG 2 | Right-of-Way (ROW) | KE&G will be preforming milling and paving operations in the Barrio Nopal and Elvira neighborhoods including concrete sidewalk and ADA ramps. |
| TR-ROW-1223-01487 | Void | 12/29/2023 | N/A | BLDG 2 UNIT 1 | Right-of-Way (ROW) | KE&G will be preforming milling and paving operations in the Barrio Nopal and Elvira neighborhoods including concrete sidewalk and ADA ramps. |
| TR-ROW-1223-01487 | Void | 12/29/2023 | N/A | BLDG 2 UNIT 2 | Right-of-Way (ROW) | KE&G will be preforming milling and paving operations in the Barrio Nopal and Elvira neighborhoods including concrete sidewalk and ADA ramps. |
| TR-ROW-1223-01487 | Void | 12/29/2023 | N/A | BLDG 3 | Right-of-Way (ROW) | KE&G will be preforming milling and paving operations in the Barrio Nopal and Elvira neighborhoods including concrete sidewalk and ADA ramps. |
| TR-ROW-1223-01487 | Void | 12/29/2023 | N/A | BLDG 3 UNIT 1 | Right-of-Way (ROW) | KE&G will be preforming milling and paving operations in the Barrio Nopal and Elvira neighborhoods including concrete sidewalk and ADA ramps. |
| TR-ROW-1223-01487 | Void | 12/29/2023 | N/A | BLDG 3 UNIT 2 | Right-of-Way (ROW) | KE&G will be preforming milling and paving operations in the Barrio Nopal and Elvira neighborhoods including concrete sidewalk and ADA ramps. |
| TR-ROW-1223-01487 | Void | 12/29/2023 | N/A | BLDG 4 | Right-of-Way (ROW) | KE&G will be preforming milling and paving operations in the Barrio Nopal and Elvira neighborhoods including concrete sidewalk and ADA ramps. |
| TR-ROW-1223-01487 | Void | 12/29/2023 | N/A | BLDG 4 UNIT 1 | Right-of-Way (ROW) | KE&G will be preforming milling and paving operations in the Barrio Nopal and Elvira neighborhoods including concrete sidewalk and ADA ramps. |
| TR-ROW-1223-01487 | Void | 12/29/2023 | N/A | BLDG 4 UNIT 2 | Right-of-Way (ROW) | KE&G will be preforming milling and paving operations in the Barrio Nopal and Elvira neighborhoods including concrete sidewalk and ADA ramps. |
| TR-ROW-1223-01487 | Void | 12/29/2023 | N/A | BLDG 5 | Right-of-Way (ROW) | KE&G will be preforming milling and paving operations in the Barrio Nopal and Elvira neighborhoods including concrete sidewalk and ADA ramps. |
| TR-ROW-1223-01487 | Void | 12/29/2023 | N/A | BLDG 6 | Right-of-Way (ROW) | KE&G will be preforming milling and paving operations in the Barrio Nopal and Elvira neighborhoods including concrete sidewalk and ADA ramps. |
| TR-ROW-1223-01487 | Void | 12/29/2023 | N/A | BLDG 7 | Right-of-Way (ROW) | KE&G will be preforming milling and paving operations in the Barrio Nopal and Elvira neighborhoods including concrete sidewalk and ADA ramps. |
| TR-ROW-1223-01487 | Void | 12/29/2023 | N/A | UNIT 1 | Right-of-Way (ROW) | KE&G will be preforming milling and paving operations in the Barrio Nopal and Elvira neighborhoods including concrete sidewalk and ADA ramps. |
| TR-ROW-1223-01487 | Void | 12/29/2023 | N/A | UNIT 10 | Right-of-Way (ROW) | KE&G will be preforming milling and paving operations in the Barrio Nopal and Elvira neighborhoods including concrete sidewalk and ADA ramps. |
| TR-ROW-1223-01487 | Void | 12/29/2023 | N/A | UNIT 11 | Right-of-Way (ROW) | KE&G will be preforming milling and paving operations in the Barrio Nopal and Elvira neighborhoods including concrete sidewalk and ADA ramps. |
| TR-ROW-1223-01487 | Void | 12/29/2023 | N/A | UNIT 12 | Right-of-Way (ROW) | KE&G will be preforming milling and paving operations in the Barrio Nopal and Elvira neighborhoods including concrete sidewalk and ADA ramps. |
| TR-ROW-1223-01487 | Void | 12/29/2023 | N/A | UNIT 13 | Right-of-Way (ROW) | KE&G will be preforming milling and paving operations in the Barrio Nopal and Elvira neighborhoods including concrete sidewalk and ADA ramps. |
| TR-ROW-1223-01487 | Void | 12/29/2023 | N/A | UNIT 14 | Right-of-Way (ROW) | KE&G will be preforming milling and paving operations in the Barrio Nopal and Elvira neighborhoods including concrete sidewalk and ADA ramps. |
| TR-ROW-1223-01487 | Void | 12/29/2023 | N/A | UNIT 15 | Right-of-Way (ROW) | KE&G will be preforming milling and paving operations in the Barrio Nopal and Elvira neighborhoods including concrete sidewalk and ADA ramps. |
| TR-ROW-1223-01487 | Void | 12/29/2023 | N/A | UNIT 16 | Right-of-Way (ROW) | KE&G will be preforming milling and paving operations in the Barrio Nopal and Elvira neighborhoods including concrete sidewalk and ADA ramps. |
| TR-ROW-1223-01487 | Void | 12/29/2023 | N/A | UNIT 17 | Right-of-Way (ROW) | KE&G will be preforming milling and paving operations in the Barrio Nopal and Elvira neighborhoods including concrete sidewalk and ADA ramps. |
| TR-ROW-1223-01487 | Void | 12/29/2023 | N/A | UNIT 18 | Right-of-Way (ROW) | KE&G will be preforming milling and paving operations in the Barrio Nopal and Elvira neighborhoods including concrete sidewalk and ADA ramps. |
| TR-ROW-1223-01487 | Void | 12/29/2023 | N/A | UNIT 19 | Right-of-Way (ROW) | KE&G will be preforming milling and paving operations in the Barrio Nopal and Elvira neighborhoods including concrete sidewalk and ADA ramps. |
| TR-ROW-1223-01487 | Void | 12/29/2023 | N/A | UNIT 19A | Right-of-Way (ROW) | KE&G will be preforming milling and paving operations in the Barrio Nopal and Elvira neighborhoods including concrete sidewalk and ADA ramps. |
| TR-ROW-1223-01487 | Void | 12/29/2023 | N/A | UNIT 19B | Right-of-Way (ROW) | KE&G will be preforming milling and paving operations in the Barrio Nopal and Elvira neighborhoods including concrete sidewalk and ADA ramps. |
| TR-ROW-1223-01487 | Void | 12/29/2023 | N/A | UNIT 19C | Right-of-Way (ROW) | KE&G will be preforming milling and paving operations in the Barrio Nopal and Elvira neighborhoods including concrete sidewalk and ADA ramps. |
| TR-ROW-1223-01487 | Void | 12/29/2023 | N/A | UNIT 2 | Right-of-Way (ROW) | KE&G will be preforming milling and paving operations in the Barrio Nopal and Elvira neighborhoods including concrete sidewalk and ADA ramps. |
| TR-ROW-1223-01487 | Void | 12/29/2023 | N/A | UNIT 2101 | Right-of-Way (ROW) | KE&G will be preforming milling and paving operations in the Barrio Nopal and Elvira neighborhoods including concrete sidewalk and ADA ramps. |
| TR-ROW-1223-01487 | Void | 12/29/2023 | N/A | UNIT 2104 | Right-of-Way (ROW) | KE&G will be preforming milling and paving operations in the Barrio Nopal and Elvira neighborhoods including concrete sidewalk and ADA ramps. |
| TR-ROW-1223-01487 | Void | 12/29/2023 | N/A | UNIT 3 | Right-of-Way (ROW) | KE&G will be preforming milling and paving operations in the Barrio Nopal and Elvira neighborhoods including concrete sidewalk and ADA ramps. |
| TR-ROW-1223-01487 | Void | 12/29/2023 | N/A | UNIT 3101 | Right-of-Way (ROW) | KE&G will be preforming milling and paving operations in the Barrio Nopal and Elvira neighborhoods including concrete sidewalk and ADA ramps. |
| TR-ROW-1223-01487 | Void | 12/29/2023 | N/A | UNIT 3102 | Right-of-Way (ROW) | KE&G will be preforming milling and paving operations in the Barrio Nopal and Elvira neighborhoods including concrete sidewalk and ADA ramps. |
| TR-ROW-1223-01487 | Void | 12/29/2023 | N/A | UNIT 4 | Right-of-Way (ROW) | KE&G will be preforming milling and paving operations in the Barrio Nopal and Elvira neighborhoods including concrete sidewalk and ADA ramps. |
| TR-ROW-1223-01487 | Void | 12/29/2023 | N/A | UNIT 5 | Right-of-Way (ROW) | KE&G will be preforming milling and paving operations in the Barrio Nopal and Elvira neighborhoods including concrete sidewalk and ADA ramps. |
| TR-ROW-1223-01487 | Void | 12/29/2023 | N/A | UNIT 6 | Right-of-Way (ROW) | KE&G will be preforming milling and paving operations in the Barrio Nopal and Elvira neighborhoods including concrete sidewalk and ADA ramps. |
| TR-ROW-1223-01487 | Void | 12/29/2023 | N/A | UNIT 7 | Right-of-Way (ROW) | KE&G will be preforming milling and paving operations in the Barrio Nopal and Elvira neighborhoods including concrete sidewalk and ADA ramps. |
| TR-ROW-1223-01487 | Void | 12/29/2023 | N/A | UNIT 8 | Right-of-Way (ROW) | KE&G will be preforming milling and paving operations in the Barrio Nopal and Elvira neighborhoods including concrete sidewalk and ADA ramps. |
| TR-ROW-1223-01487 | Void | 12/29/2023 | N/A | UNIT 9 | Right-of-Way (ROW) | KE&G will be preforming milling and paving operations in the Barrio Nopal and Elvira neighborhoods including concrete sidewalk and ADA ramps. |
| TR-ROW-1223-01487 | Void | 12/29/2023 | N/A | UNIT M1 | Right-of-Way (ROW) | KE&G will be preforming milling and paving operations in the Barrio Nopal and Elvira neighborhoods including concrete sidewalk and ADA ramps. |
| TR-ROW-1223-01487 | Void | 12/29/2023 | N/A | UNIT M2 | Right-of-Way (ROW) | KE&G will be preforming milling and paving operations in the Barrio Nopal and Elvira neighborhoods including concrete sidewalk and ADA ramps. |
Code Enforcement
Parcel Number - 138181380
Date - 08/21/2026 9:46 p.m.
Total Number Of Code Cases - 2
| Case Number | Case Status | Entered Date | Closed Date | Unit | Type | Description |
|---|---|---|---|---|---|---|
| CE-VIO1122-00457 | Closed - unfounded | 11/15/2022 | 02/04/2023 | Code Enforcement Case | WEEDS / Referred from ES / Failure to respond to Weeds Protocol address still in violation/ Excessive Weeds | |
| T99VL02397 | Void | 09/13/1999 | N/A | CODEVIOL | COMPLAINT: ADDITIONS W/O PERMITS, FOR ADDN UNITS |