Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Parcel Search

 
Parcel Attributes
Parcel138170340
JurisdictionTucson
City of Tucson ZoningR-2
Water Course

Washes

Tucson WardWard 1
Tucson Registered NeighborhoodBarrio Nopal
Pima County Data Assessor, Recorder, Treasurer, ...
Parcel Map Map
Address

Annexations & Original City Zoning (OCZ)

Date - 04/17/2025 8:15 a.m.
Total Number Of OZC Plans - (1)
Plan Description Annexation Ordinance Effective Date OCZ Ordinance
C9-60-39 West To Silverbell Road And South To San Xavier Indian Reservation 2014 03/18/1960 2045

Permits

Parcel Number - 138170340
Date - 04/17/2025 8:15 a.m.
Total Number Of Permits - (83)
Permit Permit Status Entered Date Expired Date Unit Type Description
TR-UTL-0125-00007 Complete 01/02/2025 02/06/2025 Right-of-Way (ROW) - Utility EXCAVATING 4 - 55X5 TRENCHES TO LOWER GAS SERVICES IN ROW FOR FUTURE STORM DRAIN IN ASPHALT, CONCRETE AND DIRT.
TR-ROW-1223-01485 Void 12/29/2023 N/A Right-of-Way (ROW) KE&G will be preforming milling and paving operations in the Barrio Nopal & Elvira neighborhoods including concrete work consisting of sidewalk and ADA ramps.
TR-ROW-1223-01485 Void 12/29/2023 N/A BLDG 1 Right-of-Way (ROW) KE&G will be preforming milling and paving operations in the Barrio Nopal & Elvira neighborhoods including concrete work consisting of sidewalk and ADA ramps.
TR-ROW-1223-01485 Void 12/29/2023 N/A BLDG 1 UNIT 1 Right-of-Way (ROW) KE&G will be preforming milling and paving operations in the Barrio Nopal & Elvira neighborhoods including concrete work consisting of sidewalk and ADA ramps.
TR-ROW-1223-01485 Void 12/29/2023 N/A BLDG 1 UNIT 2 Right-of-Way (ROW) KE&G will be preforming milling and paving operations in the Barrio Nopal & Elvira neighborhoods including concrete work consisting of sidewalk and ADA ramps.
TR-ROW-1223-01485 Void 12/29/2023 N/A BLDG 2 Right-of-Way (ROW) KE&G will be preforming milling and paving operations in the Barrio Nopal & Elvira neighborhoods including concrete work consisting of sidewalk and ADA ramps.
TR-ROW-1223-01485 Void 12/29/2023 N/A BLDG 2 UNIT 1 Right-of-Way (ROW) KE&G will be preforming milling and paving operations in the Barrio Nopal & Elvira neighborhoods including concrete work consisting of sidewalk and ADA ramps.
TR-ROW-1223-01485 Void 12/29/2023 N/A BLDG 2 UNIT 2 Right-of-Way (ROW) KE&G will be preforming milling and paving operations in the Barrio Nopal & Elvira neighborhoods including concrete work consisting of sidewalk and ADA ramps.
TR-ROW-1223-01485 Void 12/29/2023 N/A BLDG 3 Right-of-Way (ROW) KE&G will be preforming milling and paving operations in the Barrio Nopal & Elvira neighborhoods including concrete work consisting of sidewalk and ADA ramps.
TR-ROW-1223-01485 Void 12/29/2023 N/A BLDG 3 UNIT 1 Right-of-Way (ROW) KE&G will be preforming milling and paving operations in the Barrio Nopal & Elvira neighborhoods including concrete work consisting of sidewalk and ADA ramps.
TR-ROW-1223-01485 Void 12/29/2023 N/A BLDG 3 UNIT 2 Right-of-Way (ROW) KE&G will be preforming milling and paving operations in the Barrio Nopal & Elvira neighborhoods including concrete work consisting of sidewalk and ADA ramps.
TR-ROW-1223-01485 Void 12/29/2023 N/A BLDG 4 Right-of-Way (ROW) KE&G will be preforming milling and paving operations in the Barrio Nopal & Elvira neighborhoods including concrete work consisting of sidewalk and ADA ramps.
TR-ROW-1223-01485 Void 12/29/2023 N/A BLDG 4 UNIT 1 Right-of-Way (ROW) KE&G will be preforming milling and paving operations in the Barrio Nopal & Elvira neighborhoods including concrete work consisting of sidewalk and ADA ramps.
TR-ROW-1223-01485 Void 12/29/2023 N/A BLDG 4 UNIT 2 Right-of-Way (ROW) KE&G will be preforming milling and paving operations in the Barrio Nopal & Elvira neighborhoods including concrete work consisting of sidewalk and ADA ramps.
TR-ROW-1223-01485 Void 12/29/2023 N/A UNIT 1 Right-of-Way (ROW) KE&G will be preforming milling and paving operations in the Barrio Nopal & Elvira neighborhoods including concrete work consisting of sidewalk and ADA ramps.
TR-ROW-1223-01485 Void 12/29/2023 N/A UNIT 101 Right-of-Way (ROW) KE&G will be preforming milling and paving operations in the Barrio Nopal & Elvira neighborhoods including concrete work consisting of sidewalk and ADA ramps.
TR-ROW-1223-01485 Void 12/29/2023 N/A UNIT 102 Right-of-Way (ROW) KE&G will be preforming milling and paving operations in the Barrio Nopal & Elvira neighborhoods including concrete work consisting of sidewalk and ADA ramps.
TR-ROW-1223-01485 Void 12/29/2023 N/A UNIT 103 Right-of-Way (ROW) KE&G will be preforming milling and paving operations in the Barrio Nopal & Elvira neighborhoods including concrete work consisting of sidewalk and ADA ramps.
TR-ROW-1223-01485 Void 12/29/2023 N/A UNIT 104 Right-of-Way (ROW) KE&G will be preforming milling and paving operations in the Barrio Nopal & Elvira neighborhoods including concrete work consisting of sidewalk and ADA ramps.
TR-ROW-1223-01485 Void 12/29/2023 N/A UNIT 1101 Right-of-Way (ROW) KE&G will be preforming milling and paving operations in the Barrio Nopal & Elvira neighborhoods including concrete work consisting of sidewalk and ADA ramps.
TR-ROW-1223-01485 Void 12/29/2023 N/A UNIT 1102 Right-of-Way (ROW) KE&G will be preforming milling and paving operations in the Barrio Nopal & Elvira neighborhoods including concrete work consisting of sidewalk and ADA ramps.
TR-ROW-1223-01485 Void 12/29/2023 N/A UNIT 1103 Right-of-Way (ROW) KE&G will be preforming milling and paving operations in the Barrio Nopal & Elvira neighborhoods including concrete work consisting of sidewalk and ADA ramps.
TR-ROW-1223-01485 Void 12/29/2023 N/A UNIT 1104 Right-of-Way (ROW) KE&G will be preforming milling and paving operations in the Barrio Nopal & Elvira neighborhoods including concrete work consisting of sidewalk and ADA ramps.
TR-ROW-1223-01485 Void 12/29/2023 N/A UNIT 1105 Right-of-Way (ROW) KE&G will be preforming milling and paving operations in the Barrio Nopal & Elvira neighborhoods including concrete work consisting of sidewalk and ADA ramps.
TR-ROW-1223-01485 Void 12/29/2023 N/A UNIT 2 Right-of-Way (ROW) KE&G will be preforming milling and paving operations in the Barrio Nopal & Elvira neighborhoods including concrete work consisting of sidewalk and ADA ramps.
TR-ROW-1223-01485 Void 12/29/2023 N/A UNIT 2102 Right-of-Way (ROW) KE&G will be preforming milling and paving operations in the Barrio Nopal & Elvira neighborhoods including concrete work consisting of sidewalk and ADA ramps.
TR-ROW-1223-01485 Void 12/29/2023 N/A UNIT 2103 Right-of-Way (ROW) KE&G will be preforming milling and paving operations in the Barrio Nopal & Elvira neighborhoods including concrete work consisting of sidewalk and ADA ramps.
TR-ROW-1223-01485 Void 12/29/2023 N/A UNIT 2105 Right-of-Way (ROW) KE&G will be preforming milling and paving operations in the Barrio Nopal & Elvira neighborhoods including concrete work consisting of sidewalk and ADA ramps.
TR-ROW-1223-01485 Void 12/29/2023 N/A UNIT 3 Right-of-Way (ROW) KE&G will be preforming milling and paving operations in the Barrio Nopal & Elvira neighborhoods including concrete work consisting of sidewalk and ADA ramps.
TR-ROW-1223-01485 Void 12/29/2023 N/A UNIT 3103 Right-of-Way (ROW) KE&G will be preforming milling and paving operations in the Barrio Nopal & Elvira neighborhoods including concrete work consisting of sidewalk and ADA ramps.
TR-ROW-1223-01485 Void 12/29/2023 N/A UNIT 3104 Right-of-Way (ROW) KE&G will be preforming milling and paving operations in the Barrio Nopal & Elvira neighborhoods including concrete work consisting of sidewalk and ADA ramps.
TR-ROW-1223-01485 Void 12/29/2023 N/A UNIT 3105 Right-of-Way (ROW) KE&G will be preforming milling and paving operations in the Barrio Nopal & Elvira neighborhoods including concrete work consisting of sidewalk and ADA ramps.
TR-ROW-1223-01485 Void 12/29/2023 N/A UNIT 4 Right-of-Way (ROW) KE&G will be preforming milling and paving operations in the Barrio Nopal & Elvira neighborhoods including concrete work consisting of sidewalk and ADA ramps.
TR-ROW-1223-01485 Void 12/29/2023 N/A UNIT 5 Right-of-Way (ROW) KE&G will be preforming milling and paving operations in the Barrio Nopal & Elvira neighborhoods including concrete work consisting of sidewalk and ADA ramps.
TR-ROW-1223-01485 Void 12/29/2023 N/A UNIT 6 Right-of-Way (ROW) KE&G will be preforming milling and paving operations in the Barrio Nopal & Elvira neighborhoods including concrete work consisting of sidewalk and ADA ramps.
TR-ROW-1223-01485 Void 12/29/2023 N/A UNIT 7 Right-of-Way (ROW) KE&G will be preforming milling and paving operations in the Barrio Nopal & Elvira neighborhoods including concrete work consisting of sidewalk and ADA ramps.
TR-ROW-1223-01485 Void 12/29/2023 N/A UNIT 8 Right-of-Way (ROW) KE&G will be preforming milling and paving operations in the Barrio Nopal & Elvira neighborhoods including concrete work consisting of sidewalk and ADA ramps.
TR-ROW-1223-01485 Void 12/29/2023 N/A UNIT M1 Right-of-Way (ROW) KE&G will be preforming milling and paving operations in the Barrio Nopal & Elvira neighborhoods including concrete work consisting of sidewalk and ADA ramps.
TR-ROW-1223-01485 Void 12/29/2023 N/A UNIT M2 Right-of-Way (ROW) KE&G will be preforming milling and paving operations in the Barrio Nopal & Elvira neighborhoods including concrete work consisting of sidewalk and ADA ramps.
TR-ROW-1223-01487 Void 12/29/2023 N/A Right-of-Way (ROW) KE&G will be preforming milling and paving operations in the Barrio Nopal and Elvira neighborhoods including concrete sidewalk and ADA ramps.
TR-ROW-1223-01487 Void 12/29/2023 N/A BLDG 1 Right-of-Way (ROW) KE&G will be preforming milling and paving operations in the Barrio Nopal and Elvira neighborhoods including concrete sidewalk and ADA ramps.
TR-ROW-1223-01487 Void 12/29/2023 N/A BLDG 1 UNIT 1 Right-of-Way (ROW) KE&G will be preforming milling and paving operations in the Barrio Nopal and Elvira neighborhoods including concrete sidewalk and ADA ramps.
TR-ROW-1223-01487 Void 12/29/2023 N/A BLDG 1 UNIT 2 Right-of-Way (ROW) KE&G will be preforming milling and paving operations in the Barrio Nopal and Elvira neighborhoods including concrete sidewalk and ADA ramps.
TR-ROW-1223-01487 Void 12/29/2023 N/A BLDG 2 Right-of-Way (ROW) KE&G will be preforming milling and paving operations in the Barrio Nopal and Elvira neighborhoods including concrete sidewalk and ADA ramps.
TR-ROW-1223-01487 Void 12/29/2023 N/A BLDG 2 UNIT 1 Right-of-Way (ROW) KE&G will be preforming milling and paving operations in the Barrio Nopal and Elvira neighborhoods including concrete sidewalk and ADA ramps.
TR-ROW-1223-01487 Void 12/29/2023 N/A BLDG 2 UNIT 2 Right-of-Way (ROW) KE&G will be preforming milling and paving operations in the Barrio Nopal and Elvira neighborhoods including concrete sidewalk and ADA ramps.
TR-ROW-1223-01487 Void 12/29/2023 N/A BLDG 3 Right-of-Way (ROW) KE&G will be preforming milling and paving operations in the Barrio Nopal and Elvira neighborhoods including concrete sidewalk and ADA ramps.
TR-ROW-1223-01487 Void 12/29/2023 N/A BLDG 3 UNIT 1 Right-of-Way (ROW) KE&G will be preforming milling and paving operations in the Barrio Nopal and Elvira neighborhoods including concrete sidewalk and ADA ramps.
TR-ROW-1223-01487 Void 12/29/2023 N/A BLDG 3 UNIT 2 Right-of-Way (ROW) KE&G will be preforming milling and paving operations in the Barrio Nopal and Elvira neighborhoods including concrete sidewalk and ADA ramps.
TR-ROW-1223-01487 Void 12/29/2023 N/A BLDG 4 Right-of-Way (ROW) KE&G will be preforming milling and paving operations in the Barrio Nopal and Elvira neighborhoods including concrete sidewalk and ADA ramps.
TR-ROW-1223-01487 Void 12/29/2023 N/A BLDG 4 UNIT 1 Right-of-Way (ROW) KE&G will be preforming milling and paving operations in the Barrio Nopal and Elvira neighborhoods including concrete sidewalk and ADA ramps.
TR-ROW-1223-01487 Void 12/29/2023 N/A BLDG 4 UNIT 2 Right-of-Way (ROW) KE&G will be preforming milling and paving operations in the Barrio Nopal and Elvira neighborhoods including concrete sidewalk and ADA ramps.
TR-ROW-1223-01487 Void 12/29/2023 N/A BLDG 5 Right-of-Way (ROW) KE&G will be preforming milling and paving operations in the Barrio Nopal and Elvira neighborhoods including concrete sidewalk and ADA ramps.
TR-ROW-1223-01487 Void 12/29/2023 N/A BLDG 6 Right-of-Way (ROW) KE&G will be preforming milling and paving operations in the Barrio Nopal and Elvira neighborhoods including concrete sidewalk and ADA ramps.
TR-ROW-1223-01487 Void 12/29/2023 N/A BLDG 7 Right-of-Way (ROW) KE&G will be preforming milling and paving operations in the Barrio Nopal and Elvira neighborhoods including concrete sidewalk and ADA ramps.
TR-ROW-1223-01487 Void 12/29/2023 N/A UNIT 1 Right-of-Way (ROW) KE&G will be preforming milling and paving operations in the Barrio Nopal and Elvira neighborhoods including concrete sidewalk and ADA ramps.
TR-ROW-1223-01487 Void 12/29/2023 N/A UNIT 10 Right-of-Way (ROW) KE&G will be preforming milling and paving operations in the Barrio Nopal and Elvira neighborhoods including concrete sidewalk and ADA ramps.
TR-ROW-1223-01487 Void 12/29/2023 N/A UNIT 11 Right-of-Way (ROW) KE&G will be preforming milling and paving operations in the Barrio Nopal and Elvira neighborhoods including concrete sidewalk and ADA ramps.
TR-ROW-1223-01487 Void 12/29/2023 N/A UNIT 12 Right-of-Way (ROW) KE&G will be preforming milling and paving operations in the Barrio Nopal and Elvira neighborhoods including concrete sidewalk and ADA ramps.
TR-ROW-1223-01487 Void 12/29/2023 N/A UNIT 13 Right-of-Way (ROW) KE&G will be preforming milling and paving operations in the Barrio Nopal and Elvira neighborhoods including concrete sidewalk and ADA ramps.
TR-ROW-1223-01487 Void 12/29/2023 N/A UNIT 14 Right-of-Way (ROW) KE&G will be preforming milling and paving operations in the Barrio Nopal and Elvira neighborhoods including concrete sidewalk and ADA ramps.
TR-ROW-1223-01487 Void 12/29/2023 N/A UNIT 15 Right-of-Way (ROW) KE&G will be preforming milling and paving operations in the Barrio Nopal and Elvira neighborhoods including concrete sidewalk and ADA ramps.
TR-ROW-1223-01487 Void 12/29/2023 N/A UNIT 16 Right-of-Way (ROW) KE&G will be preforming milling and paving operations in the Barrio Nopal and Elvira neighborhoods including concrete sidewalk and ADA ramps.
TR-ROW-1223-01487 Void 12/29/2023 N/A UNIT 17 Right-of-Way (ROW) KE&G will be preforming milling and paving operations in the Barrio Nopal and Elvira neighborhoods including concrete sidewalk and ADA ramps.
TR-ROW-1223-01487 Void 12/29/2023 N/A UNIT 18 Right-of-Way (ROW) KE&G will be preforming milling and paving operations in the Barrio Nopal and Elvira neighborhoods including concrete sidewalk and ADA ramps.
TR-ROW-1223-01487 Void 12/29/2023 N/A UNIT 19 Right-of-Way (ROW) KE&G will be preforming milling and paving operations in the Barrio Nopal and Elvira neighborhoods including concrete sidewalk and ADA ramps.
TR-ROW-1223-01487 Void 12/29/2023 N/A UNIT 19A Right-of-Way (ROW) KE&G will be preforming milling and paving operations in the Barrio Nopal and Elvira neighborhoods including concrete sidewalk and ADA ramps.
TR-ROW-1223-01487 Void 12/29/2023 N/A UNIT 19B Right-of-Way (ROW) KE&G will be preforming milling and paving operations in the Barrio Nopal and Elvira neighborhoods including concrete sidewalk and ADA ramps.
TR-ROW-1223-01487 Void 12/29/2023 N/A UNIT 19C Right-of-Way (ROW) KE&G will be preforming milling and paving operations in the Barrio Nopal and Elvira neighborhoods including concrete sidewalk and ADA ramps.
TR-ROW-1223-01487 Void 12/29/2023 N/A UNIT 2 Right-of-Way (ROW) KE&G will be preforming milling and paving operations in the Barrio Nopal and Elvira neighborhoods including concrete sidewalk and ADA ramps.
TR-ROW-1223-01487 Void 12/29/2023 N/A UNIT 2101 Right-of-Way (ROW) KE&G will be preforming milling and paving operations in the Barrio Nopal and Elvira neighborhoods including concrete sidewalk and ADA ramps.
TR-ROW-1223-01487 Void 12/29/2023 N/A UNIT 2104 Right-of-Way (ROW) KE&G will be preforming milling and paving operations in the Barrio Nopal and Elvira neighborhoods including concrete sidewalk and ADA ramps.
TR-ROW-1223-01487 Void 12/29/2023 N/A UNIT 3 Right-of-Way (ROW) KE&G will be preforming milling and paving operations in the Barrio Nopal and Elvira neighborhoods including concrete sidewalk and ADA ramps.
TR-ROW-1223-01487 Void 12/29/2023 N/A UNIT 3101 Right-of-Way (ROW) KE&G will be preforming milling and paving operations in the Barrio Nopal and Elvira neighborhoods including concrete sidewalk and ADA ramps.
TR-ROW-1223-01487 Void 12/29/2023 N/A UNIT 3102 Right-of-Way (ROW) KE&G will be preforming milling and paving operations in the Barrio Nopal and Elvira neighborhoods including concrete sidewalk and ADA ramps.
TR-ROW-1223-01487 Void 12/29/2023 N/A UNIT 4 Right-of-Way (ROW) KE&G will be preforming milling and paving operations in the Barrio Nopal and Elvira neighborhoods including concrete sidewalk and ADA ramps.
TR-ROW-1223-01487 Void 12/29/2023 N/A UNIT 5 Right-of-Way (ROW) KE&G will be preforming milling and paving operations in the Barrio Nopal and Elvira neighborhoods including concrete sidewalk and ADA ramps.
TR-ROW-1223-01487 Void 12/29/2023 N/A UNIT 6 Right-of-Way (ROW) KE&G will be preforming milling and paving operations in the Barrio Nopal and Elvira neighborhoods including concrete sidewalk and ADA ramps.
TR-ROW-1223-01487 Void 12/29/2023 N/A UNIT 7 Right-of-Way (ROW) KE&G will be preforming milling and paving operations in the Barrio Nopal and Elvira neighborhoods including concrete sidewalk and ADA ramps.
TR-ROW-1223-01487 Void 12/29/2023 N/A UNIT 8 Right-of-Way (ROW) KE&G will be preforming milling and paving operations in the Barrio Nopal and Elvira neighborhoods including concrete sidewalk and ADA ramps.
TR-ROW-1223-01487 Void 12/29/2023 N/A UNIT 9 Right-of-Way (ROW) KE&G will be preforming milling and paving operations in the Barrio Nopal and Elvira neighborhoods including concrete sidewalk and ADA ramps.
TR-ROW-1223-01487 Void 12/29/2023 N/A UNIT M1 Right-of-Way (ROW) KE&G will be preforming milling and paving operations in the Barrio Nopal and Elvira neighborhoods including concrete sidewalk and ADA ramps.
TR-ROW-1223-01487 Void 12/29/2023 N/A UNIT M2 Right-of-Way (ROW) KE&G will be preforming milling and paving operations in the Barrio Nopal and Elvira neighborhoods including concrete sidewalk and ADA ramps.

Code Enforcement

Parcel Number - 138170340
Date - 04/17/2025 8:15 a.m.
Total Number Of Code Cases - 3
Case Number Case Status Entered Date Closed Date Unit Type Description
CE-VIO0325-00968 Citation 03/06/2025 N/A Code Enforcement Case RWOP / Interior remodeling to inside of property, Plumbing and Electricidal
T15DV00661 Complian 02/03/2015 N/A DNR_VIOL 2 trailers behind the church with people residing in them and no utilities hooked up to them (extension cord visible)
T15DV04611 Complian 06/24/2015 N/A DNR_VIOL DOUBLE WIDE AND SINGLE WIDE TRAILERS. THEY DO NOT HAVE PERMITS FOR EITHER OF THEM. COMPLAINTANT SAYS SHE SPOKE TO VIDAL ABOUT IT.

Plans

Parcel Number - 138170340
Date - 04/17/2025 8:15 a.m.
Total Number Of Plans - 1
Plan Number Plan Status Application Date Expired Date Unit Type Description
T22PRE0177 Closed 08/03/2022 N/A NEIGHBORHOOD NOTIFICATION Site: Evado Townhomes, Lot 45.