Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Parcel Search

 
Parcel Attributes
Parcel13817031A
JurisdictionTucson, Pima County
City of Tucson ZoningR-2
Tucson WardWard 1
Tucson Registered NeighborhoodBarrio Nopal
Pima County Data Assessor, Recorder, Treasurer, ...
Parcel Map Map
Address
Parcel Attributes Issue?

Annexations & Original City Zoning (OCZ)

Date - 12/20/2025 1:12 a.m.
Total Number Of OZC Plans - (1)
Plan Description Annexation Ordinance Effective Date OCZ Ordinance
C9-60-39 West To Silverbell Road And South To San Xavier Indian Reservation 2014 03/18/1960 2045

Permits

Parcel Number - 13817031A
Date - 12/20/2025 1:12 a.m.
Total Number Of Permits - (70)
Permit Permit Status Entered Date Expired Date Unit Type Description
TC-COM-0125-00184 Void 01/28/2025 N/A BLDG 1 Commercial Building VOIDED WRONG PERMIT TYPE Our goal is to add a heat pump package unit to each of the 15 apartments at this address. Currently the complex has evaporative coolers and floor mount heaters. The only structural changes in this job (for each apartment) are to cut in a 14in hole in the roof and a 20X20 square hole in the hallway ceiling for the new return flex duct. A heat pump unit and a curb will be installed where the swamp cooler was. For the electrical, we are tapping into the old swamp cooler disconnect for the new HVAC disconnect. We will be rewiring the old evaporative cooler disconnect for 240v and adding a 30amp 2 pull breaker.
TC-COM-0125-00184 Void 01/28/2025 N/A BLDG 2 Commercial Building VOIDED WRONG PERMIT TYPE Our goal is to add a heat pump package unit to each of the 15 apartments at this address. Currently the complex has evaporative coolers and floor mount heaters. The only structural changes in this job (for each apartment) are to cut in a 14in hole in the roof and a 20X20 square hole in the hallway ceiling for the new return flex duct. A heat pump unit and a curb will be installed where the swamp cooler was. For the electrical, we are tapping into the old swamp cooler disconnect for the new HVAC disconnect. We will be rewiring the old evaporative cooler disconnect for 240v and adding a 30amp 2 pull breaker.
TC-COM-0125-00184 Void 01/28/2025 N/A BLDG 3 Commercial Building VOIDED WRONG PERMIT TYPE Our goal is to add a heat pump package unit to each of the 15 apartments at this address. Currently the complex has evaporative coolers and floor mount heaters. The only structural changes in this job (for each apartment) are to cut in a 14in hole in the roof and a 20X20 square hole in the hallway ceiling for the new return flex duct. A heat pump unit and a curb will be installed where the swamp cooler was. For the electrical, we are tapping into the old swamp cooler disconnect for the new HVAC disconnect. We will be rewiring the old evaporative cooler disconnect for 240v and adding a 30amp 2 pull breaker.
TC-COM-0125-00184 Void 01/28/2025 N/A UNIT 1101 Commercial Building VOIDED WRONG PERMIT TYPE Our goal is to add a heat pump package unit to each of the 15 apartments at this address. Currently the complex has evaporative coolers and floor mount heaters. The only structural changes in this job (for each apartment) are to cut in a 14in hole in the roof and a 20X20 square hole in the hallway ceiling for the new return flex duct. A heat pump unit and a curb will be installed where the swamp cooler was. For the electrical, we are tapping into the old swamp cooler disconnect for the new HVAC disconnect. We will be rewiring the old evaporative cooler disconnect for 240v and adding a 30amp 2 pull breaker.
TC-COM-0125-00184 Void 01/28/2025 N/A UNIT 1102 Commercial Building VOIDED WRONG PERMIT TYPE Our goal is to add a heat pump package unit to each of the 15 apartments at this address. Currently the complex has evaporative coolers and floor mount heaters. The only structural changes in this job (for each apartment) are to cut in a 14in hole in the roof and a 20X20 square hole in the hallway ceiling for the new return flex duct. A heat pump unit and a curb will be installed where the swamp cooler was. For the electrical, we are tapping into the old swamp cooler disconnect for the new HVAC disconnect. We will be rewiring the old evaporative cooler disconnect for 240v and adding a 30amp 2 pull breaker.
TC-COM-0125-00184 Void 01/28/2025 N/A UNIT 1103 Commercial Building VOIDED WRONG PERMIT TYPE Our goal is to add a heat pump package unit to each of the 15 apartments at this address. Currently the complex has evaporative coolers and floor mount heaters. The only structural changes in this job (for each apartment) are to cut in a 14in hole in the roof and a 20X20 square hole in the hallway ceiling for the new return flex duct. A heat pump unit and a curb will be installed where the swamp cooler was. For the electrical, we are tapping into the old swamp cooler disconnect for the new HVAC disconnect. We will be rewiring the old evaporative cooler disconnect for 240v and adding a 30amp 2 pull breaker.
TC-COM-0125-00184 Void 01/28/2025 N/A UNIT 1104 Commercial Building VOIDED WRONG PERMIT TYPE Our goal is to add a heat pump package unit to each of the 15 apartments at this address. Currently the complex has evaporative coolers and floor mount heaters. The only structural changes in this job (for each apartment) are to cut in a 14in hole in the roof and a 20X20 square hole in the hallway ceiling for the new return flex duct. A heat pump unit and a curb will be installed where the swamp cooler was. For the electrical, we are tapping into the old swamp cooler disconnect for the new HVAC disconnect. We will be rewiring the old evaporative cooler disconnect for 240v and adding a 30amp 2 pull breaker.
TC-COM-0125-00184 Void 01/28/2025 N/A UNIT 1105 Commercial Building VOIDED WRONG PERMIT TYPE Our goal is to add a heat pump package unit to each of the 15 apartments at this address. Currently the complex has evaporative coolers and floor mount heaters. The only structural changes in this job (for each apartment) are to cut in a 14in hole in the roof and a 20X20 square hole in the hallway ceiling for the new return flex duct. A heat pump unit and a curb will be installed where the swamp cooler was. For the electrical, we are tapping into the old swamp cooler disconnect for the new HVAC disconnect. We will be rewiring the old evaporative cooler disconnect for 240v and adding a 30amp 2 pull breaker.
TC-COM-0125-00184 Void 01/28/2025 N/A UNIT 2101 Commercial Building VOIDED WRONG PERMIT TYPE Our goal is to add a heat pump package unit to each of the 15 apartments at this address. Currently the complex has evaporative coolers and floor mount heaters. The only structural changes in this job (for each apartment) are to cut in a 14in hole in the roof and a 20X20 square hole in the hallway ceiling for the new return flex duct. A heat pump unit and a curb will be installed where the swamp cooler was. For the electrical, we are tapping into the old swamp cooler disconnect for the new HVAC disconnect. We will be rewiring the old evaporative cooler disconnect for 240v and adding a 30amp 2 pull breaker.
TC-COM-0125-00184 Void 01/28/2025 N/A UNIT 2102 Commercial Building VOIDED WRONG PERMIT TYPE Our goal is to add a heat pump package unit to each of the 15 apartments at this address. Currently the complex has evaporative coolers and floor mount heaters. The only structural changes in this job (for each apartment) are to cut in a 14in hole in the roof and a 20X20 square hole in the hallway ceiling for the new return flex duct. A heat pump unit and a curb will be installed where the swamp cooler was. For the electrical, we are tapping into the old swamp cooler disconnect for the new HVAC disconnect. We will be rewiring the old evaporative cooler disconnect for 240v and adding a 30amp 2 pull breaker.
TC-COM-0125-00184 Void 01/28/2025 N/A UNIT 2103 Commercial Building VOIDED WRONG PERMIT TYPE Our goal is to add a heat pump package unit to each of the 15 apartments at this address. Currently the complex has evaporative coolers and floor mount heaters. The only structural changes in this job (for each apartment) are to cut in a 14in hole in the roof and a 20X20 square hole in the hallway ceiling for the new return flex duct. A heat pump unit and a curb will be installed where the swamp cooler was. For the electrical, we are tapping into the old swamp cooler disconnect for the new HVAC disconnect. We will be rewiring the old evaporative cooler disconnect for 240v and adding a 30amp 2 pull breaker.
TC-COM-0125-00184 Void 01/28/2025 N/A UNIT 2104 Commercial Building VOIDED WRONG PERMIT TYPE Our goal is to add a heat pump package unit to each of the 15 apartments at this address. Currently the complex has evaporative coolers and floor mount heaters. The only structural changes in this job (for each apartment) are to cut in a 14in hole in the roof and a 20X20 square hole in the hallway ceiling for the new return flex duct. A heat pump unit and a curb will be installed where the swamp cooler was. For the electrical, we are tapping into the old swamp cooler disconnect for the new HVAC disconnect. We will be rewiring the old evaporative cooler disconnect for 240v and adding a 30amp 2 pull breaker.
TC-COM-0125-00184 Void 01/28/2025 N/A UNIT 2105 Commercial Building VOIDED WRONG PERMIT TYPE Our goal is to add a heat pump package unit to each of the 15 apartments at this address. Currently the complex has evaporative coolers and floor mount heaters. The only structural changes in this job (for each apartment) are to cut in a 14in hole in the roof and a 20X20 square hole in the hallway ceiling for the new return flex duct. A heat pump unit and a curb will be installed where the swamp cooler was. For the electrical, we are tapping into the old swamp cooler disconnect for the new HVAC disconnect. We will be rewiring the old evaporative cooler disconnect for 240v and adding a 30amp 2 pull breaker.
TC-COM-0125-00184 Void 01/28/2025 N/A UNIT 3101 Commercial Building VOIDED WRONG PERMIT TYPE Our goal is to add a heat pump package unit to each of the 15 apartments at this address. Currently the complex has evaporative coolers and floor mount heaters. The only structural changes in this job (for each apartment) are to cut in a 14in hole in the roof and a 20X20 square hole in the hallway ceiling for the new return flex duct. A heat pump unit and a curb will be installed where the swamp cooler was. For the electrical, we are tapping into the old swamp cooler disconnect for the new HVAC disconnect. We will be rewiring the old evaporative cooler disconnect for 240v and adding a 30amp 2 pull breaker.
TC-COM-0125-00184 Void 01/28/2025 N/A UNIT 3102 Commercial Building VOIDED WRONG PERMIT TYPE Our goal is to add a heat pump package unit to each of the 15 apartments at this address. Currently the complex has evaporative coolers and floor mount heaters. The only structural changes in this job (for each apartment) are to cut in a 14in hole in the roof and a 20X20 square hole in the hallway ceiling for the new return flex duct. A heat pump unit and a curb will be installed where the swamp cooler was. For the electrical, we are tapping into the old swamp cooler disconnect for the new HVAC disconnect. We will be rewiring the old evaporative cooler disconnect for 240v and adding a 30amp 2 pull breaker.
TC-COM-0125-00184 Void 01/28/2025 N/A UNIT 3103 Commercial Building VOIDED WRONG PERMIT TYPE Our goal is to add a heat pump package unit to each of the 15 apartments at this address. Currently the complex has evaporative coolers and floor mount heaters. The only structural changes in this job (for each apartment) are to cut in a 14in hole in the roof and a 20X20 square hole in the hallway ceiling for the new return flex duct. A heat pump unit and a curb will be installed where the swamp cooler was. For the electrical, we are tapping into the old swamp cooler disconnect for the new HVAC disconnect. We will be rewiring the old evaporative cooler disconnect for 240v and adding a 30amp 2 pull breaker.
TC-COM-0125-00184 Void 01/28/2025 N/A UNIT 3104 Commercial Building VOIDED WRONG PERMIT TYPE Our goal is to add a heat pump package unit to each of the 15 apartments at this address. Currently the complex has evaporative coolers and floor mount heaters. The only structural changes in this job (for each apartment) are to cut in a 14in hole in the roof and a 20X20 square hole in the hallway ceiling for the new return flex duct. A heat pump unit and a curb will be installed where the swamp cooler was. For the electrical, we are tapping into the old swamp cooler disconnect for the new HVAC disconnect. We will be rewiring the old evaporative cooler disconnect for 240v and adding a 30amp 2 pull breaker.
TC-COM-0125-00184 Void 01/28/2025 N/A UNIT 3105 Commercial Building VOIDED WRONG PERMIT TYPE Our goal is to add a heat pump package unit to each of the 15 apartments at this address. Currently the complex has evaporative coolers and floor mount heaters. The only structural changes in this job (for each apartment) are to cut in a 14in hole in the roof and a 20X20 square hole in the hallway ceiling for the new return flex duct. A heat pump unit and a curb will be installed where the swamp cooler was. For the electrical, we are tapping into the old swamp cooler disconnect for the new HVAC disconnect. We will be rewiring the old evaporative cooler disconnect for 240v and adding a 30amp 2 pull breaker.
TC-COM-0525-00916 Issued 05/05/2025 01/04/2026 BLDG 2 Commercial Building Our goal is to remove the existing evaporative cooler and replace it with a heat pump package unit. The only structural changes in this job is to cut a 14 inch hole in the roof and a 20x20 square hole in the hallway ceiling for the new return flex duct. A heat pump unit and a curb will be installed where the evaporative cooler is currently. For the electrical, we are tapping into the old swamp cooler disconnect for the new HVAC disconnect. We will be rewiring the old evaporative cooker disconnect for 240v and adding a 30 amp 2 pull breaker.
TC-COM-0525-00916 Issued 05/05/2025 01/04/2026 UNIT 2104 Commercial Building Our goal is to remove the existing evaporative cooler and replace it with a heat pump package unit. The only structural changes in this job is to cut a 14 inch hole in the roof and a 20x20 square hole in the hallway ceiling for the new return flex duct. A heat pump unit and a curb will be installed where the evaporative cooler is currently. For the electrical, we are tapping into the old swamp cooler disconnect for the new HVAC disconnect. We will be rewiring the old evaporative cooker disconnect for 240v and adding a 30 amp 2 pull breaker.
TC-COM-0525-00918 Issued 05/05/2025 01/04/2026 BLDG 3 Commercial Building Our goal is to remove the existing evaporative cooler and replace it with a heat pump package unit. The only structural changes in this job is to cut a 14 inch hole in the roof and a 20x20 square hole in the hallway ceiling for the new return flex duct. A heat pump unit and a curb will be installed where the evaporative cooler is currently. For the electrical, we are tapping into the old swamp cooler disconnect for the new HVAC disconnect. We will be rewiring the old evaporative cooker disconnect for 240v and adding a 30 amp 2 pull breaker.
TC-COM-0525-00918 Issued 05/05/2025 01/04/2026 UNIT 3101 Commercial Building Our goal is to remove the existing evaporative cooler and replace it with a heat pump package unit. The only structural changes in this job is to cut a 14 inch hole in the roof and a 20x20 square hole in the hallway ceiling for the new return flex duct. A heat pump unit and a curb will be installed where the evaporative cooler is currently. For the electrical, we are tapping into the old swamp cooler disconnect for the new HVAC disconnect. We will be rewiring the old evaporative cooker disconnect for 240v and adding a 30 amp 2 pull breaker.
TC-COM-0525-00919 Issued 05/05/2025 01/04/2026 BLDG 3 Commercial Building Our goal is to remove the existing evaporative cooler and replace it with a heat pump package unit. The only structural changes in this job is to cut a 14 inch hole in the roof and a 20x20 square hole in the hallway ceiling for the new return flex duct. A heat pump unit and a curb will be installed where the evaporative cooler is currently. For the electrical, we are tapping into the old swamp cooler disconnect for the new HVAC disconnect. We will be rewiring the old evaporative cooker disconnect for 240v and adding a 30 amp 2 pull breaker.
TC-COM-0525-00919 Issued 05/05/2025 01/04/2026 UNIT 3102 Commercial Building Our goal is to remove the existing evaporative cooler and replace it with a heat pump package unit. The only structural changes in this job is to cut a 14 inch hole in the roof and a 20x20 square hole in the hallway ceiling for the new return flex duct. A heat pump unit and a curb will be installed where the evaporative cooler is currently. For the electrical, we are tapping into the old swamp cooler disconnect for the new HVAC disconnect. We will be rewiring the old evaporative cooker disconnect for 240v and adding a 30 amp 2 pull breaker.
TR-ROW-1223-01487 Void 12/29/2023 N/A Right-of-Way (ROW) KE&G will be preforming milling and paving operations in the Barrio Nopal and Elvira neighborhoods including concrete sidewalk and ADA ramps.
TR-ROW-1223-01487 Void 12/29/2023 N/A BLDG 1 Right-of-Way (ROW) KE&G will be preforming milling and paving operations in the Barrio Nopal and Elvira neighborhoods including concrete sidewalk and ADA ramps.
TR-ROW-1223-01487 Void 12/29/2023 N/A BLDG 1 UNIT 1 Right-of-Way (ROW) KE&G will be preforming milling and paving operations in the Barrio Nopal and Elvira neighborhoods including concrete sidewalk and ADA ramps.
TR-ROW-1223-01487 Void 12/29/2023 N/A BLDG 1 UNIT 2 Right-of-Way (ROW) KE&G will be preforming milling and paving operations in the Barrio Nopal and Elvira neighborhoods including concrete sidewalk and ADA ramps.
TR-ROW-1223-01487 Void 12/29/2023 N/A BLDG 2 Right-of-Way (ROW) KE&G will be preforming milling and paving operations in the Barrio Nopal and Elvira neighborhoods including concrete sidewalk and ADA ramps.
TR-ROW-1223-01487 Void 12/29/2023 N/A BLDG 2 UNIT 1 Right-of-Way (ROW) KE&G will be preforming milling and paving operations in the Barrio Nopal and Elvira neighborhoods including concrete sidewalk and ADA ramps.
TR-ROW-1223-01487 Void 12/29/2023 N/A BLDG 2 UNIT 2 Right-of-Way (ROW) KE&G will be preforming milling and paving operations in the Barrio Nopal and Elvira neighborhoods including concrete sidewalk and ADA ramps.
TR-ROW-1223-01487 Void 12/29/2023 N/A BLDG 3 Right-of-Way (ROW) KE&G will be preforming milling and paving operations in the Barrio Nopal and Elvira neighborhoods including concrete sidewalk and ADA ramps.
TR-ROW-1223-01487 Void 12/29/2023 N/A BLDG 3 UNIT 1 Right-of-Way (ROW) KE&G will be preforming milling and paving operations in the Barrio Nopal and Elvira neighborhoods including concrete sidewalk and ADA ramps.
TR-ROW-1223-01487 Void 12/29/2023 N/A BLDG 3 UNIT 2 Right-of-Way (ROW) KE&G will be preforming milling and paving operations in the Barrio Nopal and Elvira neighborhoods including concrete sidewalk and ADA ramps.
TR-ROW-1223-01487 Void 12/29/2023 N/A BLDG 4 Right-of-Way (ROW) KE&G will be preforming milling and paving operations in the Barrio Nopal and Elvira neighborhoods including concrete sidewalk and ADA ramps.
TR-ROW-1223-01487 Void 12/29/2023 N/A BLDG 4 UNIT 1 Right-of-Way (ROW) KE&G will be preforming milling and paving operations in the Barrio Nopal and Elvira neighborhoods including concrete sidewalk and ADA ramps.
TR-ROW-1223-01487 Void 12/29/2023 N/A BLDG 4 UNIT 2 Right-of-Way (ROW) KE&G will be preforming milling and paving operations in the Barrio Nopal and Elvira neighborhoods including concrete sidewalk and ADA ramps.
TR-ROW-1223-01487 Void 12/29/2023 N/A BLDG 5 Right-of-Way (ROW) KE&G will be preforming milling and paving operations in the Barrio Nopal and Elvira neighborhoods including concrete sidewalk and ADA ramps.
TR-ROW-1223-01487 Void 12/29/2023 N/A BLDG 6 Right-of-Way (ROW) KE&G will be preforming milling and paving operations in the Barrio Nopal and Elvira neighborhoods including concrete sidewalk and ADA ramps.
TR-ROW-1223-01487 Void 12/29/2023 N/A BLDG 7 Right-of-Way (ROW) KE&G will be preforming milling and paving operations in the Barrio Nopal and Elvira neighborhoods including concrete sidewalk and ADA ramps.
TR-ROW-1223-01487 Void 12/29/2023 N/A UNIT 1 Right-of-Way (ROW) KE&G will be preforming milling and paving operations in the Barrio Nopal and Elvira neighborhoods including concrete sidewalk and ADA ramps.
TR-ROW-1223-01487 Void 12/29/2023 N/A UNIT 10 Right-of-Way (ROW) KE&G will be preforming milling and paving operations in the Barrio Nopal and Elvira neighborhoods including concrete sidewalk and ADA ramps.
TR-ROW-1223-01487 Void 12/29/2023 N/A UNIT 11 Right-of-Way (ROW) KE&G will be preforming milling and paving operations in the Barrio Nopal and Elvira neighborhoods including concrete sidewalk and ADA ramps.
TR-ROW-1223-01487 Void 12/29/2023 N/A UNIT 12 Right-of-Way (ROW) KE&G will be preforming milling and paving operations in the Barrio Nopal and Elvira neighborhoods including concrete sidewalk and ADA ramps.
TR-ROW-1223-01487 Void 12/29/2023 N/A UNIT 13 Right-of-Way (ROW) KE&G will be preforming milling and paving operations in the Barrio Nopal and Elvira neighborhoods including concrete sidewalk and ADA ramps.
TR-ROW-1223-01487 Void 12/29/2023 N/A UNIT 14 Right-of-Way (ROW) KE&G will be preforming milling and paving operations in the Barrio Nopal and Elvira neighborhoods including concrete sidewalk and ADA ramps.
TR-ROW-1223-01487 Void 12/29/2023 N/A UNIT 15 Right-of-Way (ROW) KE&G will be preforming milling and paving operations in the Barrio Nopal and Elvira neighborhoods including concrete sidewalk and ADA ramps.
TR-ROW-1223-01487 Void 12/29/2023 N/A UNIT 16 Right-of-Way (ROW) KE&G will be preforming milling and paving operations in the Barrio Nopal and Elvira neighborhoods including concrete sidewalk and ADA ramps.
TR-ROW-1223-01487 Void 12/29/2023 N/A UNIT 17 Right-of-Way (ROW) KE&G will be preforming milling and paving operations in the Barrio Nopal and Elvira neighborhoods including concrete sidewalk and ADA ramps.
TR-ROW-1223-01487 Void 12/29/2023 N/A UNIT 18 Right-of-Way (ROW) KE&G will be preforming milling and paving operations in the Barrio Nopal and Elvira neighborhoods including concrete sidewalk and ADA ramps.
TR-ROW-1223-01487 Void 12/29/2023 N/A UNIT 19 Right-of-Way (ROW) KE&G will be preforming milling and paving operations in the Barrio Nopal and Elvira neighborhoods including concrete sidewalk and ADA ramps.
TR-ROW-1223-01487 Void 12/29/2023 N/A UNIT 19A Right-of-Way (ROW) KE&G will be preforming milling and paving operations in the Barrio Nopal and Elvira neighborhoods including concrete sidewalk and ADA ramps.
TR-ROW-1223-01487 Void 12/29/2023 N/A UNIT 19B Right-of-Way (ROW) KE&G will be preforming milling and paving operations in the Barrio Nopal and Elvira neighborhoods including concrete sidewalk and ADA ramps.
TR-ROW-1223-01487 Void 12/29/2023 N/A UNIT 19C Right-of-Way (ROW) KE&G will be preforming milling and paving operations in the Barrio Nopal and Elvira neighborhoods including concrete sidewalk and ADA ramps.
TR-ROW-1223-01487 Void 12/29/2023 N/A UNIT 2 Right-of-Way (ROW) KE&G will be preforming milling and paving operations in the Barrio Nopal and Elvira neighborhoods including concrete sidewalk and ADA ramps.
TR-ROW-1223-01487 Void 12/29/2023 N/A UNIT 2101 Right-of-Way (ROW) KE&G will be preforming milling and paving operations in the Barrio Nopal and Elvira neighborhoods including concrete sidewalk and ADA ramps.
TR-ROW-1223-01487 Void 12/29/2023 N/A UNIT 2104 Right-of-Way (ROW) KE&G will be preforming milling and paving operations in the Barrio Nopal and Elvira neighborhoods including concrete sidewalk and ADA ramps.
TR-ROW-1223-01487 Void 12/29/2023 N/A UNIT 3 Right-of-Way (ROW) KE&G will be preforming milling and paving operations in the Barrio Nopal and Elvira neighborhoods including concrete sidewalk and ADA ramps.
TR-ROW-1223-01487 Void 12/29/2023 N/A UNIT 3101 Right-of-Way (ROW) KE&G will be preforming milling and paving operations in the Barrio Nopal and Elvira neighborhoods including concrete sidewalk and ADA ramps.
TR-ROW-1223-01487 Void 12/29/2023 N/A UNIT 3102 Right-of-Way (ROW) KE&G will be preforming milling and paving operations in the Barrio Nopal and Elvira neighborhoods including concrete sidewalk and ADA ramps.
TR-ROW-1223-01487 Void 12/29/2023 N/A UNIT 4 Right-of-Way (ROW) KE&G will be preforming milling and paving operations in the Barrio Nopal and Elvira neighborhoods including concrete sidewalk and ADA ramps.
TR-ROW-1223-01487 Void 12/29/2023 N/A UNIT 5 Right-of-Way (ROW) KE&G will be preforming milling and paving operations in the Barrio Nopal and Elvira neighborhoods including concrete sidewalk and ADA ramps.
TR-ROW-1223-01487 Void 12/29/2023 N/A UNIT 6 Right-of-Way (ROW) KE&G will be preforming milling and paving operations in the Barrio Nopal and Elvira neighborhoods including concrete sidewalk and ADA ramps.
TR-ROW-1223-01487 Void 12/29/2023 N/A UNIT 7 Right-of-Way (ROW) KE&G will be preforming milling and paving operations in the Barrio Nopal and Elvira neighborhoods including concrete sidewalk and ADA ramps.
TR-ROW-1223-01487 Void 12/29/2023 N/A UNIT 8 Right-of-Way (ROW) KE&G will be preforming milling and paving operations in the Barrio Nopal and Elvira neighborhoods including concrete sidewalk and ADA ramps.
TR-ROW-1223-01487 Void 12/29/2023 N/A UNIT 9 Right-of-Way (ROW) KE&G will be preforming milling and paving operations in the Barrio Nopal and Elvira neighborhoods including concrete sidewalk and ADA ramps.
TR-ROW-1223-01487 Void 12/29/2023 N/A UNIT M1 Right-of-Way (ROW) KE&G will be preforming milling and paving operations in the Barrio Nopal and Elvira neighborhoods including concrete sidewalk and ADA ramps.
TR-ROW-1223-01487 Void 12/29/2023 N/A UNIT M2 Right-of-Way (ROW) KE&G will be preforming milling and paving operations in the Barrio Nopal and Elvira neighborhoods including concrete sidewalk and ADA ramps.
T16RW02369 Final 10/29/2016 11/30/2016 ROW (2) 5x5 BELLHOLES IN DIRT ON THE NORTH SIDE OF STREET - TO REPAIR GAS LINE
T20CM08638 Final 12/10/2020 08/17/2021 COMBO Residential solar installation KW, 35 panels, 1 inverter.

Code Enforcement

Parcel Number - 13817031A
Date - 12/20/2025 1:12 a.m.
Total Number Of Code Cases - 1
Case Number Case Status Entered Date Closed Date Unit Type Description
CE-VIO0424-01324 Referred 04/11/2024 04/11/2024 Code Enforcement Case JMV : REFERRED TO ODS - 10 inoperable abandoned cars

Plans

Parcel Number - 13817031A
Date - 12/20/2025 1:12 a.m.
Total Number Of Plans - 1
Plan Number Plan Status Application Date Expired Date Unit Type Description
TP-PRE-0125-00021 Complete 01/31/2025 N/A Pre-Application 5 Lot Split