Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Parcel Search: 13817024A
Parcel Search
Parcel Attributes
| Parcel | 13817024A |
|---|---|
| Jurisdiction | Tucson, Pima County |
| City of Tucson Zoning | R-2 |
| Tucson Ward | Ward 1 |
| Tucson Registered Neighborhood | Barrio Nopal |
| Pima County Data | Assessor, Recorder, Treasurer, ... |
| Parcel Map | Map |
| Addresses | |
| Parcel Attributes Issue? | |
Annexations & Original City Zoning (OCZ)
Date - 12/19/2025 11:46 p.m.
Total Number Of OZC Plans - (1)
Special Development Requests & Requirements
Date - 12/19/2025 11:46 p.m.
Total Number Of Special Development Permits - (1)
| Activity Number | Status | Apply Date | Expired Date | Type | Description |
|---|---|---|---|---|---|
| H000003168 | Closed | N/A |
Permits
Parcel Number - 13817024A
Date - 12/19/2025 11:46 p.m.
Total Number Of Permits - (68)
| Permit | Permit Status | Entered Date | Expired Date | Unit | Type | Description |
|---|---|---|---|---|---|---|
| TC-COM-0125-00184 | Void | 01/28/2025 | N/A | BLDG 1 | Commercial Building | VOIDED WRONG PERMIT TYPE Our goal is to add a heat pump package unit to each of the 15 apartments at this address. Currently the complex has evaporative coolers and floor mount heaters. The only structural changes in this job (for each apartment) are to cut in a 14in hole in the roof and a 20X20 square hole in the hallway ceiling for the new return flex duct. A heat pump unit and a curb will be installed where the swamp cooler was. For the electrical, we are tapping into the old swamp cooler disconnect for the new HVAC disconnect. We will be rewiring the old evaporative cooler disconnect for 240v and adding a 30amp 2 pull breaker. |
| TC-COM-0125-00184 | Void | 01/28/2025 | N/A | BLDG 2 | Commercial Building | VOIDED WRONG PERMIT TYPE Our goal is to add a heat pump package unit to each of the 15 apartments at this address. Currently the complex has evaporative coolers and floor mount heaters. The only structural changes in this job (for each apartment) are to cut in a 14in hole in the roof and a 20X20 square hole in the hallway ceiling for the new return flex duct. A heat pump unit and a curb will be installed where the swamp cooler was. For the electrical, we are tapping into the old swamp cooler disconnect for the new HVAC disconnect. We will be rewiring the old evaporative cooler disconnect for 240v and adding a 30amp 2 pull breaker. |
| TC-COM-0125-00184 | Void | 01/28/2025 | N/A | BLDG 3 | Commercial Building | VOIDED WRONG PERMIT TYPE Our goal is to add a heat pump package unit to each of the 15 apartments at this address. Currently the complex has evaporative coolers and floor mount heaters. The only structural changes in this job (for each apartment) are to cut in a 14in hole in the roof and a 20X20 square hole in the hallway ceiling for the new return flex duct. A heat pump unit and a curb will be installed where the swamp cooler was. For the electrical, we are tapping into the old swamp cooler disconnect for the new HVAC disconnect. We will be rewiring the old evaporative cooler disconnect for 240v and adding a 30amp 2 pull breaker. |
| TC-COM-0125-00184 | Void | 01/28/2025 | N/A | UNIT 1101 | Commercial Building | VOIDED WRONG PERMIT TYPE Our goal is to add a heat pump package unit to each of the 15 apartments at this address. Currently the complex has evaporative coolers and floor mount heaters. The only structural changes in this job (for each apartment) are to cut in a 14in hole in the roof and a 20X20 square hole in the hallway ceiling for the new return flex duct. A heat pump unit and a curb will be installed where the swamp cooler was. For the electrical, we are tapping into the old swamp cooler disconnect for the new HVAC disconnect. We will be rewiring the old evaporative cooler disconnect for 240v and adding a 30amp 2 pull breaker. |
| TC-COM-0125-00184 | Void | 01/28/2025 | N/A | UNIT 1102 | Commercial Building | VOIDED WRONG PERMIT TYPE Our goal is to add a heat pump package unit to each of the 15 apartments at this address. Currently the complex has evaporative coolers and floor mount heaters. The only structural changes in this job (for each apartment) are to cut in a 14in hole in the roof and a 20X20 square hole in the hallway ceiling for the new return flex duct. A heat pump unit and a curb will be installed where the swamp cooler was. For the electrical, we are tapping into the old swamp cooler disconnect for the new HVAC disconnect. We will be rewiring the old evaporative cooler disconnect for 240v and adding a 30amp 2 pull breaker. |
| TC-COM-0125-00184 | Void | 01/28/2025 | N/A | UNIT 1103 | Commercial Building | VOIDED WRONG PERMIT TYPE Our goal is to add a heat pump package unit to each of the 15 apartments at this address. Currently the complex has evaporative coolers and floor mount heaters. The only structural changes in this job (for each apartment) are to cut in a 14in hole in the roof and a 20X20 square hole in the hallway ceiling for the new return flex duct. A heat pump unit and a curb will be installed where the swamp cooler was. For the electrical, we are tapping into the old swamp cooler disconnect for the new HVAC disconnect. We will be rewiring the old evaporative cooler disconnect for 240v and adding a 30amp 2 pull breaker. |
| TC-COM-0125-00184 | Void | 01/28/2025 | N/A | UNIT 1104 | Commercial Building | VOIDED WRONG PERMIT TYPE Our goal is to add a heat pump package unit to each of the 15 apartments at this address. Currently the complex has evaporative coolers and floor mount heaters. The only structural changes in this job (for each apartment) are to cut in a 14in hole in the roof and a 20X20 square hole in the hallway ceiling for the new return flex duct. A heat pump unit and a curb will be installed where the swamp cooler was. For the electrical, we are tapping into the old swamp cooler disconnect for the new HVAC disconnect. We will be rewiring the old evaporative cooler disconnect for 240v and adding a 30amp 2 pull breaker. |
| TC-COM-0125-00184 | Void | 01/28/2025 | N/A | UNIT 1105 | Commercial Building | VOIDED WRONG PERMIT TYPE Our goal is to add a heat pump package unit to each of the 15 apartments at this address. Currently the complex has evaporative coolers and floor mount heaters. The only structural changes in this job (for each apartment) are to cut in a 14in hole in the roof and a 20X20 square hole in the hallway ceiling for the new return flex duct. A heat pump unit and a curb will be installed where the swamp cooler was. For the electrical, we are tapping into the old swamp cooler disconnect for the new HVAC disconnect. We will be rewiring the old evaporative cooler disconnect for 240v and adding a 30amp 2 pull breaker. |
| TC-COM-0125-00184 | Void | 01/28/2025 | N/A | UNIT 2101 | Commercial Building | VOIDED WRONG PERMIT TYPE Our goal is to add a heat pump package unit to each of the 15 apartments at this address. Currently the complex has evaporative coolers and floor mount heaters. The only structural changes in this job (for each apartment) are to cut in a 14in hole in the roof and a 20X20 square hole in the hallway ceiling for the new return flex duct. A heat pump unit and a curb will be installed where the swamp cooler was. For the electrical, we are tapping into the old swamp cooler disconnect for the new HVAC disconnect. We will be rewiring the old evaporative cooler disconnect for 240v and adding a 30amp 2 pull breaker. |
| TC-COM-0125-00184 | Void | 01/28/2025 | N/A | UNIT 2102 | Commercial Building | VOIDED WRONG PERMIT TYPE Our goal is to add a heat pump package unit to each of the 15 apartments at this address. Currently the complex has evaporative coolers and floor mount heaters. The only structural changes in this job (for each apartment) are to cut in a 14in hole in the roof and a 20X20 square hole in the hallway ceiling for the new return flex duct. A heat pump unit and a curb will be installed where the swamp cooler was. For the electrical, we are tapping into the old swamp cooler disconnect for the new HVAC disconnect. We will be rewiring the old evaporative cooler disconnect for 240v and adding a 30amp 2 pull breaker. |
| TC-COM-0125-00184 | Void | 01/28/2025 | N/A | UNIT 2103 | Commercial Building | VOIDED WRONG PERMIT TYPE Our goal is to add a heat pump package unit to each of the 15 apartments at this address. Currently the complex has evaporative coolers and floor mount heaters. The only structural changes in this job (for each apartment) are to cut in a 14in hole in the roof and a 20X20 square hole in the hallway ceiling for the new return flex duct. A heat pump unit and a curb will be installed where the swamp cooler was. For the electrical, we are tapping into the old swamp cooler disconnect for the new HVAC disconnect. We will be rewiring the old evaporative cooler disconnect for 240v and adding a 30amp 2 pull breaker. |
| TC-COM-0125-00184 | Void | 01/28/2025 | N/A | UNIT 2104 | Commercial Building | VOIDED WRONG PERMIT TYPE Our goal is to add a heat pump package unit to each of the 15 apartments at this address. Currently the complex has evaporative coolers and floor mount heaters. The only structural changes in this job (for each apartment) are to cut in a 14in hole in the roof and a 20X20 square hole in the hallway ceiling for the new return flex duct. A heat pump unit and a curb will be installed where the swamp cooler was. For the electrical, we are tapping into the old swamp cooler disconnect for the new HVAC disconnect. We will be rewiring the old evaporative cooler disconnect for 240v and adding a 30amp 2 pull breaker. |
| TC-COM-0125-00184 | Void | 01/28/2025 | N/A | UNIT 2105 | Commercial Building | VOIDED WRONG PERMIT TYPE Our goal is to add a heat pump package unit to each of the 15 apartments at this address. Currently the complex has evaporative coolers and floor mount heaters. The only structural changes in this job (for each apartment) are to cut in a 14in hole in the roof and a 20X20 square hole in the hallway ceiling for the new return flex duct. A heat pump unit and a curb will be installed where the swamp cooler was. For the electrical, we are tapping into the old swamp cooler disconnect for the new HVAC disconnect. We will be rewiring the old evaporative cooler disconnect for 240v and adding a 30amp 2 pull breaker. |
| TC-COM-0125-00184 | Void | 01/28/2025 | N/A | UNIT 3101 | Commercial Building | VOIDED WRONG PERMIT TYPE Our goal is to add a heat pump package unit to each of the 15 apartments at this address. Currently the complex has evaporative coolers and floor mount heaters. The only structural changes in this job (for each apartment) are to cut in a 14in hole in the roof and a 20X20 square hole in the hallway ceiling for the new return flex duct. A heat pump unit and a curb will be installed where the swamp cooler was. For the electrical, we are tapping into the old swamp cooler disconnect for the new HVAC disconnect. We will be rewiring the old evaporative cooler disconnect for 240v and adding a 30amp 2 pull breaker. |
| TC-COM-0125-00184 | Void | 01/28/2025 | N/A | UNIT 3102 | Commercial Building | VOIDED WRONG PERMIT TYPE Our goal is to add a heat pump package unit to each of the 15 apartments at this address. Currently the complex has evaporative coolers and floor mount heaters. The only structural changes in this job (for each apartment) are to cut in a 14in hole in the roof and a 20X20 square hole in the hallway ceiling for the new return flex duct. A heat pump unit and a curb will be installed where the swamp cooler was. For the electrical, we are tapping into the old swamp cooler disconnect for the new HVAC disconnect. We will be rewiring the old evaporative cooler disconnect for 240v and adding a 30amp 2 pull breaker. |
| TC-COM-0125-00184 | Void | 01/28/2025 | N/A | UNIT 3103 | Commercial Building | VOIDED WRONG PERMIT TYPE Our goal is to add a heat pump package unit to each of the 15 apartments at this address. Currently the complex has evaporative coolers and floor mount heaters. The only structural changes in this job (for each apartment) are to cut in a 14in hole in the roof and a 20X20 square hole in the hallway ceiling for the new return flex duct. A heat pump unit and a curb will be installed where the swamp cooler was. For the electrical, we are tapping into the old swamp cooler disconnect for the new HVAC disconnect. We will be rewiring the old evaporative cooler disconnect for 240v and adding a 30amp 2 pull breaker. |
| TC-COM-0125-00184 | Void | 01/28/2025 | N/A | UNIT 3104 | Commercial Building | VOIDED WRONG PERMIT TYPE Our goal is to add a heat pump package unit to each of the 15 apartments at this address. Currently the complex has evaporative coolers and floor mount heaters. The only structural changes in this job (for each apartment) are to cut in a 14in hole in the roof and a 20X20 square hole in the hallway ceiling for the new return flex duct. A heat pump unit and a curb will be installed where the swamp cooler was. For the electrical, we are tapping into the old swamp cooler disconnect for the new HVAC disconnect. We will be rewiring the old evaporative cooler disconnect for 240v and adding a 30amp 2 pull breaker. |
| TC-COM-0125-00184 | Void | 01/28/2025 | N/A | UNIT 3105 | Commercial Building | VOIDED WRONG PERMIT TYPE Our goal is to add a heat pump package unit to each of the 15 apartments at this address. Currently the complex has evaporative coolers and floor mount heaters. The only structural changes in this job (for each apartment) are to cut in a 14in hole in the roof and a 20X20 square hole in the hallway ceiling for the new return flex duct. A heat pump unit and a curb will be installed where the swamp cooler was. For the electrical, we are tapping into the old swamp cooler disconnect for the new HVAC disconnect. We will be rewiring the old evaporative cooler disconnect for 240v and adding a 30amp 2 pull breaker. |
| TC-COM-0525-00913 | Issued | 05/05/2025 | 01/04/2026 | BLDG 2 | Commercial Building | Our goal is to remove the existing evaporative cooler and replace it with a heat pump package unit. The only structural changes in this job is to cut a 14 inch hole in the roof and a 20x20 square hole in the hallway ceiling for the new return flex duct. A heat pump unit and a curb will be installed where the evaporative cooler is currently. For the electrical, we are tapping into the old swamp cooler disconnect for the new HVAC disconnect. We will be rewiring the old evaporative cooker disconnect for 240v and adding a 30 amp 2 pull breaker. |
| TC-COM-0525-00913 | Issued | 05/05/2025 | 01/04/2026 | UNIT 2101 | Commercial Building | Our goal is to remove the existing evaporative cooler and replace it with a heat pump package unit. The only structural changes in this job is to cut a 14 inch hole in the roof and a 20x20 square hole in the hallway ceiling for the new return flex duct. A heat pump unit and a curb will be installed where the evaporative cooler is currently. For the electrical, we are tapping into the old swamp cooler disconnect for the new HVAC disconnect. We will be rewiring the old evaporative cooker disconnect for 240v and adding a 30 amp 2 pull breaker. |
| TR-ROW-1223-01487 | Void | 12/29/2023 | N/A | Right-of-Way (ROW) | KE&G will be preforming milling and paving operations in the Barrio Nopal and Elvira neighborhoods including concrete sidewalk and ADA ramps. | |
| TR-ROW-1223-01487 | Void | 12/29/2023 | N/A | BLDG 1 | Right-of-Way (ROW) | KE&G will be preforming milling and paving operations in the Barrio Nopal and Elvira neighborhoods including concrete sidewalk and ADA ramps. |
| TR-ROW-1223-01487 | Void | 12/29/2023 | N/A | BLDG 1 UNIT 1 | Right-of-Way (ROW) | KE&G will be preforming milling and paving operations in the Barrio Nopal and Elvira neighborhoods including concrete sidewalk and ADA ramps. |
| TR-ROW-1223-01487 | Void | 12/29/2023 | N/A | BLDG 1 UNIT 2 | Right-of-Way (ROW) | KE&G will be preforming milling and paving operations in the Barrio Nopal and Elvira neighborhoods including concrete sidewalk and ADA ramps. |
| TR-ROW-1223-01487 | Void | 12/29/2023 | N/A | BLDG 2 | Right-of-Way (ROW) | KE&G will be preforming milling and paving operations in the Barrio Nopal and Elvira neighborhoods including concrete sidewalk and ADA ramps. |
| TR-ROW-1223-01487 | Void | 12/29/2023 | N/A | BLDG 2 UNIT 1 | Right-of-Way (ROW) | KE&G will be preforming milling and paving operations in the Barrio Nopal and Elvira neighborhoods including concrete sidewalk and ADA ramps. |
| TR-ROW-1223-01487 | Void | 12/29/2023 | N/A | BLDG 2 UNIT 2 | Right-of-Way (ROW) | KE&G will be preforming milling and paving operations in the Barrio Nopal and Elvira neighborhoods including concrete sidewalk and ADA ramps. |
| TR-ROW-1223-01487 | Void | 12/29/2023 | N/A | BLDG 3 | Right-of-Way (ROW) | KE&G will be preforming milling and paving operations in the Barrio Nopal and Elvira neighborhoods including concrete sidewalk and ADA ramps. |
| TR-ROW-1223-01487 | Void | 12/29/2023 | N/A | BLDG 3 UNIT 1 | Right-of-Way (ROW) | KE&G will be preforming milling and paving operations in the Barrio Nopal and Elvira neighborhoods including concrete sidewalk and ADA ramps. |
| TR-ROW-1223-01487 | Void | 12/29/2023 | N/A | BLDG 3 UNIT 2 | Right-of-Way (ROW) | KE&G will be preforming milling and paving operations in the Barrio Nopal and Elvira neighborhoods including concrete sidewalk and ADA ramps. |
| TR-ROW-1223-01487 | Void | 12/29/2023 | N/A | BLDG 4 | Right-of-Way (ROW) | KE&G will be preforming milling and paving operations in the Barrio Nopal and Elvira neighborhoods including concrete sidewalk and ADA ramps. |
| TR-ROW-1223-01487 | Void | 12/29/2023 | N/A | BLDG 4 UNIT 1 | Right-of-Way (ROW) | KE&G will be preforming milling and paving operations in the Barrio Nopal and Elvira neighborhoods including concrete sidewalk and ADA ramps. |
| TR-ROW-1223-01487 | Void | 12/29/2023 | N/A | BLDG 4 UNIT 2 | Right-of-Way (ROW) | KE&G will be preforming milling and paving operations in the Barrio Nopal and Elvira neighborhoods including concrete sidewalk and ADA ramps. |
| TR-ROW-1223-01487 | Void | 12/29/2023 | N/A | BLDG 5 | Right-of-Way (ROW) | KE&G will be preforming milling and paving operations in the Barrio Nopal and Elvira neighborhoods including concrete sidewalk and ADA ramps. |
| TR-ROW-1223-01487 | Void | 12/29/2023 | N/A | BLDG 6 | Right-of-Way (ROW) | KE&G will be preforming milling and paving operations in the Barrio Nopal and Elvira neighborhoods including concrete sidewalk and ADA ramps. |
| TR-ROW-1223-01487 | Void | 12/29/2023 | N/A | BLDG 7 | Right-of-Way (ROW) | KE&G will be preforming milling and paving operations in the Barrio Nopal and Elvira neighborhoods including concrete sidewalk and ADA ramps. |
| TR-ROW-1223-01487 | Void | 12/29/2023 | N/A | UNIT 1 | Right-of-Way (ROW) | KE&G will be preforming milling and paving operations in the Barrio Nopal and Elvira neighborhoods including concrete sidewalk and ADA ramps. |
| TR-ROW-1223-01487 | Void | 12/29/2023 | N/A | UNIT 10 | Right-of-Way (ROW) | KE&G will be preforming milling and paving operations in the Barrio Nopal and Elvira neighborhoods including concrete sidewalk and ADA ramps. |
| TR-ROW-1223-01487 | Void | 12/29/2023 | N/A | UNIT 11 | Right-of-Way (ROW) | KE&G will be preforming milling and paving operations in the Barrio Nopal and Elvira neighborhoods including concrete sidewalk and ADA ramps. |
| TR-ROW-1223-01487 | Void | 12/29/2023 | N/A | UNIT 12 | Right-of-Way (ROW) | KE&G will be preforming milling and paving operations in the Barrio Nopal and Elvira neighborhoods including concrete sidewalk and ADA ramps. |
| TR-ROW-1223-01487 | Void | 12/29/2023 | N/A | UNIT 13 | Right-of-Way (ROW) | KE&G will be preforming milling and paving operations in the Barrio Nopal and Elvira neighborhoods including concrete sidewalk and ADA ramps. |
| TR-ROW-1223-01487 | Void | 12/29/2023 | N/A | UNIT 14 | Right-of-Way (ROW) | KE&G will be preforming milling and paving operations in the Barrio Nopal and Elvira neighborhoods including concrete sidewalk and ADA ramps. |
| TR-ROW-1223-01487 | Void | 12/29/2023 | N/A | UNIT 15 | Right-of-Way (ROW) | KE&G will be preforming milling and paving operations in the Barrio Nopal and Elvira neighborhoods including concrete sidewalk and ADA ramps. |
| TR-ROW-1223-01487 | Void | 12/29/2023 | N/A | UNIT 16 | Right-of-Way (ROW) | KE&G will be preforming milling and paving operations in the Barrio Nopal and Elvira neighborhoods including concrete sidewalk and ADA ramps. |
| TR-ROW-1223-01487 | Void | 12/29/2023 | N/A | UNIT 17 | Right-of-Way (ROW) | KE&G will be preforming milling and paving operations in the Barrio Nopal and Elvira neighborhoods including concrete sidewalk and ADA ramps. |
| TR-ROW-1223-01487 | Void | 12/29/2023 | N/A | UNIT 18 | Right-of-Way (ROW) | KE&G will be preforming milling and paving operations in the Barrio Nopal and Elvira neighborhoods including concrete sidewalk and ADA ramps. |
| TR-ROW-1223-01487 | Void | 12/29/2023 | N/A | UNIT 19 | Right-of-Way (ROW) | KE&G will be preforming milling and paving operations in the Barrio Nopal and Elvira neighborhoods including concrete sidewalk and ADA ramps. |
| TR-ROW-1223-01487 | Void | 12/29/2023 | N/A | UNIT 19A | Right-of-Way (ROW) | KE&G will be preforming milling and paving operations in the Barrio Nopal and Elvira neighborhoods including concrete sidewalk and ADA ramps. |
| TR-ROW-1223-01487 | Void | 12/29/2023 | N/A | UNIT 19B | Right-of-Way (ROW) | KE&G will be preforming milling and paving operations in the Barrio Nopal and Elvira neighborhoods including concrete sidewalk and ADA ramps. |
| TR-ROW-1223-01487 | Void | 12/29/2023 | N/A | UNIT 19C | Right-of-Way (ROW) | KE&G will be preforming milling and paving operations in the Barrio Nopal and Elvira neighborhoods including concrete sidewalk and ADA ramps. |
| TR-ROW-1223-01487 | Void | 12/29/2023 | N/A | UNIT 2 | Right-of-Way (ROW) | KE&G will be preforming milling and paving operations in the Barrio Nopal and Elvira neighborhoods including concrete sidewalk and ADA ramps. |
| TR-ROW-1223-01487 | Void | 12/29/2023 | N/A | UNIT 2101 | Right-of-Way (ROW) | KE&G will be preforming milling and paving operations in the Barrio Nopal and Elvira neighborhoods including concrete sidewalk and ADA ramps. |
| TR-ROW-1223-01487 | Void | 12/29/2023 | N/A | UNIT 2104 | Right-of-Way (ROW) | KE&G will be preforming milling and paving operations in the Barrio Nopal and Elvira neighborhoods including concrete sidewalk and ADA ramps. |
| TR-ROW-1223-01487 | Void | 12/29/2023 | N/A | UNIT 3 | Right-of-Way (ROW) | KE&G will be preforming milling and paving operations in the Barrio Nopal and Elvira neighborhoods including concrete sidewalk and ADA ramps. |
| TR-ROW-1223-01487 | Void | 12/29/2023 | N/A | UNIT 3101 | Right-of-Way (ROW) | KE&G will be preforming milling and paving operations in the Barrio Nopal and Elvira neighborhoods including concrete sidewalk and ADA ramps. |
| TR-ROW-1223-01487 | Void | 12/29/2023 | N/A | UNIT 3102 | Right-of-Way (ROW) | KE&G will be preforming milling and paving operations in the Barrio Nopal and Elvira neighborhoods including concrete sidewalk and ADA ramps. |
| TR-ROW-1223-01487 | Void | 12/29/2023 | N/A | UNIT 4 | Right-of-Way (ROW) | KE&G will be preforming milling and paving operations in the Barrio Nopal and Elvira neighborhoods including concrete sidewalk and ADA ramps. |
| TR-ROW-1223-01487 | Void | 12/29/2023 | N/A | UNIT 5 | Right-of-Way (ROW) | KE&G will be preforming milling and paving operations in the Barrio Nopal and Elvira neighborhoods including concrete sidewalk and ADA ramps. |
| TR-ROW-1223-01487 | Void | 12/29/2023 | N/A | UNIT 6 | Right-of-Way (ROW) | KE&G will be preforming milling and paving operations in the Barrio Nopal and Elvira neighborhoods including concrete sidewalk and ADA ramps. |
| TR-ROW-1223-01487 | Void | 12/29/2023 | N/A | UNIT 7 | Right-of-Way (ROW) | KE&G will be preforming milling and paving operations in the Barrio Nopal and Elvira neighborhoods including concrete sidewalk and ADA ramps. |
| TR-ROW-1223-01487 | Void | 12/29/2023 | N/A | UNIT 8 | Right-of-Way (ROW) | KE&G will be preforming milling and paving operations in the Barrio Nopal and Elvira neighborhoods including concrete sidewalk and ADA ramps. |
| TR-ROW-1223-01487 | Void | 12/29/2023 | N/A | UNIT 9 | Right-of-Way (ROW) | KE&G will be preforming milling and paving operations in the Barrio Nopal and Elvira neighborhoods including concrete sidewalk and ADA ramps. |
| TR-ROW-1223-01487 | Void | 12/29/2023 | N/A | UNIT M1 | Right-of-Way (ROW) | KE&G will be preforming milling and paving operations in the Barrio Nopal and Elvira neighborhoods including concrete sidewalk and ADA ramps. |
| TR-ROW-1223-01487 | Void | 12/29/2023 | N/A | UNIT M2 | Right-of-Way (ROW) | KE&G will be preforming milling and paving operations in the Barrio Nopal and Elvira neighborhoods including concrete sidewalk and ADA ramps. |
| T00CM00972 | Expired | 02/29/2000 | 08/27/2000 | COMBO | REPAIR:GENERAL T00VL00245 | |
| T10EL01523 | Final | 06/24/2010 | 01/25/2011 | ELECT | RECONNECT; ELECTRIC | |
| T10EL01524 | Final | 06/24/2010 | 03/23/2011 | ELECT | RECONNECT; ELECTRIC | |
| T16CM09335 | Expired | 12/14/2016 | 11/07/2018 | COMBO | ELECTRICAL REWIRING OF KITCHEN, REPAIR FIRE DAMAGE |
Code Enforcement
Parcel Number - 13817024A
Date - 12/19/2025 11:46 p.m.
Total Number Of Code Cases - 4
| Case Number | Case Status | Entered Date | Closed Date | Unit | Type | Description |
|---|---|---|---|---|---|---|
| T00VL00245 | Closed | 02/29/2000 | N/A | CODEVIOL | COMPLAINT:EMERGENCY CALLOUT - VEH INTO HOUSE | |
| T08DV08629 | Noverify | 09/16/2008 | N/A | DNR_VIOL | VACANT AND UNSECURE | |
| T11DV01748 | Cancel | 03/21/2011 | N/A | DNR_VIOL | NEW OWNERS OF APT BLDG ARE REPLACING CARPETING AND LEAVING THE OLD CARPETING IN FRONT OF BUILDING AND IN THE ROW (SIDEWALK). | |
| T16DV00696 | Complian | 02/09/2016 | N/A | DNR_VIOL | Fire |