Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

PRO is currently experiencing an outage. Some documents and records may not be available on PRO momentarily. We apologize for the inconvenience and are working to restore full access.

Parcel Search
 
Parcel Attributes
Parcel138151320
JurisdictionTucson, Pima County
City of Tucson ZoningR-2
Tucson WardWard 1
Tucson Registered NeighborhoodBarrio Nopal
Pima County Data Assessor, Recorder, Treasurer, ...
Parcel Map Map
Address
Parcel Attributes Issue?

Annexations & Original City Zoning (OCZ)

Date - 09/08/2026 3:03 p.m.
Total Number Of OZC Plans - (1)
Plan Description Annexation Ordinance Effective Date OCZ Ordinance
C9-60-39 West To Silverbell Road And South To San Xavier Indian Reservation 2014 03/18/1960 2045

Rezoning Cases

Date - 09/08/2026 3:03 p.m.
Total Number Of Rezone Cases - (1)
Case No. Description New Zone Status Status Date Address
C9-82-07 Conway - 6th Street P-I Expired 08/31/2010 105 E DESERT MANOR

Permits

Parcel Number - 138151320
Date - 09/08/2026 3:03 p.m.
Total Number Of Permits - (47)
Permit Permit Status Entered Date Expired Date Unit Type Description
TR-ROW-1223-01487 Void 12/29/2023 N/A Right-of-Way (ROW) KE&G will be preforming milling and paving operations in the Barrio Nopal and Elvira neighborhoods including concrete sidewalk and ADA ramps.
TR-ROW-1223-01487 Void 12/29/2023 N/A BLDG 1 Right-of-Way (ROW) KE&G will be preforming milling and paving operations in the Barrio Nopal and Elvira neighborhoods including concrete sidewalk and ADA ramps.
TR-ROW-1223-01487 Void 12/29/2023 N/A BLDG 1 UNIT 1 Right-of-Way (ROW) KE&G will be preforming milling and paving operations in the Barrio Nopal and Elvira neighborhoods including concrete sidewalk and ADA ramps.
TR-ROW-1223-01487 Void 12/29/2023 N/A BLDG 1 UNIT 2 Right-of-Way (ROW) KE&G will be preforming milling and paving operations in the Barrio Nopal and Elvira neighborhoods including concrete sidewalk and ADA ramps.
TR-ROW-1223-01487 Void 12/29/2023 N/A BLDG 2 Right-of-Way (ROW) KE&G will be preforming milling and paving operations in the Barrio Nopal and Elvira neighborhoods including concrete sidewalk and ADA ramps.
TR-ROW-1223-01487 Void 12/29/2023 N/A BLDG 2 UNIT 1 Right-of-Way (ROW) KE&G will be preforming milling and paving operations in the Barrio Nopal and Elvira neighborhoods including concrete sidewalk and ADA ramps.
TR-ROW-1223-01487 Void 12/29/2023 N/A BLDG 2 UNIT 2 Right-of-Way (ROW) KE&G will be preforming milling and paving operations in the Barrio Nopal and Elvira neighborhoods including concrete sidewalk and ADA ramps.
TR-ROW-1223-01487 Void 12/29/2023 N/A BLDG 3 Right-of-Way (ROW) KE&G will be preforming milling and paving operations in the Barrio Nopal and Elvira neighborhoods including concrete sidewalk and ADA ramps.
TR-ROW-1223-01487 Void 12/29/2023 N/A BLDG 3 UNIT 1 Right-of-Way (ROW) KE&G will be preforming milling and paving operations in the Barrio Nopal and Elvira neighborhoods including concrete sidewalk and ADA ramps.
TR-ROW-1223-01487 Void 12/29/2023 N/A BLDG 3 UNIT 2 Right-of-Way (ROW) KE&G will be preforming milling and paving operations in the Barrio Nopal and Elvira neighborhoods including concrete sidewalk and ADA ramps.
TR-ROW-1223-01487 Void 12/29/2023 N/A BLDG 4 Right-of-Way (ROW) KE&G will be preforming milling and paving operations in the Barrio Nopal and Elvira neighborhoods including concrete sidewalk and ADA ramps.
TR-ROW-1223-01487 Void 12/29/2023 N/A BLDG 4 UNIT 1 Right-of-Way (ROW) KE&G will be preforming milling and paving operations in the Barrio Nopal and Elvira neighborhoods including concrete sidewalk and ADA ramps.
TR-ROW-1223-01487 Void 12/29/2023 N/A BLDG 4 UNIT 2 Right-of-Way (ROW) KE&G will be preforming milling and paving operations in the Barrio Nopal and Elvira neighborhoods including concrete sidewalk and ADA ramps.
TR-ROW-1223-01487 Void 12/29/2023 N/A BLDG 5 Right-of-Way (ROW) KE&G will be preforming milling and paving operations in the Barrio Nopal and Elvira neighborhoods including concrete sidewalk and ADA ramps.
TR-ROW-1223-01487 Void 12/29/2023 N/A BLDG 6 Right-of-Way (ROW) KE&G will be preforming milling and paving operations in the Barrio Nopal and Elvira neighborhoods including concrete sidewalk and ADA ramps.
TR-ROW-1223-01487 Void 12/29/2023 N/A BLDG 7 Right-of-Way (ROW) KE&G will be preforming milling and paving operations in the Barrio Nopal and Elvira neighborhoods including concrete sidewalk and ADA ramps.
TR-ROW-1223-01487 Void 12/29/2023 N/A UNIT 1 Right-of-Way (ROW) KE&G will be preforming milling and paving operations in the Barrio Nopal and Elvira neighborhoods including concrete sidewalk and ADA ramps.
TR-ROW-1223-01487 Void 12/29/2023 N/A UNIT 10 Right-of-Way (ROW) KE&G will be preforming milling and paving operations in the Barrio Nopal and Elvira neighborhoods including concrete sidewalk and ADA ramps.
TR-ROW-1223-01487 Void 12/29/2023 N/A UNIT 11 Right-of-Way (ROW) KE&G will be preforming milling and paving operations in the Barrio Nopal and Elvira neighborhoods including concrete sidewalk and ADA ramps.
TR-ROW-1223-01487 Void 12/29/2023 N/A UNIT 12 Right-of-Way (ROW) KE&G will be preforming milling and paving operations in the Barrio Nopal and Elvira neighborhoods including concrete sidewalk and ADA ramps.
TR-ROW-1223-01487 Void 12/29/2023 N/A UNIT 13 Right-of-Way (ROW) KE&G will be preforming milling and paving operations in the Barrio Nopal and Elvira neighborhoods including concrete sidewalk and ADA ramps.
TR-ROW-1223-01487 Void 12/29/2023 N/A UNIT 14 Right-of-Way (ROW) KE&G will be preforming milling and paving operations in the Barrio Nopal and Elvira neighborhoods including concrete sidewalk and ADA ramps.
TR-ROW-1223-01487 Void 12/29/2023 N/A UNIT 15 Right-of-Way (ROW) KE&G will be preforming milling and paving operations in the Barrio Nopal and Elvira neighborhoods including concrete sidewalk and ADA ramps.
TR-ROW-1223-01487 Void 12/29/2023 N/A UNIT 16 Right-of-Way (ROW) KE&G will be preforming milling and paving operations in the Barrio Nopal and Elvira neighborhoods including concrete sidewalk and ADA ramps.
TR-ROW-1223-01487 Void 12/29/2023 N/A UNIT 17 Right-of-Way (ROW) KE&G will be preforming milling and paving operations in the Barrio Nopal and Elvira neighborhoods including concrete sidewalk and ADA ramps.
TR-ROW-1223-01487 Void 12/29/2023 N/A UNIT 18 Right-of-Way (ROW) KE&G will be preforming milling and paving operations in the Barrio Nopal and Elvira neighborhoods including concrete sidewalk and ADA ramps.
TR-ROW-1223-01487 Void 12/29/2023 N/A UNIT 19 Right-of-Way (ROW) KE&G will be preforming milling and paving operations in the Barrio Nopal and Elvira neighborhoods including concrete sidewalk and ADA ramps.
TR-ROW-1223-01487 Void 12/29/2023 N/A UNIT 19A Right-of-Way (ROW) KE&G will be preforming milling and paving operations in the Barrio Nopal and Elvira neighborhoods including concrete sidewalk and ADA ramps.
TR-ROW-1223-01487 Void 12/29/2023 N/A UNIT 19B Right-of-Way (ROW) KE&G will be preforming milling and paving operations in the Barrio Nopal and Elvira neighborhoods including concrete sidewalk and ADA ramps.
TR-ROW-1223-01487 Void 12/29/2023 N/A UNIT 19C Right-of-Way (ROW) KE&G will be preforming milling and paving operations in the Barrio Nopal and Elvira neighborhoods including concrete sidewalk and ADA ramps.
TR-ROW-1223-01487 Void 12/29/2023 N/A UNIT 2 Right-of-Way (ROW) KE&G will be preforming milling and paving operations in the Barrio Nopal and Elvira neighborhoods including concrete sidewalk and ADA ramps.
TR-ROW-1223-01487 Void 12/29/2023 N/A UNIT 2101 Right-of-Way (ROW) KE&G will be preforming milling and paving operations in the Barrio Nopal and Elvira neighborhoods including concrete sidewalk and ADA ramps.
TR-ROW-1223-01487 Void 12/29/2023 N/A UNIT 2104 Right-of-Way (ROW) KE&G will be preforming milling and paving operations in the Barrio Nopal and Elvira neighborhoods including concrete sidewalk and ADA ramps.
TR-ROW-1223-01487 Void 12/29/2023 N/A UNIT 3 Right-of-Way (ROW) KE&G will be preforming milling and paving operations in the Barrio Nopal and Elvira neighborhoods including concrete sidewalk and ADA ramps.
TR-ROW-1223-01487 Void 12/29/2023 N/A UNIT 3101 Right-of-Way (ROW) KE&G will be preforming milling and paving operations in the Barrio Nopal and Elvira neighborhoods including concrete sidewalk and ADA ramps.
TR-ROW-1223-01487 Void 12/29/2023 N/A UNIT 3102 Right-of-Way (ROW) KE&G will be preforming milling and paving operations in the Barrio Nopal and Elvira neighborhoods including concrete sidewalk and ADA ramps.
TR-ROW-1223-01487 Void 12/29/2023 N/A UNIT 4 Right-of-Way (ROW) KE&G will be preforming milling and paving operations in the Barrio Nopal and Elvira neighborhoods including concrete sidewalk and ADA ramps.
TR-ROW-1223-01487 Void 12/29/2023 N/A UNIT 5 Right-of-Way (ROW) KE&G will be preforming milling and paving operations in the Barrio Nopal and Elvira neighborhoods including concrete sidewalk and ADA ramps.
TR-ROW-1223-01487 Void 12/29/2023 N/A UNIT 6 Right-of-Way (ROW) KE&G will be preforming milling and paving operations in the Barrio Nopal and Elvira neighborhoods including concrete sidewalk and ADA ramps.
TR-ROW-1223-01487 Void 12/29/2023 N/A UNIT 7 Right-of-Way (ROW) KE&G will be preforming milling and paving operations in the Barrio Nopal and Elvira neighborhoods including concrete sidewalk and ADA ramps.
TR-ROW-1223-01487 Void 12/29/2023 N/A UNIT 8 Right-of-Way (ROW) KE&G will be preforming milling and paving operations in the Barrio Nopal and Elvira neighborhoods including concrete sidewalk and ADA ramps.
TR-ROW-1223-01487 Void 12/29/2023 N/A UNIT 9 Right-of-Way (ROW) KE&G will be preforming milling and paving operations in the Barrio Nopal and Elvira neighborhoods including concrete sidewalk and ADA ramps.
TR-ROW-1223-01487 Void 12/29/2023 N/A UNIT M1 Right-of-Way (ROW) KE&G will be preforming milling and paving operations in the Barrio Nopal and Elvira neighborhoods including concrete sidewalk and ADA ramps.
TR-ROW-1223-01487 Void 12/29/2023 N/A UNIT M2 Right-of-Way (ROW) KE&G will be preforming milling and paving operations in the Barrio Nopal and Elvira neighborhoods including concrete sidewalk and ADA ramps.
T21CM02938 Final 04/06/2021 05/16/2022 COMBO SFR LTR1383130 T20-M0052
T21RW04360 Final 09/22/2021 10/22/2021 ROW DRIVEWAY / SIDEWALK APRON @ 40 LF LA TIERRA RESERVE - LOT 28
T22CM00623 Final 01/26/2022 10/16/2022 COMBO Installation of a roof mounted 9.085kW PV System

Code Enforcement

Parcel Number - 138151320
Date - 09/08/2026 3:03 p.m.
Total Number Of Code Cases - 2
Case Number Case Status Entered Date Closed Date Unit Type Description
CE-VIO0826-03357 Notice of violation 08/13/2026 N/A Code Enforcement Case RWOP/ ac installed no permits
CE-VIO0326-01101 Closed - unfounded 03/06/2026 03/10/2026 Code Enforcement Case WASTE: Excessive dog waste in the back yard