Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Parcel Search

 
Parcel Attributes
Parcel13813044B
JurisdictionTucson
City of Tucson ZoningR-2
Airport Environs Zone

Tucson International AEZ Paddle

Tucson WardWard 5
Tucson Registered NeighborhoodSunnyside
Major Streets & Routes

Arterial or Collector

Pima County Data Assessor, Recorder, Treasurer, ...
Parcel Map Map
Address

Annexations & Original City Zoning (OCZ)

Date - 12/23/2024 7:02 a.m.
Total Number Of OZC Plans - (1)
Plan Description Annexation Ordinance Effective Date OCZ Ordinance
C9-60-39 West To Silverbell Road And South To San Xavier Indian Reservation 2014 03/18/1960 2045

Rezoning Cases

Date - 12/23/2024 7:02 a.m.
Total Number Of Rezone Cases - (1)
Case No. Description New Zone Status Status Date Address
C9-71-10 Estes - Bilby Road R-2 Effectuated 09/21/2011 W BILBY

Permits

Parcel Number - 13813044B
Date - 12/23/2024 7:02 a.m.
Total Number Of Permits - (553)
Permit Permit Status Entered Date Expired Date Unit Type Description
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 0 UNIT 1 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 0 UNIT 2 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 0 UNIT 3 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 0 UNIT 4 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 1 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 1 UNIT 1101 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 1 UNIT 1102 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 1 UNIT 1103 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 1 UNIT 1104 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 1 UNIT 1105 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 1 UNIT 1106 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 1 UNIT 1107 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 1 UNIT 1108 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 1 UNIT 1201 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 1 UNIT 1202 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 1 UNIT 1203 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 1 UNIT 1204 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 1 UNIT 1205 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 1 UNIT 1206 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 1 UNIT 1207 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 1 UNIT 1208 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 1 UNIT 1301 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 1 UNIT 1302 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 1 UNIT 1303 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 1 UNIT 1304 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 1 UNIT 1305 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 1 UNIT 1306 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 1 UNIT 1307 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 1 UNIT 1308 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 10 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 10 UNIT 10101 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 10 UNIT 10102 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 10 UNIT 10103 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 10 UNIT 10104 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 100 UNIT 150 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 100 UNIT 170 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 11 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 11 UNIT 11101 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 11 UNIT 11102 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 11 UNIT 11103 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 11 UNIT 11104 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 11 UNIT 11105 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 11 UNIT 11106 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 11 UNIT 11107 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 11 UNIT 11108 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 11 UNIT 11201 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 11 UNIT 11202 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 11 UNIT 11203 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 11 UNIT 11204 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 11 UNIT 11205 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 11 UNIT 11206 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 11 UNIT 11207 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 11 UNIT 11208 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 11 UNIT 11301 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 11 UNIT 11302 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 11 UNIT 11303 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 11 UNIT 11304 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 11 UNIT 11305 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 11 UNIT 11306 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 11 UNIT 11307 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 11 UNIT 11308 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 12 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 12 UNIT 12101 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 12 UNIT 12102 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 12 UNIT 12103 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 12 UNIT 12104 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 12 UNIT 12105 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 12 UNIT 12106 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 12 UNIT 12107 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 12 UNIT 12108 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 12 UNIT 12201 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 12 UNIT 12202 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 12 UNIT 12203 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 12 UNIT 12204 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 12 UNIT 12205 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 12 UNIT 12206 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 12 UNIT 12207 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 12 UNIT 12208 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 12 UNIT 12301 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 12 UNIT 12302 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 12 UNIT 12303 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 12 UNIT 12304 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 12 UNIT 12305 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 12 UNIT 12306 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 12 UNIT 12307 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 12 UNIT 12308 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 13 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 13 UNIT 13101 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 13 UNIT 13102 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 13 UNIT 13103 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 13 UNIT 13104 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 13 UNIT 13105 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 13 UNIT 13106 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 13 UNIT 13107 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 13 UNIT 13108 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 13 UNIT 13201 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 13 UNIT 13202 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 13 UNIT 13203 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 13 UNIT 13204 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 13 UNIT 13205 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 13 UNIT 13206 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 13 UNIT 13207 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 13 UNIT 13208 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 13 UNIT 13301 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 13 UNIT 13302 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 13 UNIT 13303 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 13 UNIT 13304 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 13 UNIT 13305 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 13 UNIT 13306 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 13 UNIT 13307 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 13 UNIT 13308 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 14 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 14 UNIT 14101 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 14 UNIT 14102 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 14 UNIT 14103 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 14 UNIT 14104 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 15 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 15 UNIT 15101 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 15 UNIT 15102 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 15 UNIT 15103 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 15 UNIT 15104 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 16 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 16 UNIT 16101 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 16 UNIT 16102 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 16 UNIT 16103 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 16 UNIT 16104 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 17 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 17 UNIT 17101 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 17 UNIT 17102 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 17 UNIT 17103 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 17 UNIT 17104 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 18 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 18 UNIT 18101 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 18 UNIT 18102 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 18 UNIT 18103 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 18 UNIT 18104 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 19 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 19 UNIT 19101 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 19 UNIT 19102 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 19 UNIT 19103 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 19 UNIT 19104 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 2 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 2 UNIT 2101 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 2 UNIT 2102 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 2 UNIT 2103 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 2 UNIT 2104 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 2 UNIT 2105 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 2 UNIT 2106 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 2 UNIT 2107 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 2 UNIT 2108 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 2 UNIT 2201 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 2 UNIT 2202 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 2 UNIT 2203 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 2 UNIT 2204 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 2 UNIT 2205 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 2 UNIT 2206 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 2 UNIT 2207 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 2 UNIT 2208 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 2 UNIT 2301 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 2 UNIT 2302 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 2 UNIT 2303 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 2 UNIT 2304 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 2 UNIT 2305 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 2 UNIT 2306 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 2 UNIT 2307 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 2 UNIT 2308 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 20 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 20 UNIT 20101 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 20 UNIT 20102 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 20 UNIT 20103 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 20 UNIT 20104 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 200 UNIT 240 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 21 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 21 UNIT 21101 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 21 UNIT 21102 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 21 UNIT 21103 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 21 UNIT 21104 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 22 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 22 UNIT 22101 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 22 UNIT 22102 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 22 UNIT 22103 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 22 UNIT 22104 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 23 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 23 UNIT 23101 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 23 UNIT 23102 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 23 UNIT 23103 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 23 UNIT 23104 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 24 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 24 UNIT 24101 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 24 UNIT 24102 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 24 UNIT 24103 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 24 UNIT 24104 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 25 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 25 UNIT 25101 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 25 UNIT 25102 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 25 UNIT 25103 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 25 UNIT 25104 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 26 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 26 UNIT 26101 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 26 UNIT 26102 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 26 UNIT 26103 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 26 UNIT 26104 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 27 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 27 UNIT 27101 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 27 UNIT 27102 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 27 UNIT 27103 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 27 UNIT 27104 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 28 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 28 UNIT 28101 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 28 UNIT 28102 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 28 UNIT 28103 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 28 UNIT 28104 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 29 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 29 UNIT 29101 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 29 UNIT 29102 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 29 UNIT 29103 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 29 UNIT 29104 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 3 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 3 UNIT 3101 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 3 UNIT 3102 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 3 UNIT 3103 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 3 UNIT 3104 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 3 UNIT 3105 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 3 UNIT 3106 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 3 UNIT 3107 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 3 UNIT 3108 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 3 UNIT 3201 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 3 UNIT 3202 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 3 UNIT 3203 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 3 UNIT 3204 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 3 UNIT 3205 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 3 UNIT 3206 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 3 UNIT 3207 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 3 UNIT 3208 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 3 UNIT 3301 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 3 UNIT 3302 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 3 UNIT 3303 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 3 UNIT 3304 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 3 UNIT 3305 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 3 UNIT 3306 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 3 UNIT 3307 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 3 UNIT 3308 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 30 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 30 UNIT 30101 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 30 UNIT 30102 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 30 UNIT 30103 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 30 UNIT 30104 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 31 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 31 UNIT 31101 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 31 UNIT 31102 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 31 UNIT 31103 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 31 UNIT 31104 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 32 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 32 UNIT 32101 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 32 UNIT 32102 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 32 UNIT 32103 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 32 UNIT 32104 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 33 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 33 UNIT 33101 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 33 UNIT 33102 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 33 UNIT 33103 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 33 UNIT 33104 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 34 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 34 UNIT 34101 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 34 UNIT 34102 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 34 UNIT 34103 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 34 UNIT 34104 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 35 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 35 UNIT 35101 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 35 UNIT 35102 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 35 UNIT 35103 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 35 UNIT 35104 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 36 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 36 UNIT 36101 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 36 UNIT 36102 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 36 UNIT 36103 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 36 UNIT 36104 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 37 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 37 UNIT 37101 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 37 UNIT 37102 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 37 UNIT 37103 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 37 UNIT 37104 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 38 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 38 UNIT 38101 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 38 UNIT 38102 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 38 UNIT 38103 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 38 UNIT 38104 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 39 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 4 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 4 UNIT 4101 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 4 UNIT 4102 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 4 UNIT 4103 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 4 UNIT 4104 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 4 UNIT 4105 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 4 UNIT 4106 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 4 UNIT 4107 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 4 UNIT 4108 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 4 UNIT 4201 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 4 UNIT 4202 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 4 UNIT 4203 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 4 UNIT 4204 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 4 UNIT 4205 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 4 UNIT 4206 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 4 UNIT 4207 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 4 UNIT 4208 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 4 UNIT 4301 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 4 UNIT 4302 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 4 UNIT 4303 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 4 UNIT 4304 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 4 UNIT 4305 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 4 UNIT 4306 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 4 UNIT 4307 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 4 UNIT 4308 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 5 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 5 UNIT 5101 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 5 UNIT 5102 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 5 UNIT 5103 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 5 UNIT 5104 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 5 UNIT 5105 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 5 UNIT 5106 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 5 UNIT 5107 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 5 UNIT 5108 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 5 UNIT 5201 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 5 UNIT 5202 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 5 UNIT 5203 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 5 UNIT 5204 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 5 UNIT 5205 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 5 UNIT 5206 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 5 UNIT 5207 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 5 UNIT 5208 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 5 UNIT 5301 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 5 UNIT 5302 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 5 UNIT 5303 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 5 UNIT 5304 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 5 UNIT 5305 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 5 UNIT 5306 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 5 UNIT 5307 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 5 UNIT 5308 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 6 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 6 UNIT 6101 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 6 UNIT 6102 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 6 UNIT 6103 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 6 UNIT 6104 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 6 UNIT 6105 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 6 UNIT 6106 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 6 UNIT 6107 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 6 UNIT 6108 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 6 UNIT 6201 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 6 UNIT 6202 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 6 UNIT 6203 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 6 UNIT 6204 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 6 UNIT 6205 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 6 UNIT 6206 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 6 UNIT 6207 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 6 UNIT 6208 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 6 UNIT 6301 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 6 UNIT 6302 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 6 UNIT 6303 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 6 UNIT 6304 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 6 UNIT 6305 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 6 UNIT 6306 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 6 UNIT 6307 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 6 UNIT 6308 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 7 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 7 UNIT 7101 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 7 UNIT 7102 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 7 UNIT 7103 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 7 UNIT 7104 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 7 UNIT 7105 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 7 UNIT 7106 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 7 UNIT 7107 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 7 UNIT 7108 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 7 UNIT 7201 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 7 UNIT 7202 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 7 UNIT 7203 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 7 UNIT 7204 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 7 UNIT 7205 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 7 UNIT 7206 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 7 UNIT 7207 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 7 UNIT 7208 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 7 UNIT 7301 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 7 UNIT 7302 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 7 UNIT 7303 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 7 UNIT 7304 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 7 UNIT 7305 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 7 UNIT 7306 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 7 UNIT 7307 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 7 UNIT 7308 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 8 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 8 UNIT 8101 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 8 UNIT 8102 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 8 UNIT 8103 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 8 UNIT 8104 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 8 UNIT 8105 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 8 UNIT 8106 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 8 UNIT 8107 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 8 UNIT 8108 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 8 UNIT 8201 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 8 UNIT 8202 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 8 UNIT 8203 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 8 UNIT 8204 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 8 UNIT 8205 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 8 UNIT 8206 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 8 UNIT 8207 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 8 UNIT 8208 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 8 UNIT 8301 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 8 UNIT 8302 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 8 UNIT 8303 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 8 UNIT 8304 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 8 UNIT 8305 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 8 UNIT 8306 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 8 UNIT 8307 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 8 UNIT 8308 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 9 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 9 UNIT 10101 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 9 UNIT 10102 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 9 UNIT 10103 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 9 UNIT 10104 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 9 UNIT 10105 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 9 UNIT 10106 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 9 UNIT 10107 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 9 UNIT 10108 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 9 UNIT 10201 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 9 UNIT 10202 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 9 UNIT 10203 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 9 UNIT 10204 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 9 UNIT 10205 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 9 UNIT 10206 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 9 UNIT 10207 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 9 UNIT 10208 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 9 UNIT 10301 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 9 UNIT 10302 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 9 UNIT 10303 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 9 UNIT 10304 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 9 UNIT 10305 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 9 UNIT 10306 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 9 UNIT 10307 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 9 UNIT 10308 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 9 UNIT 9101 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 9 UNIT 9102 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 9 UNIT 9103 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 9 UNIT 9104 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 9 UNIT 9105 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 9 UNIT 9106 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 9 UNIT 9107 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 9 UNIT 9108 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 9 UNIT 9201 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 9 UNIT 9202 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 9 UNIT 9203 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 9 UNIT 9204 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 9 UNIT 9205 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 9 UNIT 9206 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 9 UNIT 9207 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 9 UNIT 9208 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 9 UNIT 9301 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 9 UNIT 9302 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 9 UNIT 9303 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 9 UNIT 9304 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 9 UNIT 9305 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 9 UNIT 9306 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 9 UNIT 9307 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 9 UNIT 9308 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG A Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG B Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG C Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG C UNIT 300 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 UNIT 1 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 UNIT 10 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 UNIT 100 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 UNIT 11 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 UNIT 110 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 UNIT 12 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 UNIT 13 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 UNIT 14 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 UNIT 15 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 UNIT 150 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 UNIT 15A Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 UNIT 16 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 UNIT 16A Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 UNIT 16B Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 UNIT 17 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 UNIT 18 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 UNIT 180 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 UNIT 19 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 UNIT 2 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 UNIT 20 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 UNIT 21 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 UNIT 22 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 UNIT 23 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 UNIT 24 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 UNIT 25 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 UNIT 26 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 UNIT 27 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 UNIT 28 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 UNIT 29 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 UNIT 3 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 UNIT 31 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 UNIT 32 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 UNIT 33 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 UNIT 34 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 UNIT 35 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 UNIT 36 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 UNIT 38 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 UNIT 39 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 UNIT 4 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 UNIT 40 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 UNIT 41 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 UNIT 42 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 UNIT 43 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 UNIT 44 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 UNIT 45 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 UNIT 46 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 UNIT 47 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 UNIT 48 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 UNIT 49 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 UNIT 5 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 UNIT 51 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 UNIT 52 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 UNIT 53 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 UNIT 54 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 UNIT 56 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 UNIT 6 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 UNIT 7 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 UNIT 8 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 UNIT 9 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 UNIT A Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 UNIT B Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 UNIT C Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 UNIT D Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 UNIT E Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 UNIT F Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 UNIT G Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 UNIT H Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 UNIT I Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 UNIT J Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 UNIT K Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 UNIT L Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 UNIT M Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 UNIT N Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 UNIT O Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 UNIT P Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 UNIT Q Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 UNIT R Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 UNIT S Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 UNIT T Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 UNIT U Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 UNIT V Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 UNIT W Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 UNIT X Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 UNIT Y Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
T09CM03247 Final 12/10/2009 06/28/2010 COMBO 1 HOUR FIRE WALL:CODE COMPLIANCE
T11CM00228 Withdrwn 01/27/2011 N/A COMBO TAA SOUND INSULATION PROGRAM

Code Enforcement

Parcel Number - 13813044B
Date - 12/23/2024 7:02 a.m.
Total Number Of Code Cases - 2
Case Number Case Status Entered Date Closed Date Unit Type Description
T09DV02319 Complian 04/29/2009 N/A DNR_VIOL OVERGROWN WEEDS AND TRASH/DEBRIS IN ALLEY
T19DV05895 Complian 07/20/2019 08/10/2019 DNR_VIOL WEEDS REFUSE ALLEY