Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Parcel Search

 
Parcel Attributes
Parcel138090160
JurisdictionTucson
City of Tucson ZoningI-1, R-2
Water Course

Washes

Airport Environs Zone

Tucson International AEZ Paddle

Tucson WardWard 5
Flood Related Information

FEMA Floodplain Area

Tucson Registered NeighborhoodSunnyside
Major Streets & Routes

Arterial or Collector

,

Gateway Route

,

Intersection Buffer

Pima County Data Assessor, Recorder, Treasurer, ...
Parcel Map Map
Address

Annexations & Original City Zoning (OCZ)

Date - 11/13/2024 4:14 a.m.
Total Number Of OZC Plans - (1)
Plan Description Annexation Ordinance Effective Date OCZ Ordinance
C9-60-39 West To Silverbell Road And South To San Xavier Indian Reservation 2014 03/18/1960 2045

Permits

Parcel Number - 138090160
Date - 11/13/2024 4:14 a.m.
Total Number Of Permits - (562)
Permit Permit Status Entered Date Expired Date Unit Type Description
T22RW00775 In review 03/04/2022 01/11/2023 Right-of-Way (ROW) WO# 6620794 TEP will be working in ROW to complete installation of new underground(UG) facilities which include conductor and an UG transformer in contractor provided UG duct@ 295LF. TCP will be required. ; Work Order: 6620794 ** PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING. ** PAVEMENT PATCH TYPE SHALL BE IN CONFORMANCE TO THE CURRENT EDITION OF THE CITY OF TUCSON PUBLIC UTILITY ADMINISTRATIVE MANUAL.
T21CM02101 Complete 03/09/2021 07/05/2023 Commercial Building Add T-Mobile antennas and equipment to existing cell tower. Add equipment in ground space. This is f
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 0 UNIT 1 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 0 UNIT 2 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 0 UNIT 3 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 0 UNIT 4 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 1 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 1 UNIT 1101 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 1 UNIT 1102 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 1 UNIT 1103 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 1 UNIT 1104 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 1 UNIT 1105 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 1 UNIT 1106 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 1 UNIT 1107 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 1 UNIT 1108 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 1 UNIT 1201 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 1 UNIT 1202 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 1 UNIT 1203 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 1 UNIT 1204 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 1 UNIT 1205 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 1 UNIT 1206 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 1 UNIT 1207 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 1 UNIT 1208 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 1 UNIT 1301 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 1 UNIT 1302 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 1 UNIT 1303 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 1 UNIT 1304 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 1 UNIT 1305 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 1 UNIT 1306 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 1 UNIT 1307 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 1 UNIT 1308 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 10 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 10 UNIT 10101 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 10 UNIT 10102 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 10 UNIT 10103 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 10 UNIT 10104 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 100 UNIT 150 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 100 UNIT 170 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 11 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 11 UNIT 11101 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 11 UNIT 11102 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 11 UNIT 11103 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 11 UNIT 11104 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 11 UNIT 11105 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 11 UNIT 11106 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 11 UNIT 11107 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 11 UNIT 11108 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 11 UNIT 11201 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 11 UNIT 11202 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 11 UNIT 11203 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 11 UNIT 11204 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 11 UNIT 11205 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 11 UNIT 11206 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 11 UNIT 11207 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 11 UNIT 11208 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 11 UNIT 11301 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 11 UNIT 11302 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 11 UNIT 11303 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 11 UNIT 11304 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 11 UNIT 11305 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 11 UNIT 11306 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 11 UNIT 11307 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 11 UNIT 11308 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 12 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 12 UNIT 12101 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 12 UNIT 12102 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 12 UNIT 12103 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 12 UNIT 12104 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 12 UNIT 12105 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 12 UNIT 12106 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 12 UNIT 12107 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 12 UNIT 12108 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 12 UNIT 12201 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 12 UNIT 12202 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 12 UNIT 12203 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 12 UNIT 12204 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 12 UNIT 12205 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 12 UNIT 12206 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 12 UNIT 12207 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 12 UNIT 12208 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 12 UNIT 12301 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 12 UNIT 12302 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 12 UNIT 12303 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 12 UNIT 12304 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 12 UNIT 12305 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 12 UNIT 12306 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 12 UNIT 12307 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 12 UNIT 12308 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 13 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 13 UNIT 13101 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 13 UNIT 13102 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 13 UNIT 13103 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 13 UNIT 13104 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 13 UNIT 13105 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 13 UNIT 13106 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 13 UNIT 13107 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 13 UNIT 13108 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 13 UNIT 13201 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 13 UNIT 13202 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 13 UNIT 13203 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 13 UNIT 13204 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 13 UNIT 13205 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 13 UNIT 13206 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 13 UNIT 13207 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 13 UNIT 13208 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 13 UNIT 13301 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 13 UNIT 13302 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 13 UNIT 13303 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 13 UNIT 13304 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 13 UNIT 13305 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 13 UNIT 13306 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 13 UNIT 13307 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 13 UNIT 13308 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 14 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 14 UNIT 14101 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 14 UNIT 14102 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 14 UNIT 14103 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 14 UNIT 14104 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 15 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 15 UNIT 15101 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 15 UNIT 15102 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 15 UNIT 15103 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 15 UNIT 15104 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 16 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 16 UNIT 16101 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 16 UNIT 16102 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 16 UNIT 16103 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 16 UNIT 16104 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 17 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 17 UNIT 17101 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 17 UNIT 17102 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 17 UNIT 17103 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 17 UNIT 17104 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 18 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 18 UNIT 18101 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 18 UNIT 18102 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 18 UNIT 18103 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 18 UNIT 18104 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 19 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 19 UNIT 19101 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 19 UNIT 19102 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 19 UNIT 19103 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 19 UNIT 19104 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 2 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 2 UNIT 2101 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 2 UNIT 2102 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 2 UNIT 2103 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 2 UNIT 2104 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 2 UNIT 2105 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 2 UNIT 2106 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 2 UNIT 2107 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 2 UNIT 2108 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 2 UNIT 2201 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 2 UNIT 2202 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 2 UNIT 2203 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 2 UNIT 2204 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 2 UNIT 2205 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 2 UNIT 2206 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 2 UNIT 2207 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 2 UNIT 2208 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 2 UNIT 2301 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 2 UNIT 2302 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 2 UNIT 2303 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 2 UNIT 2304 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 2 UNIT 2305 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 2 UNIT 2306 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 2 UNIT 2307 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 2 UNIT 2308 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 20 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 20 UNIT 20101 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 20 UNIT 20102 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 20 UNIT 20103 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 20 UNIT 20104 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 200 UNIT 240 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 21 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 21 UNIT 21101 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 21 UNIT 21102 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 21 UNIT 21103 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 21 UNIT 21104 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 22 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 22 UNIT 22101 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 22 UNIT 22102 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 22 UNIT 22103 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 22 UNIT 22104 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 23 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 23 UNIT 23101 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 23 UNIT 23102 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 23 UNIT 23103 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 23 UNIT 23104 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 24 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 24 UNIT 24101 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 24 UNIT 24102 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 24 UNIT 24103 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 24 UNIT 24104 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 25 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 25 UNIT 25101 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 25 UNIT 25102 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 25 UNIT 25103 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 25 UNIT 25104 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 26 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 26 UNIT 26101 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 26 UNIT 26102 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 26 UNIT 26103 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 26 UNIT 26104 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 27 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 27 UNIT 27101 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 27 UNIT 27102 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 27 UNIT 27103 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 27 UNIT 27104 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 28 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 28 UNIT 28101 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 28 UNIT 28102 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 28 UNIT 28103 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 28 UNIT 28104 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 29 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 29 UNIT 29101 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 29 UNIT 29102 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 29 UNIT 29103 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 29 UNIT 29104 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 3 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 3 UNIT 3101 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 3 UNIT 3102 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 3 UNIT 3103 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 3 UNIT 3104 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 3 UNIT 3105 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 3 UNIT 3106 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 3 UNIT 3107 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 3 UNIT 3108 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 3 UNIT 3201 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 3 UNIT 3202 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 3 UNIT 3203 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 3 UNIT 3204 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 3 UNIT 3205 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 3 UNIT 3206 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 3 UNIT 3207 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 3 UNIT 3208 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 3 UNIT 3301 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 3 UNIT 3302 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 3 UNIT 3303 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 3 UNIT 3304 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 3 UNIT 3305 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 3 UNIT 3306 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 3 UNIT 3307 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 3 UNIT 3308 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 30 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 30 UNIT 30101 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 30 UNIT 30102 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 30 UNIT 30103 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 30 UNIT 30104 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 31 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 31 UNIT 31101 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 31 UNIT 31102 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 31 UNIT 31103 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 31 UNIT 31104 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 32 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 32 UNIT 32101 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 32 UNIT 32102 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 32 UNIT 32103 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 32 UNIT 32104 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 33 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 33 UNIT 33101 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 33 UNIT 33102 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 33 UNIT 33103 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 33 UNIT 33104 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 34 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 34 UNIT 34101 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 34 UNIT 34102 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 34 UNIT 34103 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 34 UNIT 34104 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 35 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 35 UNIT 35101 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 35 UNIT 35102 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 35 UNIT 35103 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 35 UNIT 35104 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 36 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 36 UNIT 36101 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 36 UNIT 36102 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 36 UNIT 36103 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 36 UNIT 36104 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 37 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 37 UNIT 37101 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 37 UNIT 37102 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 37 UNIT 37103 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 37 UNIT 37104 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 38 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 38 UNIT 38101 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 38 UNIT 38102 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 38 UNIT 38103 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 38 UNIT 38104 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 39 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 4 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 4 UNIT 4101 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 4 UNIT 4102 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 4 UNIT 4103 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 4 UNIT 4104 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 4 UNIT 4105 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 4 UNIT 4106 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 4 UNIT 4107 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 4 UNIT 4108 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 4 UNIT 4201 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 4 UNIT 4202 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 4 UNIT 4203 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 4 UNIT 4204 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 4 UNIT 4205 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 4 UNIT 4206 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 4 UNIT 4207 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 4 UNIT 4208 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 4 UNIT 4301 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 4 UNIT 4302 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 4 UNIT 4303 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 4 UNIT 4304 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 4 UNIT 4305 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 4 UNIT 4306 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 4 UNIT 4307 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 4 UNIT 4308 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 5 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 5 UNIT 5101 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 5 UNIT 5102 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 5 UNIT 5103 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 5 UNIT 5104 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 5 UNIT 5105 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 5 UNIT 5106 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 5 UNIT 5107 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 5 UNIT 5108 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 5 UNIT 5201 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 5 UNIT 5202 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 5 UNIT 5203 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 5 UNIT 5204 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 5 UNIT 5205 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 5 UNIT 5206 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 5 UNIT 5207 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 5 UNIT 5208 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 5 UNIT 5301 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 5 UNIT 5302 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 5 UNIT 5303 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 5 UNIT 5304 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 5 UNIT 5305 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 5 UNIT 5306 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 5 UNIT 5307 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 5 UNIT 5308 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 6 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 6 UNIT 6101 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 6 UNIT 6102 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 6 UNIT 6103 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 6 UNIT 6104 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 6 UNIT 6105 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 6 UNIT 6106 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 6 UNIT 6107 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 6 UNIT 6108 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 6 UNIT 6201 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 6 UNIT 6202 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 6 UNIT 6203 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 6 UNIT 6204 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 6 UNIT 6205 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 6 UNIT 6206 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 6 UNIT 6207 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 6 UNIT 6208 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 6 UNIT 6301 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 6 UNIT 6302 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 6 UNIT 6303 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 6 UNIT 6304 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 6 UNIT 6305 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 6 UNIT 6306 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 6 UNIT 6307 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 6 UNIT 6308 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 7 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 7 UNIT 7101 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 7 UNIT 7102 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 7 UNIT 7103 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 7 UNIT 7104 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 7 UNIT 7105 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 7 UNIT 7106 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 7 UNIT 7107 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 7 UNIT 7108 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 7 UNIT 7201 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 7 UNIT 7202 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 7 UNIT 7203 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 7 UNIT 7204 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 7 UNIT 7205 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 7 UNIT 7206 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 7 UNIT 7207 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 7 UNIT 7208 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 7 UNIT 7301 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 7 UNIT 7302 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 7 UNIT 7303 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 7 UNIT 7304 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 7 UNIT 7305 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 7 UNIT 7306 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 7 UNIT 7307 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 7 UNIT 7308 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 8 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 8 UNIT 8101 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 8 UNIT 8102 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 8 UNIT 8103 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 8 UNIT 8104 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 8 UNIT 8105 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 8 UNIT 8106 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 8 UNIT 8107 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 8 UNIT 8108 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 8 UNIT 8201 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 8 UNIT 8202 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 8 UNIT 8203 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 8 UNIT 8204 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 8 UNIT 8205 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 8 UNIT 8206 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 8 UNIT 8207 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 8 UNIT 8208 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 8 UNIT 8301 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 8 UNIT 8302 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 8 UNIT 8303 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 8 UNIT 8304 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 8 UNIT 8305 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 8 UNIT 8306 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 8 UNIT 8307 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 8 UNIT 8308 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 9 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 9 UNIT 10101 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 9 UNIT 10102 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 9 UNIT 10103 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 9 UNIT 10104 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 9 UNIT 10105 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 9 UNIT 10106 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 9 UNIT 10107 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 9 UNIT 10108 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 9 UNIT 10201 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 9 UNIT 10202 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 9 UNIT 10203 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 9 UNIT 10204 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 9 UNIT 10205 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 9 UNIT 10206 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 9 UNIT 10207 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 9 UNIT 10208 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 9 UNIT 10301 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 9 UNIT 10302 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 9 UNIT 10303 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 9 UNIT 10304 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 9 UNIT 10305 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 9 UNIT 10306 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 9 UNIT 10307 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 9 UNIT 10308 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 9 UNIT 9101 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 9 UNIT 9102 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 9 UNIT 9103 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 9 UNIT 9104 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 9 UNIT 9105 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 9 UNIT 9106 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 9 UNIT 9107 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 9 UNIT 9108 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 9 UNIT 9201 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 9 UNIT 9202 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 9 UNIT 9203 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 9 UNIT 9204 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 9 UNIT 9205 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 9 UNIT 9206 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 9 UNIT 9207 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 9 UNIT 9208 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 9 UNIT 9301 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 9 UNIT 9302 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 9 UNIT 9303 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 9 UNIT 9304 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 9 UNIT 9305 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 9 UNIT 9306 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 9 UNIT 9307 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 9 UNIT 9308 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG A Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG B Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG C Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG C UNIT 300 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 UNIT 1 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 UNIT 10 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 UNIT 100 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 UNIT 11 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 UNIT 110 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 UNIT 12 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 UNIT 13 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 UNIT 14 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 UNIT 15 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 UNIT 150 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 UNIT 15A Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 UNIT 16 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 UNIT 16A Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 UNIT 16B Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 UNIT 17 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 UNIT 18 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 UNIT 180 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 UNIT 19 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 UNIT 2 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 UNIT 20 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 UNIT 21 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 UNIT 22 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 UNIT 23 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 UNIT 24 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 UNIT 25 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 UNIT 26 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 UNIT 27 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 UNIT 28 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 UNIT 29 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 UNIT 3 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 UNIT 31 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 UNIT 32 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 UNIT 33 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 UNIT 34 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 UNIT 35 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 UNIT 36 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 UNIT 38 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 UNIT 39 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 UNIT 4 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 UNIT 40 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 UNIT 41 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 UNIT 42 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 UNIT 43 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 UNIT 44 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 UNIT 45 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 UNIT 46 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 UNIT 47 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 UNIT 48 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 UNIT 49 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 UNIT 5 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 UNIT 51 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 UNIT 52 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 UNIT 53 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 UNIT 54 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 UNIT 56 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 UNIT 6 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 UNIT 7 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 UNIT 8 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 UNIT 9 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 UNIT A Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 UNIT B Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 UNIT C Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 UNIT D Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 UNIT E Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 UNIT F Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 UNIT G Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 UNIT H Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 UNIT I Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 UNIT J Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 UNIT K Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 UNIT L Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 UNIT M Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 UNIT N Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 UNIT O Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 UNIT P Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 UNIT Q Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 UNIT R Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 UNIT S Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 UNIT T Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 UNIT U Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 UNIT V Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 UNIT W Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 UNIT X Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 UNIT Y Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
T20CM09077 Issued 12/28/2020 10/11/2023 Commercial Building SPECIAL EXCEPTION # 20-09: Installation of new 75' tall core-ten pole with antenna arrays, outdoor
T04AN00140 Issued 02/19/2004 N/A ADDRNEW
T04EX01183 Closed 12/30/2004 02/28/2005 EXCAV EXCA:FIBER OPTIC INSTALLATION
T07AN00082 Issued 01/24/2007 N/A ADDRNEW
T07EL00145 Final 01/25/2007 07/29/2007 ELECT ELECTRIC FOR TRAFFIC SIGNAL
T08OT01211 Withdrwn 05/20/2008 11/17/2008 SIGN 15013
T14BU00287 Expired 03/14/2014 09/27/2014 DEMO DEMO: CONCRETE STRUCTURE
T21RW03024 Final 06/22/2021 07/28/2021 ROW INSTALLING ANCHOR 15' FROM POLE - SE CORNER OF S NOGALES HY/E DREXEL RD INGRESS/ EGRESS FOR BUSINESS AND RESIDENTIAL ACCESS SHALL BE MAINTAINED. FIELD ADJUSTMENTS MAY BE REQUIRED. MAINTAIN PEDESTRIAN ACCESS Proof of notification is required at the time of the preconstruction meeting.
T22RW02196 Final 06/17/2022 10/03/2022 ROW Starting on the N/E corner of E. Drexel Rd and S. Nogales HWY at TEP pole Overlash fiber 68' S/W, riser down pole Trench /bore East 6' place New Cox Vault last to install Tie in to Existing Verizon Vault. ** PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING. OTHER ACTIVITIES IN THE AREA, WILL NEED TO COORDINATE TRAFFIC CONTROL SETUP WITH EXISTING SETUP. BUS STOP IN THE AREA, CONTACT SUN TRAN DISPATCH, AT 520-206-8934 AND/OR BEA PAULUS AT 520-206-8826 AT LEAST 48-BUSINESS HOURS PRIOR TO START OF WORK FOR COORDINATION.

Code Enforcement

Parcel Number - 138090160
Date - 11/13/2024 4:14 a.m.
Total Number Of Code Cases - 18
Case Number Case Status Entered Date Closed Date Unit Type Description
T07DV05052 Complian 06/05/2007 N/A DNR_VIOL VEHICLES FOR SALE PARKED ON SIDE OF ROAD ON SW CORNER OF BILBY & NOGALES. AREA MAY BE PART OF CITY ROW/STREET.
T07DV12892 Complian 12/10/2007 N/A DNR_VIOL DOT REFERRAL: WEST OF 1ST AVE BETWEEN DREXEL RD & BILBY RD - WILDCAT DUMPING ON VACANT LOT OWNED BY RAIL ROAD. 2ND COMPLAINT FROM TPD; REGARDING VACANT LOT AT CORNER OF SOUTHLAND AND DREXEL BRUSH WAS PREVIOUSLY BURNT THERE IS TRASH THRU OUT. PROPERTY IS ACCROSS THE STREET FROM AN ELEM. SCHOOL.
T08DV00253 Complian 01/07/2008 01/08/2008 DNR_VIOL PEDDLER OPERATING WITH A BUSINESS LICENSE ON SOUTH END OF PARCEL AT VALENCIA AND NOGALES HWY.
T08DV02598 Void 03/28/2008 N/A DNR_VIOL WILDCAT DUMPING: TRASH BEHIND 5918 S. SOUTHLAND BLVD ALONG RAILROAD. CONTINUOUS PROBLEM FOR NEIGHBORHOOD.
T08DV05823 Complian 07/11/2008 N/A DNR_VIOL ILLEGAL DUMPING ACROSS FROM 5737 S 1ST AVE
T08DV11212 Complian 12/08/2008 N/A DNR_VIOL LARGE AMOUNT OF ILLEGAL DUMPING IN AREA ACROSS 1ST & ALVORD
T12DV11030 Complian 12/10/2012 N/A DNR_VIOL A large amount of illegal dumping exists near the railroad tracks at Drexel and Nogales Highway.
T13DV03762 Complian 05/31/2013 N/A DNR_VIOL Excessive trash/debris on vacant lot across the street from 5729 S. 1st Avenue.
T14DV01452 Noverify 03/11/2014 N/A DNR_VIOL ABANDONDED HOMELESS CAMP - PROPERTY LITTERED WITH REFUSE/SHOPPING CARTS CAMP IS LOCATED BEHIND 6201 S. 1st Ave
T14DV01505 Complian 03/12/2014 N/A DNR_VIOL ILLEGAL DUMPING OCCURING THROUGHOUT THE LOT
T14DV02397 Complian 04/15/2014 N/A DNR_VIOL RECALL POLITICAL SIGN ON A NO PARKING SIGN ON THE SOUTHWEST CORNER.
T15DV01436 Complian 02/27/2015 N/A DNR_VIOL SIGN - 4'X4' WOODEN SIGN BY TRACKS
T15DV03678 Complian 05/15/2015 N/A DNR_VIOL ARIZONA RECYCLES CONTAINER WITH SIGN MOUNTED ON TOP.
T16DV01800 Complian 03/24/2016 N/A DNR_VIOL LARGE AMOUNT OF TRASH ALONG THE RAILROAD PROPERTY
T16DV03879 Complian 06/27/2016 N/A DNR_VIOL REFUSE PILED ON PARCEL WEST OF 701 E ALVORD
T19DV06486 Complian 08/14/2019 N/A DNR_VIOL homeless camp on 1st and bilby towards wash reported by tpd
T20DV05921 Complian 08/27/2020 N/A DNR_VIOL REFUSE PILED ON PARCEL BETWEEN 5918 S SOUTHLAND BLVD AND 701 E ALVORD
T22DV01341 Referred 02/18/2022 N/A DNR_VIOL tRASH AN DDEBRIS IS BEING DUMPED IN THE EASEMENT

Plans

Parcel Number - 138090160
Date - 11/13/2024 4:14 a.m.
Total Number Of Plans - 2
Plan Number Plan Status Application Date Expired Date Unit Type Description
T20SE00009 Effectuated 07/24/2020 07/24/2021 Map/Use Changes - Entitlements SE-20-09 T-Mobile-460 E Drexel - New T-Mobile 75-foot cell tower (monopole). - New 75' tall WCF monopole
T20PRE0027 Plan ck 02/06/2020 N/A NEIGHBORHOOD NOTIFICATION