Parcel Search: 138042530
Parcel Search
Parcel Attributes
| Parcel | 138042530 |
|---|---|
| Jurisdiction | Tucson, Pima County |
| Water Course | Street |
| City of Tucson Zoning | R-1 |
| Tucson Ward | Ward 1 |
| Flood Related Information | FEMA Floodplain Area |
| Tucson Registered Neighborhood | Elvira |
| Pima County Data | Assessor, Recorder, Treasurer, ... |
| Parcel Map | Map |
| Address | |
| Parcel Attributes Issue? | |
Annexations & Original City Zoning (OCZ)
Date - 11/25/2026 12:04 a.m.
Total Number Of OZC Plans - (1)
Special Development Requests & Requirements
Date - 11/25/2026 12:04 a.m.
Total Number Of Special Development Permits - (1)
| Activity Number | Status | Apply Date | Expired Date | Type | Description |
|---|---|---|---|---|---|
| T15SA00027 | Complete | 09/09/2015 |
Permits
Parcel Number - 138042530
Date - 11/25/2026 12:04 a.m.
Total Number Of Permits - (46)
| Permit | Permit Status | Entered Date | Expired Date | Unit | Type | Description |
|---|---|---|---|---|---|---|
| T21OT00713 | Issued | 09/27/2021 | 03/30/2022 | Floodplain Use | 8.4KW DC System - Roof Mount PV with Production Meter and AC Disco | |
| TR-ROW-1223-01485 | Void | 12/29/2023 | N/A | Right-of-Way (ROW) | KE&G will be preforming milling and paving operations in the Barrio Nopal & Elvira neighborhoods including concrete work consisting of sidewalk and ADA ramps. | |
| TR-ROW-1223-01485 | Void | 12/29/2023 | N/A | BLDG 1 | Right-of-Way (ROW) | KE&G will be preforming milling and paving operations in the Barrio Nopal & Elvira neighborhoods including concrete work consisting of sidewalk and ADA ramps. |
| TR-ROW-1223-01485 | Void | 12/29/2023 | N/A | BLDG 1 UNIT 1 | Right-of-Way (ROW) | KE&G will be preforming milling and paving operations in the Barrio Nopal & Elvira neighborhoods including concrete work consisting of sidewalk and ADA ramps. |
| TR-ROW-1223-01485 | Void | 12/29/2023 | N/A | BLDG 1 UNIT 2 | Right-of-Way (ROW) | KE&G will be preforming milling and paving operations in the Barrio Nopal & Elvira neighborhoods including concrete work consisting of sidewalk and ADA ramps. |
| TR-ROW-1223-01485 | Void | 12/29/2023 | N/A | BLDG 2 | Right-of-Way (ROW) | KE&G will be preforming milling and paving operations in the Barrio Nopal & Elvira neighborhoods including concrete work consisting of sidewalk and ADA ramps. |
| TR-ROW-1223-01485 | Void | 12/29/2023 | N/A | BLDG 2 UNIT 1 | Right-of-Way (ROW) | KE&G will be preforming milling and paving operations in the Barrio Nopal & Elvira neighborhoods including concrete work consisting of sidewalk and ADA ramps. |
| TR-ROW-1223-01485 | Void | 12/29/2023 | N/A | BLDG 2 UNIT 2 | Right-of-Way (ROW) | KE&G will be preforming milling and paving operations in the Barrio Nopal & Elvira neighborhoods including concrete work consisting of sidewalk and ADA ramps. |
| TR-ROW-1223-01485 | Void | 12/29/2023 | N/A | BLDG 3 | Right-of-Way (ROW) | KE&G will be preforming milling and paving operations in the Barrio Nopal & Elvira neighborhoods including concrete work consisting of sidewalk and ADA ramps. |
| TR-ROW-1223-01485 | Void | 12/29/2023 | N/A | BLDG 3 UNIT 1 | Right-of-Way (ROW) | KE&G will be preforming milling and paving operations in the Barrio Nopal & Elvira neighborhoods including concrete work consisting of sidewalk and ADA ramps. |
| TR-ROW-1223-01485 | Void | 12/29/2023 | N/A | BLDG 3 UNIT 2 | Right-of-Way (ROW) | KE&G will be preforming milling and paving operations in the Barrio Nopal & Elvira neighborhoods including concrete work consisting of sidewalk and ADA ramps. |
| TR-ROW-1223-01485 | Void | 12/29/2023 | N/A | BLDG 4 | Right-of-Way (ROW) | KE&G will be preforming milling and paving operations in the Barrio Nopal & Elvira neighborhoods including concrete work consisting of sidewalk and ADA ramps. |
| TR-ROW-1223-01485 | Void | 12/29/2023 | N/A | BLDG 4 UNIT 1 | Right-of-Way (ROW) | KE&G will be preforming milling and paving operations in the Barrio Nopal & Elvira neighborhoods including concrete work consisting of sidewalk and ADA ramps. |
| TR-ROW-1223-01485 | Void | 12/29/2023 | N/A | BLDG 4 UNIT 2 | Right-of-Way (ROW) | KE&G will be preforming milling and paving operations in the Barrio Nopal & Elvira neighborhoods including concrete work consisting of sidewalk and ADA ramps. |
| TR-ROW-1223-01485 | Void | 12/29/2023 | N/A | UNIT 1 | Right-of-Way (ROW) | KE&G will be preforming milling and paving operations in the Barrio Nopal & Elvira neighborhoods including concrete work consisting of sidewalk and ADA ramps. |
| TR-ROW-1223-01485 | Void | 12/29/2023 | N/A | UNIT 101 | Right-of-Way (ROW) | KE&G will be preforming milling and paving operations in the Barrio Nopal & Elvira neighborhoods including concrete work consisting of sidewalk and ADA ramps. |
| TR-ROW-1223-01485 | Void | 12/29/2023 | N/A | UNIT 102 | Right-of-Way (ROW) | KE&G will be preforming milling and paving operations in the Barrio Nopal & Elvira neighborhoods including concrete work consisting of sidewalk and ADA ramps. |
| TR-ROW-1223-01485 | Void | 12/29/2023 | N/A | UNIT 103 | Right-of-Way (ROW) | KE&G will be preforming milling and paving operations in the Barrio Nopal & Elvira neighborhoods including concrete work consisting of sidewalk and ADA ramps. |
| TR-ROW-1223-01485 | Void | 12/29/2023 | N/A | UNIT 104 | Right-of-Way (ROW) | KE&G will be preforming milling and paving operations in the Barrio Nopal & Elvira neighborhoods including concrete work consisting of sidewalk and ADA ramps. |
| TR-ROW-1223-01485 | Void | 12/29/2023 | N/A | UNIT 1101 | Right-of-Way (ROW) | KE&G will be preforming milling and paving operations in the Barrio Nopal & Elvira neighborhoods including concrete work consisting of sidewalk and ADA ramps. |
| TR-ROW-1223-01485 | Void | 12/29/2023 | N/A | UNIT 1102 | Right-of-Way (ROW) | KE&G will be preforming milling and paving operations in the Barrio Nopal & Elvira neighborhoods including concrete work consisting of sidewalk and ADA ramps. |
| TR-ROW-1223-01485 | Void | 12/29/2023 | N/A | UNIT 1103 | Right-of-Way (ROW) | KE&G will be preforming milling and paving operations in the Barrio Nopal & Elvira neighborhoods including concrete work consisting of sidewalk and ADA ramps. |
| TR-ROW-1223-01485 | Void | 12/29/2023 | N/A | UNIT 1104 | Right-of-Way (ROW) | KE&G will be preforming milling and paving operations in the Barrio Nopal & Elvira neighborhoods including concrete work consisting of sidewalk and ADA ramps. |
| TR-ROW-1223-01485 | Void | 12/29/2023 | N/A | UNIT 1105 | Right-of-Way (ROW) | KE&G will be preforming milling and paving operations in the Barrio Nopal & Elvira neighborhoods including concrete work consisting of sidewalk and ADA ramps. |
| TR-ROW-1223-01485 | Void | 12/29/2023 | N/A | UNIT 2 | Right-of-Way (ROW) | KE&G will be preforming milling and paving operations in the Barrio Nopal & Elvira neighborhoods including concrete work consisting of sidewalk and ADA ramps. |
| TR-ROW-1223-01485 | Void | 12/29/2023 | N/A | UNIT 2102 | Right-of-Way (ROW) | KE&G will be preforming milling and paving operations in the Barrio Nopal & Elvira neighborhoods including concrete work consisting of sidewalk and ADA ramps. |
| TR-ROW-1223-01485 | Void | 12/29/2023 | N/A | UNIT 2103 | Right-of-Way (ROW) | KE&G will be preforming milling and paving operations in the Barrio Nopal & Elvira neighborhoods including concrete work consisting of sidewalk and ADA ramps. |
| TR-ROW-1223-01485 | Void | 12/29/2023 | N/A | UNIT 2105 | Right-of-Way (ROW) | KE&G will be preforming milling and paving operations in the Barrio Nopal & Elvira neighborhoods including concrete work consisting of sidewalk and ADA ramps. |
| TR-ROW-1223-01485 | Void | 12/29/2023 | N/A | UNIT 3 | Right-of-Way (ROW) | KE&G will be preforming milling and paving operations in the Barrio Nopal & Elvira neighborhoods including concrete work consisting of sidewalk and ADA ramps. |
| TR-ROW-1223-01485 | Void | 12/29/2023 | N/A | UNIT 3103 | Right-of-Way (ROW) | KE&G will be preforming milling and paving operations in the Barrio Nopal & Elvira neighborhoods including concrete work consisting of sidewalk and ADA ramps. |
| TR-ROW-1223-01485 | Void | 12/29/2023 | N/A | UNIT 3104 | Right-of-Way (ROW) | KE&G will be preforming milling and paving operations in the Barrio Nopal & Elvira neighborhoods including concrete work consisting of sidewalk and ADA ramps. |
| TR-ROW-1223-01485 | Void | 12/29/2023 | N/A | UNIT 3105 | Right-of-Way (ROW) | KE&G will be preforming milling and paving operations in the Barrio Nopal & Elvira neighborhoods including concrete work consisting of sidewalk and ADA ramps. |
| TR-ROW-1223-01485 | Void | 12/29/2023 | N/A | UNIT 4 | Right-of-Way (ROW) | KE&G will be preforming milling and paving operations in the Barrio Nopal & Elvira neighborhoods including concrete work consisting of sidewalk and ADA ramps. |
| TR-ROW-1223-01485 | Void | 12/29/2023 | N/A | UNIT 5 | Right-of-Way (ROW) | KE&G will be preforming milling and paving operations in the Barrio Nopal & Elvira neighborhoods including concrete work consisting of sidewalk and ADA ramps. |
| TR-ROW-1223-01485 | Void | 12/29/2023 | N/A | UNIT 6 | Right-of-Way (ROW) | KE&G will be preforming milling and paving operations in the Barrio Nopal & Elvira neighborhoods including concrete work consisting of sidewalk and ADA ramps. |
| TR-ROW-1223-01485 | Void | 12/29/2023 | N/A | UNIT 7 | Right-of-Way (ROW) | KE&G will be preforming milling and paving operations in the Barrio Nopal & Elvira neighborhoods including concrete work consisting of sidewalk and ADA ramps. |
| TR-ROW-1223-01485 | Void | 12/29/2023 | N/A | UNIT 8 | Right-of-Way (ROW) | KE&G will be preforming milling and paving operations in the Barrio Nopal & Elvira neighborhoods including concrete work consisting of sidewalk and ADA ramps. |
| TR-ROW-1223-01485 | Void | 12/29/2023 | N/A | UNIT M1 | Right-of-Way (ROW) | KE&G will be preforming milling and paving operations in the Barrio Nopal & Elvira neighborhoods including concrete work consisting of sidewalk and ADA ramps. |
| TR-ROW-1223-01485 | Void | 12/29/2023 | N/A | UNIT M2 | Right-of-Way (ROW) | KE&G will be preforming milling and paving operations in the Barrio Nopal & Elvira neighborhoods including concrete work consisting of sidewalk and ADA ramps. |
| T04PL01200 | Final | 07/07/2004 | 03/15/2005 | PLUMB | Install 30 gal/gas water heater. | |
| T12CM04405 | Final | 07/19/2012 | 03/12/2014 | COMBO | ADD; FAMILY ROOM TO RES | |
| T12OT01109 | Final | 07/26/2012 | N/A | FLOODPLN | FLOODPLAIN PERMIT ADD; FAMILY ROOM TO RES | |
| T15CM00674 | Final | 01/30/2015 | 03/09/2016 | COMBO | PORCH/CARPORT/SHED ADDITION (T14DV09713) | |
| T15OT00590 | Final | 05/01/2015 | N/A | FLOODPLN | PORCH/CARPORT/SHED ADDITION (T14DV09713) | |
| T21CM07040 | Final | 08/30/2021 | 05/04/2022 | COMBO | 8.4KW DC System - Roof Mount PV with Production Meter and AC Disco | |
| T99EL00643 | Final | 04/01/1999 | 09/29/1999 | ELECT | UPGRADE:ELECTRIC:60 TO 100 AMP |
Code Enforcement
Parcel Number - 138042530
Date - 11/25/2026 12:04 a.m.
Total Number Of Code Cases - 3
| Case Number | Case Status | Entered Date | Closed Date | Unit | Type | Description |
|---|---|---|---|---|---|---|
| T11DV01708 | Complian | 03/17/2011 | N/A | DNR_VIOL | TALL GRASS AND WEEDS WITH TRASH AND DEBRIS THOUGH OUT, NEW AC PACKAGE UNIT ON THE ROOF AND HAS A WOOD FRAME SHED IN THE REAR SIDE YARD ON THE EAST SIDE NOT MEETING THE SETBACK | |
| T11DV03357 | Complian | 05/09/2011 | N/A | DNR_VIOL | NEW AC PACKAGE UNIT ON THE ROOF AND A WOOD FRAME SHED IN THE REAR YARD NOT MEETING SETBACKS | |
| T14DV09713 | Complian | 11/26/2014 | N/A | DNR_VIOL | WORK WITHOUT PERMIT. DOUBLE CARPORT |