Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Parcel Search
 
Parcel Attributes
Parcel138042230
JurisdictionTucson, Pima County
City of Tucson ZoningR-1
Tucson WardWard 1
Tucson Registered NeighborhoodElvira
Pima County Data Assessor, Recorder, Treasurer, ...
Parcel Map Map
Address
Parcel Attributes Issue?

Annexations & Original City Zoning (OCZ)

Date - 11/22/2026 5:31 p.m.
Total Number Of OZC Plans - (1)
Plan Description Annexation Ordinance Effective Date OCZ Ordinance
C9-60-39 West To Silverbell Road And South To San Xavier Indian Reservation 2014 03/18/1960 2045

Special Development Requests & Requirements

Date - 11/22/2026 5:31 p.m.
Total Number Of Special Development Permits - (1)
Activity Number Status Apply Date Expired Date Type Description
H000013830 Closed N/A

Permits

Parcel Number - 138042230
Date - 11/22/2026 5:31 p.m.
Total Number Of Permits - (42)
Permit Permit Status Entered Date Expired Date Unit Type Description
TR-ROW-1223-01485 Void 12/29/2023 N/A Right-of-Way (ROW) KE&G will be preforming milling and paving operations in the Barrio Nopal & Elvira neighborhoods including concrete work consisting of sidewalk and ADA ramps.
TR-ROW-1223-01485 Void 12/29/2023 N/A BLDG 1 Right-of-Way (ROW) KE&G will be preforming milling and paving operations in the Barrio Nopal & Elvira neighborhoods including concrete work consisting of sidewalk and ADA ramps.
TR-ROW-1223-01485 Void 12/29/2023 N/A BLDG 1 UNIT 1 Right-of-Way (ROW) KE&G will be preforming milling and paving operations in the Barrio Nopal & Elvira neighborhoods including concrete work consisting of sidewalk and ADA ramps.
TR-ROW-1223-01485 Void 12/29/2023 N/A BLDG 1 UNIT 2 Right-of-Way (ROW) KE&G will be preforming milling and paving operations in the Barrio Nopal & Elvira neighborhoods including concrete work consisting of sidewalk and ADA ramps.
TR-ROW-1223-01485 Void 12/29/2023 N/A BLDG 2 Right-of-Way (ROW) KE&G will be preforming milling and paving operations in the Barrio Nopal & Elvira neighborhoods including concrete work consisting of sidewalk and ADA ramps.
TR-ROW-1223-01485 Void 12/29/2023 N/A BLDG 2 UNIT 1 Right-of-Way (ROW) KE&G will be preforming milling and paving operations in the Barrio Nopal & Elvira neighborhoods including concrete work consisting of sidewalk and ADA ramps.
TR-ROW-1223-01485 Void 12/29/2023 N/A BLDG 2 UNIT 2 Right-of-Way (ROW) KE&G will be preforming milling and paving operations in the Barrio Nopal & Elvira neighborhoods including concrete work consisting of sidewalk and ADA ramps.
TR-ROW-1223-01485 Void 12/29/2023 N/A BLDG 3 Right-of-Way (ROW) KE&G will be preforming milling and paving operations in the Barrio Nopal & Elvira neighborhoods including concrete work consisting of sidewalk and ADA ramps.
TR-ROW-1223-01485 Void 12/29/2023 N/A BLDG 3 UNIT 1 Right-of-Way (ROW) KE&G will be preforming milling and paving operations in the Barrio Nopal & Elvira neighborhoods including concrete work consisting of sidewalk and ADA ramps.
TR-ROW-1223-01485 Void 12/29/2023 N/A BLDG 3 UNIT 2 Right-of-Way (ROW) KE&G will be preforming milling and paving operations in the Barrio Nopal & Elvira neighborhoods including concrete work consisting of sidewalk and ADA ramps.
TR-ROW-1223-01485 Void 12/29/2023 N/A BLDG 4 Right-of-Way (ROW) KE&G will be preforming milling and paving operations in the Barrio Nopal & Elvira neighborhoods including concrete work consisting of sidewalk and ADA ramps.
TR-ROW-1223-01485 Void 12/29/2023 N/A BLDG 4 UNIT 1 Right-of-Way (ROW) KE&G will be preforming milling and paving operations in the Barrio Nopal & Elvira neighborhoods including concrete work consisting of sidewalk and ADA ramps.
TR-ROW-1223-01485 Void 12/29/2023 N/A BLDG 4 UNIT 2 Right-of-Way (ROW) KE&G will be preforming milling and paving operations in the Barrio Nopal & Elvira neighborhoods including concrete work consisting of sidewalk and ADA ramps.
TR-ROW-1223-01485 Void 12/29/2023 N/A UNIT 1 Right-of-Way (ROW) KE&G will be preforming milling and paving operations in the Barrio Nopal & Elvira neighborhoods including concrete work consisting of sidewalk and ADA ramps.
TR-ROW-1223-01485 Void 12/29/2023 N/A UNIT 101 Right-of-Way (ROW) KE&G will be preforming milling and paving operations in the Barrio Nopal & Elvira neighborhoods including concrete work consisting of sidewalk and ADA ramps.
TR-ROW-1223-01485 Void 12/29/2023 N/A UNIT 102 Right-of-Way (ROW) KE&G will be preforming milling and paving operations in the Barrio Nopal & Elvira neighborhoods including concrete work consisting of sidewalk and ADA ramps.
TR-ROW-1223-01485 Void 12/29/2023 N/A UNIT 103 Right-of-Way (ROW) KE&G will be preforming milling and paving operations in the Barrio Nopal & Elvira neighborhoods including concrete work consisting of sidewalk and ADA ramps.
TR-ROW-1223-01485 Void 12/29/2023 N/A UNIT 104 Right-of-Way (ROW) KE&G will be preforming milling and paving operations in the Barrio Nopal & Elvira neighborhoods including concrete work consisting of sidewalk and ADA ramps.
TR-ROW-1223-01485 Void 12/29/2023 N/A UNIT 1101 Right-of-Way (ROW) KE&G will be preforming milling and paving operations in the Barrio Nopal & Elvira neighborhoods including concrete work consisting of sidewalk and ADA ramps.
TR-ROW-1223-01485 Void 12/29/2023 N/A UNIT 1102 Right-of-Way (ROW) KE&G will be preforming milling and paving operations in the Barrio Nopal & Elvira neighborhoods including concrete work consisting of sidewalk and ADA ramps.
TR-ROW-1223-01485 Void 12/29/2023 N/A UNIT 1103 Right-of-Way (ROW) KE&G will be preforming milling and paving operations in the Barrio Nopal & Elvira neighborhoods including concrete work consisting of sidewalk and ADA ramps.
TR-ROW-1223-01485 Void 12/29/2023 N/A UNIT 1104 Right-of-Way (ROW) KE&G will be preforming milling and paving operations in the Barrio Nopal & Elvira neighborhoods including concrete work consisting of sidewalk and ADA ramps.
TR-ROW-1223-01485 Void 12/29/2023 N/A UNIT 1105 Right-of-Way (ROW) KE&G will be preforming milling and paving operations in the Barrio Nopal & Elvira neighborhoods including concrete work consisting of sidewalk and ADA ramps.
TR-ROW-1223-01485 Void 12/29/2023 N/A UNIT 2 Right-of-Way (ROW) KE&G will be preforming milling and paving operations in the Barrio Nopal & Elvira neighborhoods including concrete work consisting of sidewalk and ADA ramps.
TR-ROW-1223-01485 Void 12/29/2023 N/A UNIT 2102 Right-of-Way (ROW) KE&G will be preforming milling and paving operations in the Barrio Nopal & Elvira neighborhoods including concrete work consisting of sidewalk and ADA ramps.
TR-ROW-1223-01485 Void 12/29/2023 N/A UNIT 2103 Right-of-Way (ROW) KE&G will be preforming milling and paving operations in the Barrio Nopal & Elvira neighborhoods including concrete work consisting of sidewalk and ADA ramps.
TR-ROW-1223-01485 Void 12/29/2023 N/A UNIT 2105 Right-of-Way (ROW) KE&G will be preforming milling and paving operations in the Barrio Nopal & Elvira neighborhoods including concrete work consisting of sidewalk and ADA ramps.
TR-ROW-1223-01485 Void 12/29/2023 N/A UNIT 3 Right-of-Way (ROW) KE&G will be preforming milling and paving operations in the Barrio Nopal & Elvira neighborhoods including concrete work consisting of sidewalk and ADA ramps.
TR-ROW-1223-01485 Void 12/29/2023 N/A UNIT 3103 Right-of-Way (ROW) KE&G will be preforming milling and paving operations in the Barrio Nopal & Elvira neighborhoods including concrete work consisting of sidewalk and ADA ramps.
TR-ROW-1223-01485 Void 12/29/2023 N/A UNIT 3104 Right-of-Way (ROW) KE&G will be preforming milling and paving operations in the Barrio Nopal & Elvira neighborhoods including concrete work consisting of sidewalk and ADA ramps.
TR-ROW-1223-01485 Void 12/29/2023 N/A UNIT 3105 Right-of-Way (ROW) KE&G will be preforming milling and paving operations in the Barrio Nopal & Elvira neighborhoods including concrete work consisting of sidewalk and ADA ramps.
TR-ROW-1223-01485 Void 12/29/2023 N/A UNIT 4 Right-of-Way (ROW) KE&G will be preforming milling and paving operations in the Barrio Nopal & Elvira neighborhoods including concrete work consisting of sidewalk and ADA ramps.
TR-ROW-1223-01485 Void 12/29/2023 N/A UNIT 5 Right-of-Way (ROW) KE&G will be preforming milling and paving operations in the Barrio Nopal & Elvira neighborhoods including concrete work consisting of sidewalk and ADA ramps.
TR-ROW-1223-01485 Void 12/29/2023 N/A UNIT 6 Right-of-Way (ROW) KE&G will be preforming milling and paving operations in the Barrio Nopal & Elvira neighborhoods including concrete work consisting of sidewalk and ADA ramps.
TR-ROW-1223-01485 Void 12/29/2023 N/A UNIT 7 Right-of-Way (ROW) KE&G will be preforming milling and paving operations in the Barrio Nopal & Elvira neighborhoods including concrete work consisting of sidewalk and ADA ramps.
TR-ROW-1223-01485 Void 12/29/2023 N/A UNIT 8 Right-of-Way (ROW) KE&G will be preforming milling and paving operations in the Barrio Nopal & Elvira neighborhoods including concrete work consisting of sidewalk and ADA ramps.
TR-ROW-1223-01485 Void 12/29/2023 N/A UNIT M1 Right-of-Way (ROW) KE&G will be preforming milling and paving operations in the Barrio Nopal & Elvira neighborhoods including concrete work consisting of sidewalk and ADA ramps.
TR-ROW-1223-01485 Void 12/29/2023 N/A UNIT M2 Right-of-Way (ROW) KE&G will be preforming milling and paving operations in the Barrio Nopal & Elvira neighborhoods including concrete work consisting of sidewalk and ADA ramps.
T00CM01711 Withdrwn 04/05/2000 N/A COMBO ENCLOSURE:CARPORT TO BEDROOM
T02PL00548 Final 03/05/2002 09/02/2002 PLUMB REPLACE:GAS LINE (APA)
T16CM02613 Expired 04/08/2016 01/07/2017 COMBO ELEC UPGRADE TO 200AMP
T22CM04510 Final 06/16/2022 03/29/2023 COMBO - SYSTEM SIZE: 3240W DC, 2320W AC - MODULES: (8) REC SOLAR: REC405AA PURE - INVERTERS: (8) ENPHASE ENERGY: IQ8PLUS-72-2-US - RACKING: ; ULTRA RAIL SPEEDSEAL FOOT, SEE DRAWING SNR-DC-00438