Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Parcel Search
 
Parcel Attributes
Parcel138041870
JurisdictionTucson, Pima County
City of Tucson ZoningR-1
Tucson WardWard 1
Tucson Registered NeighborhoodElvira
Pima County Data Assessor, Recorder, Treasurer, ...
Parcel Map Map
Address
Parcel Attributes Issue?

Annexations & Original City Zoning (OCZ)

Date - 10/07/2026 11:29 p.m.
Total Number Of OZC Plans - (1)
Plan Description Annexation Ordinance Effective Date OCZ Ordinance
C9-60-39 West To Silverbell Road And South To San Xavier Indian Reservation 2014 03/18/1960 2045

Permits

Parcel Number - 138041870
Date - 10/07/2026 11:29 p.m.
Total Number Of Permits - (41)
Permit Permit Status Entered Date Expired Date Unit Type Description
TC-RES-0826-04581 Complete 08/17/2026 09/24/2027 Residential Building - One or Two Family Hunter Contracting will be using 1" White Aquapex for the new waterline service installation. Hunter will utilize 12ga Blue tracer lin. Hunter Plans to install the water service at a depth of 12-18 inches.
TR-ROW-1223-01485 Void 12/29/2023 N/A Right-of-Way (ROW) KE&G will be preforming milling and paving operations in the Barrio Nopal & Elvira neighborhoods including concrete work consisting of sidewalk and ADA ramps.
TR-ROW-1223-01485 Void 12/29/2023 N/A BLDG 1 Right-of-Way (ROW) KE&G will be preforming milling and paving operations in the Barrio Nopal & Elvira neighborhoods including concrete work consisting of sidewalk and ADA ramps.
TR-ROW-1223-01485 Void 12/29/2023 N/A BLDG 1 UNIT 1 Right-of-Way (ROW) KE&G will be preforming milling and paving operations in the Barrio Nopal & Elvira neighborhoods including concrete work consisting of sidewalk and ADA ramps.
TR-ROW-1223-01485 Void 12/29/2023 N/A BLDG 1 UNIT 2 Right-of-Way (ROW) KE&G will be preforming milling and paving operations in the Barrio Nopal & Elvira neighborhoods including concrete work consisting of sidewalk and ADA ramps.
TR-ROW-1223-01485 Void 12/29/2023 N/A BLDG 2 Right-of-Way (ROW) KE&G will be preforming milling and paving operations in the Barrio Nopal & Elvira neighborhoods including concrete work consisting of sidewalk and ADA ramps.
TR-ROW-1223-01485 Void 12/29/2023 N/A BLDG 2 UNIT 1 Right-of-Way (ROW) KE&G will be preforming milling and paving operations in the Barrio Nopal & Elvira neighborhoods including concrete work consisting of sidewalk and ADA ramps.
TR-ROW-1223-01485 Void 12/29/2023 N/A BLDG 2 UNIT 2 Right-of-Way (ROW) KE&G will be preforming milling and paving operations in the Barrio Nopal & Elvira neighborhoods including concrete work consisting of sidewalk and ADA ramps.
TR-ROW-1223-01485 Void 12/29/2023 N/A BLDG 3 Right-of-Way (ROW) KE&G will be preforming milling and paving operations in the Barrio Nopal & Elvira neighborhoods including concrete work consisting of sidewalk and ADA ramps.
TR-ROW-1223-01485 Void 12/29/2023 N/A BLDG 3 UNIT 1 Right-of-Way (ROW) KE&G will be preforming milling and paving operations in the Barrio Nopal & Elvira neighborhoods including concrete work consisting of sidewalk and ADA ramps.
TR-ROW-1223-01485 Void 12/29/2023 N/A BLDG 3 UNIT 2 Right-of-Way (ROW) KE&G will be preforming milling and paving operations in the Barrio Nopal & Elvira neighborhoods including concrete work consisting of sidewalk and ADA ramps.
TR-ROW-1223-01485 Void 12/29/2023 N/A BLDG 4 Right-of-Way (ROW) KE&G will be preforming milling and paving operations in the Barrio Nopal & Elvira neighborhoods including concrete work consisting of sidewalk and ADA ramps.
TR-ROW-1223-01485 Void 12/29/2023 N/A BLDG 4 UNIT 1 Right-of-Way (ROW) KE&G will be preforming milling and paving operations in the Barrio Nopal & Elvira neighborhoods including concrete work consisting of sidewalk and ADA ramps.
TR-ROW-1223-01485 Void 12/29/2023 N/A BLDG 4 UNIT 2 Right-of-Way (ROW) KE&G will be preforming milling and paving operations in the Barrio Nopal & Elvira neighborhoods including concrete work consisting of sidewalk and ADA ramps.
TR-ROW-1223-01485 Void 12/29/2023 N/A UNIT 1 Right-of-Way (ROW) KE&G will be preforming milling and paving operations in the Barrio Nopal & Elvira neighborhoods including concrete work consisting of sidewalk and ADA ramps.
TR-ROW-1223-01485 Void 12/29/2023 N/A UNIT 101 Right-of-Way (ROW) KE&G will be preforming milling and paving operations in the Barrio Nopal & Elvira neighborhoods including concrete work consisting of sidewalk and ADA ramps.
TR-ROW-1223-01485 Void 12/29/2023 N/A UNIT 102 Right-of-Way (ROW) KE&G will be preforming milling and paving operations in the Barrio Nopal & Elvira neighborhoods including concrete work consisting of sidewalk and ADA ramps.
TR-ROW-1223-01485 Void 12/29/2023 N/A UNIT 103 Right-of-Way (ROW) KE&G will be preforming milling and paving operations in the Barrio Nopal & Elvira neighborhoods including concrete work consisting of sidewalk and ADA ramps.
TR-ROW-1223-01485 Void 12/29/2023 N/A UNIT 104 Right-of-Way (ROW) KE&G will be preforming milling and paving operations in the Barrio Nopal & Elvira neighborhoods including concrete work consisting of sidewalk and ADA ramps.
TR-ROW-1223-01485 Void 12/29/2023 N/A UNIT 1101 Right-of-Way (ROW) KE&G will be preforming milling and paving operations in the Barrio Nopal & Elvira neighborhoods including concrete work consisting of sidewalk and ADA ramps.
TR-ROW-1223-01485 Void 12/29/2023 N/A UNIT 1102 Right-of-Way (ROW) KE&G will be preforming milling and paving operations in the Barrio Nopal & Elvira neighborhoods including concrete work consisting of sidewalk and ADA ramps.
TR-ROW-1223-01485 Void 12/29/2023 N/A UNIT 1103 Right-of-Way (ROW) KE&G will be preforming milling and paving operations in the Barrio Nopal & Elvira neighborhoods including concrete work consisting of sidewalk and ADA ramps.
TR-ROW-1223-01485 Void 12/29/2023 N/A UNIT 1104 Right-of-Way (ROW) KE&G will be preforming milling and paving operations in the Barrio Nopal & Elvira neighborhoods including concrete work consisting of sidewalk and ADA ramps.
TR-ROW-1223-01485 Void 12/29/2023 N/A UNIT 1105 Right-of-Way (ROW) KE&G will be preforming milling and paving operations in the Barrio Nopal & Elvira neighborhoods including concrete work consisting of sidewalk and ADA ramps.
TR-ROW-1223-01485 Void 12/29/2023 N/A UNIT 2 Right-of-Way (ROW) KE&G will be preforming milling and paving operations in the Barrio Nopal & Elvira neighborhoods including concrete work consisting of sidewalk and ADA ramps.
TR-ROW-1223-01485 Void 12/29/2023 N/A UNIT 2102 Right-of-Way (ROW) KE&G will be preforming milling and paving operations in the Barrio Nopal & Elvira neighborhoods including concrete work consisting of sidewalk and ADA ramps.
TR-ROW-1223-01485 Void 12/29/2023 N/A UNIT 2103 Right-of-Way (ROW) KE&G will be preforming milling and paving operations in the Barrio Nopal & Elvira neighborhoods including concrete work consisting of sidewalk and ADA ramps.
TR-ROW-1223-01485 Void 12/29/2023 N/A UNIT 2105 Right-of-Way (ROW) KE&G will be preforming milling and paving operations in the Barrio Nopal & Elvira neighborhoods including concrete work consisting of sidewalk and ADA ramps.
TR-ROW-1223-01485 Void 12/29/2023 N/A UNIT 3 Right-of-Way (ROW) KE&G will be preforming milling and paving operations in the Barrio Nopal & Elvira neighborhoods including concrete work consisting of sidewalk and ADA ramps.
TR-ROW-1223-01485 Void 12/29/2023 N/A UNIT 3103 Right-of-Way (ROW) KE&G will be preforming milling and paving operations in the Barrio Nopal & Elvira neighborhoods including concrete work consisting of sidewalk and ADA ramps.
TR-ROW-1223-01485 Void 12/29/2023 N/A UNIT 3104 Right-of-Way (ROW) KE&G will be preforming milling and paving operations in the Barrio Nopal & Elvira neighborhoods including concrete work consisting of sidewalk and ADA ramps.
TR-ROW-1223-01485 Void 12/29/2023 N/A UNIT 3105 Right-of-Way (ROW) KE&G will be preforming milling and paving operations in the Barrio Nopal & Elvira neighborhoods including concrete work consisting of sidewalk and ADA ramps.
TR-ROW-1223-01485 Void 12/29/2023 N/A UNIT 4 Right-of-Way (ROW) KE&G will be preforming milling and paving operations in the Barrio Nopal & Elvira neighborhoods including concrete work consisting of sidewalk and ADA ramps.
TR-ROW-1223-01485 Void 12/29/2023 N/A UNIT 5 Right-of-Way (ROW) KE&G will be preforming milling and paving operations in the Barrio Nopal & Elvira neighborhoods including concrete work consisting of sidewalk and ADA ramps.
TR-ROW-1223-01485 Void 12/29/2023 N/A UNIT 6 Right-of-Way (ROW) KE&G will be preforming milling and paving operations in the Barrio Nopal & Elvira neighborhoods including concrete work consisting of sidewalk and ADA ramps.
TR-ROW-1223-01485 Void 12/29/2023 N/A UNIT 7 Right-of-Way (ROW) KE&G will be preforming milling and paving operations in the Barrio Nopal & Elvira neighborhoods including concrete work consisting of sidewalk and ADA ramps.
TR-ROW-1223-01485 Void 12/29/2023 N/A UNIT 8 Right-of-Way (ROW) KE&G will be preforming milling and paving operations in the Barrio Nopal & Elvira neighborhoods including concrete work consisting of sidewalk and ADA ramps.
TR-ROW-1223-01485 Void 12/29/2023 N/A UNIT M1 Right-of-Way (ROW) KE&G will be preforming milling and paving operations in the Barrio Nopal & Elvira neighborhoods including concrete work consisting of sidewalk and ADA ramps.
TR-ROW-1223-01485 Void 12/29/2023 N/A UNIT M2 Right-of-Way (ROW) KE&G will be preforming milling and paving operations in the Barrio Nopal & Elvira neighborhoods including concrete work consisting of sidewalk and ADA ramps.
T15CM00103 Final 01/06/2015 08/29/2015 COMBO NEW ROOFMOUNT SOLAR W/RELATED MATERIALS
T99CM04775 Final 10/06/1999 05/03/2000 COMBO REMODEL: FAMILY ROOM TO BEDROOM T99VL02540

Code Enforcement

Parcel Number - 138041870
Date - 10/07/2026 11:29 p.m.
Total Number Of Code Cases - 2
Case Number Case Status Entered Date Closed Date Unit Type Description
T08DV04855 Cancel 06/07/2008 N/A DNR_VIOL WEEDS IN ALLEY
T99VL02540 Complian 10/04/1999 N/A CODEVIOL COMPLAINT:NEW PLMBG.ELECT.MAJOR REMODEL NO PERMIT