Parcel Search: 138040730
Parcel Search
Parcel Attributes
| Parcel | 138040730 |
|---|---|
| Jurisdiction | Tucson, Pima County |
| City of Tucson Zoning | R-1 |
| Tucson Ward | Ward 1 |
| Tucson Registered Neighborhood | Elvira |
| Pima County Data | Assessor, Recorder, Treasurer, ... |
| Parcel Map | Map |
| Address | |
| Parcel Attributes Issue? | |
Annexations & Original City Zoning (OCZ)
Date - 11/20/2026 3:26 p.m.
Total Number Of OZC Plans - (1)
Permits
Parcel Number - 138040730
Date - 11/20/2026 3:26 p.m.
Total Number Of Permits - (42)
| Permit | Permit Status | Entered Date | Expired Date | Unit | Type | Description |
|---|---|---|---|---|---|---|
| TR-UTL-0423-01308 | Complete | 04/14/2023 | 07/23/2023 | Right-of-Way (ROW) - Utility | WO T70022. TEP WILL BE REPLACING 6 WOOD POLES WITH 6 NEW STEEL POLES. POLES WILL BE WITHIN 2' OF EXISTING POLES. | |
| TC-RES-0826-04800 | Complete | 08/27/2026 | 09/16/2027 | Residential Building - One or Two Family | Hunter Contracting will be using 1" White Aquapex for the new waterline service installation. Hunter will utilize 12ga Blue tracer lin. Hunter Plans to install the water service at a depth of 12-18 inches. | |
| TR-ROW-1223-01485 | Void | 12/29/2023 | N/A | Right-of-Way (ROW) | KE&G will be preforming milling and paving operations in the Barrio Nopal & Elvira neighborhoods including concrete work consisting of sidewalk and ADA ramps. | |
| TR-ROW-1223-01485 | Void | 12/29/2023 | N/A | BLDG 1 | Right-of-Way (ROW) | KE&G will be preforming milling and paving operations in the Barrio Nopal & Elvira neighborhoods including concrete work consisting of sidewalk and ADA ramps. |
| TR-ROW-1223-01485 | Void | 12/29/2023 | N/A | BLDG 1 UNIT 1 | Right-of-Way (ROW) | KE&G will be preforming milling and paving operations in the Barrio Nopal & Elvira neighborhoods including concrete work consisting of sidewalk and ADA ramps. |
| TR-ROW-1223-01485 | Void | 12/29/2023 | N/A | BLDG 1 UNIT 2 | Right-of-Way (ROW) | KE&G will be preforming milling and paving operations in the Barrio Nopal & Elvira neighborhoods including concrete work consisting of sidewalk and ADA ramps. |
| TR-ROW-1223-01485 | Void | 12/29/2023 | N/A | BLDG 2 | Right-of-Way (ROW) | KE&G will be preforming milling and paving operations in the Barrio Nopal & Elvira neighborhoods including concrete work consisting of sidewalk and ADA ramps. |
| TR-ROW-1223-01485 | Void | 12/29/2023 | N/A | BLDG 2 UNIT 1 | Right-of-Way (ROW) | KE&G will be preforming milling and paving operations in the Barrio Nopal & Elvira neighborhoods including concrete work consisting of sidewalk and ADA ramps. |
| TR-ROW-1223-01485 | Void | 12/29/2023 | N/A | BLDG 2 UNIT 2 | Right-of-Way (ROW) | KE&G will be preforming milling and paving operations in the Barrio Nopal & Elvira neighborhoods including concrete work consisting of sidewalk and ADA ramps. |
| TR-ROW-1223-01485 | Void | 12/29/2023 | N/A | BLDG 3 | Right-of-Way (ROW) | KE&G will be preforming milling and paving operations in the Barrio Nopal & Elvira neighborhoods including concrete work consisting of sidewalk and ADA ramps. |
| TR-ROW-1223-01485 | Void | 12/29/2023 | N/A | BLDG 3 UNIT 1 | Right-of-Way (ROW) | KE&G will be preforming milling and paving operations in the Barrio Nopal & Elvira neighborhoods including concrete work consisting of sidewalk and ADA ramps. |
| TR-ROW-1223-01485 | Void | 12/29/2023 | N/A | BLDG 3 UNIT 2 | Right-of-Way (ROW) | KE&G will be preforming milling and paving operations in the Barrio Nopal & Elvira neighborhoods including concrete work consisting of sidewalk and ADA ramps. |
| TR-ROW-1223-01485 | Void | 12/29/2023 | N/A | BLDG 4 | Right-of-Way (ROW) | KE&G will be preforming milling and paving operations in the Barrio Nopal & Elvira neighborhoods including concrete work consisting of sidewalk and ADA ramps. |
| TR-ROW-1223-01485 | Void | 12/29/2023 | N/A | BLDG 4 UNIT 1 | Right-of-Way (ROW) | KE&G will be preforming milling and paving operations in the Barrio Nopal & Elvira neighborhoods including concrete work consisting of sidewalk and ADA ramps. |
| TR-ROW-1223-01485 | Void | 12/29/2023 | N/A | BLDG 4 UNIT 2 | Right-of-Way (ROW) | KE&G will be preforming milling and paving operations in the Barrio Nopal & Elvira neighborhoods including concrete work consisting of sidewalk and ADA ramps. |
| TR-ROW-1223-01485 | Void | 12/29/2023 | N/A | UNIT 1 | Right-of-Way (ROW) | KE&G will be preforming milling and paving operations in the Barrio Nopal & Elvira neighborhoods including concrete work consisting of sidewalk and ADA ramps. |
| TR-ROW-1223-01485 | Void | 12/29/2023 | N/A | UNIT 101 | Right-of-Way (ROW) | KE&G will be preforming milling and paving operations in the Barrio Nopal & Elvira neighborhoods including concrete work consisting of sidewalk and ADA ramps. |
| TR-ROW-1223-01485 | Void | 12/29/2023 | N/A | UNIT 102 | Right-of-Way (ROW) | KE&G will be preforming milling and paving operations in the Barrio Nopal & Elvira neighborhoods including concrete work consisting of sidewalk and ADA ramps. |
| TR-ROW-1223-01485 | Void | 12/29/2023 | N/A | UNIT 103 | Right-of-Way (ROW) | KE&G will be preforming milling and paving operations in the Barrio Nopal & Elvira neighborhoods including concrete work consisting of sidewalk and ADA ramps. |
| TR-ROW-1223-01485 | Void | 12/29/2023 | N/A | UNIT 104 | Right-of-Way (ROW) | KE&G will be preforming milling and paving operations in the Barrio Nopal & Elvira neighborhoods including concrete work consisting of sidewalk and ADA ramps. |
| TR-ROW-1223-01485 | Void | 12/29/2023 | N/A | UNIT 1101 | Right-of-Way (ROW) | KE&G will be preforming milling and paving operations in the Barrio Nopal & Elvira neighborhoods including concrete work consisting of sidewalk and ADA ramps. |
| TR-ROW-1223-01485 | Void | 12/29/2023 | N/A | UNIT 1102 | Right-of-Way (ROW) | KE&G will be preforming milling and paving operations in the Barrio Nopal & Elvira neighborhoods including concrete work consisting of sidewalk and ADA ramps. |
| TR-ROW-1223-01485 | Void | 12/29/2023 | N/A | UNIT 1103 | Right-of-Way (ROW) | KE&G will be preforming milling and paving operations in the Barrio Nopal & Elvira neighborhoods including concrete work consisting of sidewalk and ADA ramps. |
| TR-ROW-1223-01485 | Void | 12/29/2023 | N/A | UNIT 1104 | Right-of-Way (ROW) | KE&G will be preforming milling and paving operations in the Barrio Nopal & Elvira neighborhoods including concrete work consisting of sidewalk and ADA ramps. |
| TR-ROW-1223-01485 | Void | 12/29/2023 | N/A | UNIT 1105 | Right-of-Way (ROW) | KE&G will be preforming milling and paving operations in the Barrio Nopal & Elvira neighborhoods including concrete work consisting of sidewalk and ADA ramps. |
| TR-ROW-1223-01485 | Void | 12/29/2023 | N/A | UNIT 2 | Right-of-Way (ROW) | KE&G will be preforming milling and paving operations in the Barrio Nopal & Elvira neighborhoods including concrete work consisting of sidewalk and ADA ramps. |
| TR-ROW-1223-01485 | Void | 12/29/2023 | N/A | UNIT 2102 | Right-of-Way (ROW) | KE&G will be preforming milling and paving operations in the Barrio Nopal & Elvira neighborhoods including concrete work consisting of sidewalk and ADA ramps. |
| TR-ROW-1223-01485 | Void | 12/29/2023 | N/A | UNIT 2103 | Right-of-Way (ROW) | KE&G will be preforming milling and paving operations in the Barrio Nopal & Elvira neighborhoods including concrete work consisting of sidewalk and ADA ramps. |
| TR-ROW-1223-01485 | Void | 12/29/2023 | N/A | UNIT 2105 | Right-of-Way (ROW) | KE&G will be preforming milling and paving operations in the Barrio Nopal & Elvira neighborhoods including concrete work consisting of sidewalk and ADA ramps. |
| TR-ROW-1223-01485 | Void | 12/29/2023 | N/A | UNIT 3 | Right-of-Way (ROW) | KE&G will be preforming milling and paving operations in the Barrio Nopal & Elvira neighborhoods including concrete work consisting of sidewalk and ADA ramps. |
| TR-ROW-1223-01485 | Void | 12/29/2023 | N/A | UNIT 3103 | Right-of-Way (ROW) | KE&G will be preforming milling and paving operations in the Barrio Nopal & Elvira neighborhoods including concrete work consisting of sidewalk and ADA ramps. |
| TR-ROW-1223-01485 | Void | 12/29/2023 | N/A | UNIT 3104 | Right-of-Way (ROW) | KE&G will be preforming milling and paving operations in the Barrio Nopal & Elvira neighborhoods including concrete work consisting of sidewalk and ADA ramps. |
| TR-ROW-1223-01485 | Void | 12/29/2023 | N/A | UNIT 3105 | Right-of-Way (ROW) | KE&G will be preforming milling and paving operations in the Barrio Nopal & Elvira neighborhoods including concrete work consisting of sidewalk and ADA ramps. |
| TR-ROW-1223-01485 | Void | 12/29/2023 | N/A | UNIT 4 | Right-of-Way (ROW) | KE&G will be preforming milling and paving operations in the Barrio Nopal & Elvira neighborhoods including concrete work consisting of sidewalk and ADA ramps. |
| TR-ROW-1223-01485 | Void | 12/29/2023 | N/A | UNIT 5 | Right-of-Way (ROW) | KE&G will be preforming milling and paving operations in the Barrio Nopal & Elvira neighborhoods including concrete work consisting of sidewalk and ADA ramps. |
| TR-ROW-1223-01485 | Void | 12/29/2023 | N/A | UNIT 6 | Right-of-Way (ROW) | KE&G will be preforming milling and paving operations in the Barrio Nopal & Elvira neighborhoods including concrete work consisting of sidewalk and ADA ramps. |
| TR-ROW-1223-01485 | Void | 12/29/2023 | N/A | UNIT 7 | Right-of-Way (ROW) | KE&G will be preforming milling and paving operations in the Barrio Nopal & Elvira neighborhoods including concrete work consisting of sidewalk and ADA ramps. |
| TR-ROW-1223-01485 | Void | 12/29/2023 | N/A | UNIT 8 | Right-of-Way (ROW) | KE&G will be preforming milling and paving operations in the Barrio Nopal & Elvira neighborhoods including concrete work consisting of sidewalk and ADA ramps. |
| TR-ROW-1223-01485 | Void | 12/29/2023 | N/A | UNIT M1 | Right-of-Way (ROW) | KE&G will be preforming milling and paving operations in the Barrio Nopal & Elvira neighborhoods including concrete work consisting of sidewalk and ADA ramps. |
| TR-ROW-1223-01485 | Void | 12/29/2023 | N/A | UNIT M2 | Right-of-Way (ROW) | KE&G will be preforming milling and paving operations in the Barrio Nopal & Elvira neighborhoods including concrete work consisting of sidewalk and ADA ramps. |
| T14CM08288 | Final | 12/05/2014 | 06/07/2016 | COMBO | FIRE DAMAGE REPAIR - T14DV09480 | |
| T20CM04993 | Final | 08/03/2020 | 04/17/2021 | COMBO | Existing; MPU=200A WITH NEW SOLAR PHOTOVOLTAIC SYSTEM |
Code Enforcement
Parcel Number - 138040730
Date - 11/20/2026 3:26 p.m.
Total Number Of Code Cases - 1
| Case Number | Case Status | Entered Date | Closed Date | Unit | Type | Description |
|---|---|---|---|---|---|---|
| T14DV09480 | Complian | 11/17/2014 | N/A | DNR_VIOL | RESIDENTIAL FIRE |