Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Parcel Search

 
Parcel Attributes
Parcel137060950
JurisdictionTucson
City of Tucson ZoningC-2
Tucson WardWard 5
Tucson Registered NeighborhoodSunnyside
Major Streets & Routes

Arterial or Collector

Pima County Data Assessor, Recorder, Treasurer, ...
Parcel Map Map
Addresses

Annexations & Original City Zoning (OCZ)

Date - 11/27/2024 7:32 a.m.
Total Number Of OZC Plans - (1)
Plan Description Annexation Ordinance Effective Date OCZ Ordinance
C9-60-39 West To Silverbell Road And South To San Xavier Indian Reservation 2014 03/18/1960 2045

Special Development Requests & Requirements

Date - 11/27/2024 7:32 a.m.
Total Number Of Special Development Permits - (1)
Activity Number Status Apply Date Expired Date Type Description
H000013184 Closed N/A

Permits

Parcel Number - 137060950
Date - 11/27/2024 7:32 a.m.
Total Number Of Permits - (13)
Permit Permit Status Entered Date Expired Date Unit Type Description
TR-ROW-0923-01115 Complete 09/05/2023 03/02/2024 Right-of-Way (ROW) AIR-VACUUM EXCAVATION OF TWELVE UTILITY POTHOLES APPROXIMATELY 12" IN SIZE FOR THE DESIGN PHASE OF 12TH AVENUE IMPROVEMENT PROJECT: DREXEL ROAD TO OKLAHOMA ST. GREEN STORMWATER INFRASTRUCTURE IMPROVEMENTS
TR-ROW-0923-01115 Complete 09/05/2023 03/02/2024 UNIT 1 Right-of-Way (ROW) AIR-VACUUM EXCAVATION OF TWELVE UTILITY POTHOLES APPROXIMATELY 12" IN SIZE FOR THE DESIGN PHASE OF 12TH AVENUE IMPROVEMENT PROJECT: DREXEL ROAD TO OKLAHOMA ST. GREEN STORMWATER INFRASTRUCTURE IMPROVEMENTS
TR-ROW-0923-01115 Complete 09/05/2023 03/02/2024 UNIT 105 Right-of-Way (ROW) AIR-VACUUM EXCAVATION OF TWELVE UTILITY POTHOLES APPROXIMATELY 12" IN SIZE FOR THE DESIGN PHASE OF 12TH AVENUE IMPROVEMENT PROJECT: DREXEL ROAD TO OKLAHOMA ST. GREEN STORMWATER INFRASTRUCTURE IMPROVEMENTS
TR-ROW-0923-01115 Complete 09/05/2023 03/02/2024 UNIT 125 Right-of-Way (ROW) AIR-VACUUM EXCAVATION OF TWELVE UTILITY POTHOLES APPROXIMATELY 12" IN SIZE FOR THE DESIGN PHASE OF 12TH AVENUE IMPROVEMENT PROJECT: DREXEL ROAD TO OKLAHOMA ST. GREEN STORMWATER INFRASTRUCTURE IMPROVEMENTS
TR-ROW-0923-01115 Complete 09/05/2023 03/02/2024 UNIT 2 Right-of-Way (ROW) AIR-VACUUM EXCAVATION OF TWELVE UTILITY POTHOLES APPROXIMATELY 12" IN SIZE FOR THE DESIGN PHASE OF 12TH AVENUE IMPROVEMENT PROJECT: DREXEL ROAD TO OKLAHOMA ST. GREEN STORMWATER INFRASTRUCTURE IMPROVEMENTS
TR-ROW-0923-01115 Complete 09/05/2023 03/02/2024 UNIT 3 Right-of-Way (ROW) AIR-VACUUM EXCAVATION OF TWELVE UTILITY POTHOLES APPROXIMATELY 12" IN SIZE FOR THE DESIGN PHASE OF 12TH AVENUE IMPROVEMENT PROJECT: DREXEL ROAD TO OKLAHOMA ST. GREEN STORMWATER INFRASTRUCTURE IMPROVEMENTS
TR-ROW-0923-01115 Complete 09/05/2023 03/02/2024 UNIT 4 Right-of-Way (ROW) AIR-VACUUM EXCAVATION OF TWELVE UTILITY POTHOLES APPROXIMATELY 12" IN SIZE FOR THE DESIGN PHASE OF 12TH AVENUE IMPROVEMENT PROJECT: DREXEL ROAD TO OKLAHOMA ST. GREEN STORMWATER INFRASTRUCTURE IMPROVEMENTS
TR-ROW-0923-01115 Complete 09/05/2023 03/02/2024 UNIT 5 Right-of-Way (ROW) AIR-VACUUM EXCAVATION OF TWELVE UTILITY POTHOLES APPROXIMATELY 12" IN SIZE FOR THE DESIGN PHASE OF 12TH AVENUE IMPROVEMENT PROJECT: DREXEL ROAD TO OKLAHOMA ST. GREEN STORMWATER INFRASTRUCTURE IMPROVEMENTS
T21CM08953 Issued 11/17/2021 05/28/2023 Commercial Building Watermill Express Unit Replacement
DP21-0314 Issued 11/22/2021 11/21/2026 Development Package Site - Watermill Express. Kiosk replacement.
T18CM02323 Withdrwn 03/28/2018 N/A COMBO REPAIR SEWER LINE
T18RW01443 Final 03/28/2018 05/02/2018 ROW CUTTING AND REPLACING SIDEWALK TO REPOAR SEWER LINE. 6' IN PAVEMENT OFF OF ALASKA STREET.
T18RW01837 Final 04/23/2018 06/23/2018 ROW CUTTING AND REPLACING SIDEWALK TO REPAIR 4' SEWER LINE