Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Parcel Search: 13705293A
Parcel Search
Annexations & Original City Zoning (OCZ)
Date - 11/27/2024 7:39 a.m.
Total Number Of OZC Plans - (1)
Permits
Parcel Number - 13705293A
Date - 11/27/2024 7:39 a.m.
Total Number Of Permits - (12)
Permit | Permit Status | Entered Date | Expired Date | Unit | Type | Description |
---|---|---|---|---|---|---|
DP12-0144 | Complete | 08/29/2012 | 12/12/2021 | Development Package | SITE PLAN FOR TEMPORARY CARPORT | |
TR-ROW-0923-01115 | Complete | 09/05/2023 | 03/02/2024 | Right-of-Way (ROW) | AIR-VACUUM EXCAVATION OF TWELVE UTILITY POTHOLES APPROXIMATELY 12" IN SIZE FOR THE DESIGN PHASE OF 12TH AVENUE IMPROVEMENT PROJECT: DREXEL ROAD TO OKLAHOMA ST. GREEN STORMWATER INFRASTRUCTURE IMPROVEMENTS | |
TR-ROW-0923-01115 | Complete | 09/05/2023 | 03/02/2024 | UNIT 1 | Right-of-Way (ROW) | AIR-VACUUM EXCAVATION OF TWELVE UTILITY POTHOLES APPROXIMATELY 12" IN SIZE FOR THE DESIGN PHASE OF 12TH AVENUE IMPROVEMENT PROJECT: DREXEL ROAD TO OKLAHOMA ST. GREEN STORMWATER INFRASTRUCTURE IMPROVEMENTS |
TR-ROW-0923-01115 | Complete | 09/05/2023 | 03/02/2024 | UNIT 105 | Right-of-Way (ROW) | AIR-VACUUM EXCAVATION OF TWELVE UTILITY POTHOLES APPROXIMATELY 12" IN SIZE FOR THE DESIGN PHASE OF 12TH AVENUE IMPROVEMENT PROJECT: DREXEL ROAD TO OKLAHOMA ST. GREEN STORMWATER INFRASTRUCTURE IMPROVEMENTS |
TR-ROW-0923-01115 | Complete | 09/05/2023 | 03/02/2024 | UNIT 125 | Right-of-Way (ROW) | AIR-VACUUM EXCAVATION OF TWELVE UTILITY POTHOLES APPROXIMATELY 12" IN SIZE FOR THE DESIGN PHASE OF 12TH AVENUE IMPROVEMENT PROJECT: DREXEL ROAD TO OKLAHOMA ST. GREEN STORMWATER INFRASTRUCTURE IMPROVEMENTS |
TR-ROW-0923-01115 | Complete | 09/05/2023 | 03/02/2024 | UNIT 2 | Right-of-Way (ROW) | AIR-VACUUM EXCAVATION OF TWELVE UTILITY POTHOLES APPROXIMATELY 12" IN SIZE FOR THE DESIGN PHASE OF 12TH AVENUE IMPROVEMENT PROJECT: DREXEL ROAD TO OKLAHOMA ST. GREEN STORMWATER INFRASTRUCTURE IMPROVEMENTS |
TR-ROW-0923-01115 | Complete | 09/05/2023 | 03/02/2024 | UNIT 3 | Right-of-Way (ROW) | AIR-VACUUM EXCAVATION OF TWELVE UTILITY POTHOLES APPROXIMATELY 12" IN SIZE FOR THE DESIGN PHASE OF 12TH AVENUE IMPROVEMENT PROJECT: DREXEL ROAD TO OKLAHOMA ST. GREEN STORMWATER INFRASTRUCTURE IMPROVEMENTS |
TR-ROW-0923-01115 | Complete | 09/05/2023 | 03/02/2024 | UNIT 4 | Right-of-Way (ROW) | AIR-VACUUM EXCAVATION OF TWELVE UTILITY POTHOLES APPROXIMATELY 12" IN SIZE FOR THE DESIGN PHASE OF 12TH AVENUE IMPROVEMENT PROJECT: DREXEL ROAD TO OKLAHOMA ST. GREEN STORMWATER INFRASTRUCTURE IMPROVEMENTS |
TR-ROW-0923-01115 | Complete | 09/05/2023 | 03/02/2024 | UNIT 5 | Right-of-Way (ROW) | AIR-VACUUM EXCAVATION OF TWELVE UTILITY POTHOLES APPROXIMATELY 12" IN SIZE FOR THE DESIGN PHASE OF 12TH AVENUE IMPROVEMENT PROJECT: DREXEL ROAD TO OKLAHOMA ST. GREEN STORMWATER INFRASTRUCTURE IMPROVEMENTS |
T12CM02728 | L of c | 05/15/2012 | 05/17/2015 | COMBO | 40' X 40' CARPORT | |
T19FO01060 | Final | 12/02/2019 | 01/30/2021 | FIREOPER | REPAIR GARAGE | |
T20FO00063 | Final | 01/22/2020 | 02/10/2021 | FIREOPER | EL TINGON TIRE SHOP - HOT WORKS |
Code Enforcement
Parcel Number - 13705293A
Date - 11/27/2024 7:39 a.m.
Total Number Of Code Cases - 2
Case Number | Case Status | Entered Date | Closed Date | Unit | Type | Description |
---|---|---|---|---|---|---|
CE-VIO0623-04108 | Closed - resolved | 06/16/2023 | 06/22/2023 | Code Enforcement Case | DIVERSION (W1) - ZCOM- always parks their vehicles by the water hydrant and obstructs the view coming out of the street. The vehicles belong to the tire shop as they have trailers attached with tires. | |
T15DV05378 | Complian | 07/21/2015 | N/A | DNR_VIOL | (El Tingon Tire Shop): 1 oversized portable sign & one banner tied to chain-link fence. |