Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Parcel Search

 
Parcel Attributes
Parcel137040430
JurisdictionTucson
City of Tucson ZoningR-2
Tucson WardWard 5
Tucson Registered NeighborhoodSunnyside
Pima County Data Assessor, Recorder, Treasurer, ...
Parcel Map Map
Address

Annexations & Original City Zoning (OCZ)

Date - 11/14/2024 11:11 p.m.
Total Number Of OZC Plans - (1)
Plan Description Annexation Ordinance Effective Date OCZ Ordinance
C9-60-39 West To Silverbell Road And South To San Xavier Indian Reservation 2014 03/18/1960 2045

Permits

Parcel Number - 137040430
Date - 11/14/2024 11:11 p.m.
Total Number Of Permits - (5)
Permit Permit Status Entered Date Expired Date Unit Type Description
TC-RES-1023-08742 Complete 10/12/2023 10/29/2024 Residential Building - One or Two Family Installation of new Private water service line from the Meter to 10' outside of the house (house Connection) part of Rodeo addition phase 2 TW project. The water line will be a 1-inch pex, buried at 14 inches. 12awg tracer wire will be taped to the pex every ten ft. from the new meter to the tie-in point. The new 5/8 meter will have a 1-inch meter valve installed on the customer's side.
TR-ROW-1222-00169 Complete 12/19/2022 02/04/2023 Right-of-Way (ROW) Air-Vacuum Excavation of 42 Utility Potholes approximately 12"x12" in size for the design phase of Tucson Water Project CIP No W961 Rodeo Addition Main Replacement Phase 2
TR-ROW-1222-00169 Complete 12/19/2022 02/04/2023 UNIT 1 Right-of-Way (ROW) Air-Vacuum Excavation of 42 Utility Potholes approximately 12"x12" in size for the design phase of Tucson Water Project CIP No W961 Rodeo Addition Main Replacement Phase 2
TR-ROW-1222-00169 Complete 12/19/2022 02/04/2023 UNIT 2 Right-of-Way (ROW) Air-Vacuum Excavation of 42 Utility Potholes approximately 12"x12" in size for the design phase of Tucson Water Project CIP No W961 Rodeo Addition Main Replacement Phase 2
T16CM01760 Final 03/07/2016 11/13/2016 COMBO ADD PHOTOVOLTAIC SYSTEM AND ASSOCIATED EQUIPMENT