Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Parcel Search

 
Parcel Attributes
Parcel137031410
JurisdictionTucson
City of Tucson ZoningR-2
Tucson WardWard 5
Tucson Registered NeighborhoodSunnyside
Major Streets & Routes

Arterial or Collector

Pima County Data Assessor, Recorder, Treasurer, ...
Parcel Map Map
Address

Annexations & Original City Zoning (OCZ)

Date - 11/14/2024 11:07 p.m.
Total Number Of OZC Plans - (1)
Plan Description Annexation Ordinance Effective Date OCZ Ordinance
C9-60-39 West To Silverbell Road And South To San Xavier Indian Reservation 2014 03/18/1960 2045

Special Development Requests & Requirements

Date - 11/14/2024 11:07 p.m.
Total Number Of Special Development Permits - (1)
Activity Number Status Apply Date Expired Date Type Description
H000011932 Closed N/A

Permits

Parcel Number - 137031410
Date - 11/14/2024 11:07 p.m.
Total Number Of Permits - (4)
Permit Permit Status Entered Date Expired Date Unit Type Description
TC-RES-1023-08654 Complete 10/10/2023 12/15/2024 Residential Building - One or Two Family Installation of new Private water service line from the Meter to 10' outside of the house (house Connection) part of Rodeo addition phase 2 TW project
TR-ROW-1222-00169 Complete 12/19/2022 02/04/2023 Right-of-Way (ROW) Air-Vacuum Excavation of 42 Utility Potholes approximately 12"x12" in size for the design phase of Tucson Water Project CIP No W961 Rodeo Addition Main Replacement Phase 2
TR-ROW-1222-00169 Complete 12/19/2022 02/04/2023 UNIT 1 Right-of-Way (ROW) Air-Vacuum Excavation of 42 Utility Potholes approximately 12"x12" in size for the design phase of Tucson Water Project CIP No W961 Rodeo Addition Main Replacement Phase 2
TR-ROW-1222-00169 Complete 12/19/2022 02/04/2023 UNIT 2 Right-of-Way (ROW) Air-Vacuum Excavation of 42 Utility Potholes approximately 12"x12" in size for the design phase of Tucson Water Project CIP No W961 Rodeo Addition Main Replacement Phase 2