Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Parcel Search: 13630138B
Parcel Search
Permits
Parcel Number - 13630138B
Date - 02/07/2025 3:04 p.m.
Total Number Of Permits - (47)
Permit | Permit Status | Entered Date | Expired Date | Unit | Type | Description |
---|---|---|---|---|---|---|
T21CM01650 | Expired | 02/24/2021 | 05/17/2022 | Residential Building - One or Two Family | SFR BT1740 T19-M0132 | |
T21CM02411 | Expired | 03/17/2021 | 06/11/2022 | Residential Building - One or Two Family | SFR BT2013 T19-M0134 | |
T21CM02509 | Expired | 03/19/2021 | 07/03/2022 | Residential Building - One or Two Family | SFR BT1740 T19-M0132 | |
T21RW03409 | Complete | 07/20/2021 | 08/19/2021 | Right-of-Way (ROW) | DRIVEWAY / SIDEWALK APRON PERMIT @ 4O LF.,BELLA TIERRA LOT 97TRAFFIC CONTROL ASSOCIATED WITH R; Work Order: PLAN: 1465 C | |
T22CM05558 | Issued | 07/21/2022 | 05/02/2023 | Residential Building - One or Two Family | R - Installation of a new roof mounted 12.800kw solar PV system. | |
T21BU00111 | Issued | 03/01/2021 | 11/23/2021 | WALL/FEN | 50 l.f, of 3ft 4 inch high retainer with 5ft high wall on top | |
T21CM00620 | Final | 01/21/2021 | 02/22/2022 | COMBO | SFR KBHO146519 T19-M0156 | |
T21CM00623 | Final | 01/21/2021 | 02/22/2022 | COMBO | SFR KBHO146519 T19-M0156 | |
T21CM00624 | Final | 01/21/2021 | 02/22/2022 | COMBO | SFR KBHO146519 T19-M0156 | |
T21CM00627 | Final | 01/21/2021 | 03/23/2022 | COMBO | SFR BT2685 T19-M0133 | |
T21CM00633 | Final | 01/21/2021 | 03/27/2022 | COMBO | SFR BT1740 T19-M0132 | |
T21CM01239 | Final | 02/10/2021 | 04/25/2022 | COMBO | SFR KBHO146519 T19-M0156 | |
T21CM01240 | C of o | 02/11/2021 | 04/10/2022 | COMBO | SFR BT2013 T19-M0134 | |
T21CM01241 | Final | 02/11/2021 | 04/18/2022 | COMBO | SFR KBHO123819 T19-M0155 | |
T21CM01256 | Final | 02/11/2021 | 05/28/2022 | COMBO | SFR KBHO1842A19 T19-M0157 | |
T21CM01318 | Final | 02/16/2021 | 05/29/2022 | COMBO | SFR BT2013 T19-M0134 | |
T21CM01324 | Final | 02/16/2021 | 05/23/2022 | COMBO | SFR KBHO1842A19 T19-M0157 | |
T21CM01350 | Final | 02/17/2021 | 05/01/2022 | COMBO | SFR KBHO146519 T19-M0156 | |
T21CM01351 | Final | 02/17/2021 | 04/16/2022 | COMBO | SFR KBHO123819 T19-M0155 | |
T21CM01356 | Final | 02/17/2021 | 04/25/2022 | COMBO | SFR KBHO1842A19 T19-M0157 | |
T21CM01359 | Final | 02/17/2021 | 04/27/2022 | COMBO | SFR BT1740 T19-M0132 | |
T21CM01362 | Final | 02/17/2021 | 05/23/2022 | COMBO | SFR KBHO259119 T19-M0154 | |
T21CM01411 | Final | 02/18/2021 | 05/16/2022 | COMBO | SFR KBHO146519 T19-M0156 | |
T21CM01649 | Final | 02/24/2021 | 05/14/2022 | COMBO | SFR KBHO146519 T19-M0156 | |
T21CM02067 | Final | 03/09/2021 | 05/25/2022 | COMBO | SFR KBHO1842A19 T19-M0157 | |
T21CM02395 | Final | 03/17/2021 | 07/11/2022 | COMBO | SFR BT2685 T19-M0133 | |
T21CM02464 | Final | 03/18/2021 | 05/21/2022 | COMBO | SFR KBHO123819 T19-M0155 | |
T21CM02465 | Final | 03/18/2021 | 05/28/2022 | COMBO | SFR BT2013 T19-M0134 | |
T21CM02803 | Final | 03/30/2021 | 06/20/2022 | COMBO | SFR KBHO1842A19 T19-M0157 | |
T21CM03029 | Final | 04/08/2021 | 06/27/2022 | COMBO | SFR BT1740 T19-M0132 | |
T21CM03030 | Final | 04/08/2021 | 06/26/2022 | COMBO | SFR BT2013 T19-M0134 | |
T21CM03031 | Final | 04/08/2021 | 06/26/2022 | COMBO | SFR KBHO1842A19 T19-M0157 | |
T21CM07617 | Final | 09/22/2021 | 05/02/2022 | COMBO | Installation of a roof mounted 5.920kW Photovoltaic System | |
T21CM09825 | Final | 12/22/2021 | 08/14/2022 | COMBO | Installation of a roof mounted 8.295kW Photovoltaic System | |
T21RW03192 | Final | 07/01/2021 | 07/31/2021 | ROW | DRIVEWAY / SIDEWALK APRON PERMIT @ 40 LF., BELLA TIERRA LOT 99. TRAFFIC CONTROL ASSOCIATED WITH ROW# T21RW03191 | |
T21RW03408 | Final | 07/20/2021 | 08/19/2021 | ROW | DRIVEWAY / SIDEWALK APRON PERMIT @ 4O LF., BELLA TIERRA LOT 96 TRAFFIC CONTROL ASSOCIATED WITH ROW # T21RWO3409 | |
T21RW04391 | Final | 09/23/2021 | 10/24/2021 | ROW | INSTALL 40 LF 5' SIDEWALK AND DRIVEWAY APRON PER PAG SD'S 200 AND 206 BELLA TIERRA LOT 34 TRAFFIC CONTROL ASSOCIATED WITH T21RW04390 ** PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING. | |
T21RW04393 | Final | 09/23/2021 | 10/24/2021 | ROW | INSTALL 40 LF 5' SIDEWALK AND DRIVEWAY APRON PER PAG SD'S 200 AND 206 BELLA TIERRA LOT 37 TRAFFIC CONTROL ASSOCIATED WITH PERMIT T21RW04390 ** PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING. | |
T21RW04394 | Final | 09/23/2021 | 10/24/2021 | ROW | INSTALL 40 LF 5' SIDEWALK AND DRIVEWAY APRON PER PAG SD'S 200 AND 206 BELLA TIERRA LOT 38 TRAFFIC CONTROL ASSOCIATED WITH PERMIT T21RW04390 ** PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING. | |
T21RW04395 | Final | 09/23/2021 | 10/24/2021 | ROW | INSTALL 40 LF 5' SIDEWALK AND DRIVEWAY APRON PER PAG SD'S 200 AND 206 BELLA TIERRA LOT 39 TRAFFIC CONTROL ASSOCIATED WITH PERMIT T21RW04390 ** PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING. | |
T21RW04396 | Final | 09/23/2021 | 10/24/2021 | ROW | INSTALL 40 LF 5' SIDEWALK AND DRIVEWAY APRON PER PAG SD'S 200 AND 206 BELLA TIERRA LOT 40 TRAFFIC CONTROL ASSOCIATED WITH PERMIT T21RW04390 ** PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING. | |
T21RW04397 | Final | 09/23/2021 | 10/24/2021 | ROW | INSTALL 40 LF 5' SIDEWALK AND DRIVEWAY APRON PER PAG SD'S 200 AND 206 BELLA TIERRA LOT 41 TRAFFIC CONTROL ASSOCIATED WITH PERMIT T21RW04390 ** PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING. | |
T21RW04483 | Final | 09/29/2021 | 10/29/2021 | ROW | INSTALL 40 LF 5' SIDEWALK AND DRIVEWAY APRON PER PAG SD'S 200 AND 206 BELLA TIERRA LOT 32 TRAFFIC CONTROL ASSOCIATED WITH PERMIT T21RW04391 ** PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING. | |
T21RW04484 | Final | 09/29/2021 | 10/29/2021 | ROW | INSTALL 40 LF 5' SIDEWALK AND DRIVEWAY APRON PER PAG SD'S 200 AND 206 BELLA TIERRA LOT 33 TRAFFIC CONTROL ASSOCIATED WITH PERMIT T21RW04391 ** PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING. | |
T21RW05214 | Final | 12/08/2021 | 01/12/2022 | ROW | INSTALL 40 LF 5' SIDEWALK AND DRIVEWAY APRON PER PAG SD'S 200 AND 206 BELLA TIERRA - LOT 95 TRAFFIC CONTROL ASSOCIATED WITH PERMIT T21RW05212 ** PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING. | |
T22CM00354 | Final | 01/18/2022 | 08/29/2022 | COMBO | Rooftop PV Solar | |
T22RW01364 | Final | 04/06/2022 | 05/25/2022 | ROW | INSTALL 40 LF 5' SIDEWALK AND DRIVEWAY APRON PER PAG SD'S 200 AND 206 BELLA TIERRA - LOT 138 - 8728 E PEBBLE STONE LANE |
Code Enforcement
Parcel Number - 13630138B
Date - 02/07/2025 3:04 p.m.
Total Number Of Code Cases - 1
Case Number | Case Status | Entered Date | Closed Date | Unit | Type | Description |
---|---|---|---|---|---|---|
T21DV00989 | Noverify | 02/22/2021 | N/A | DNR_VIOL | construction debris blowing into surronding completed neighborhoods. |