Parcel Search: 136142070
Parcel Search
Parcel Attributes
| Parcel | 136142070 |
|---|---|
| Jurisdiction | Tucson, Pima County |
| City of Tucson Zoning | R-1 |
| Tucson Ward | Ward 4 |
| Major Street & Route | Arterial or Collector |
| Pima County Data | Assessor, Recorder, Treasurer, ... |
| Parcel Map | Map |
| Address | |
| Parcel Attributes Issue? | |
Annexations & Original City Zoning (OCZ)
Date - 08/06/2026 4:52 a.m.
Total Number Of OZC Plans - (1)
Rezoning Cases
Date - 08/06/2026 4:52 a.m.
Total Number Of Rezone Cases - (1)
| Case No. | Description | New Zone | Status | Status Date | Address |
|---|---|---|---|---|---|
| C9-01-11 | Sunny Day Investments - Stella | R-1 | Effectuated | 03/03/2006 | 3231 S LAKESIDE VIEW |
Permits
Parcel Number - 136142070
Date - 08/06/2026 4:52 a.m.
Total Number Of Permits - (6)
| Permit | Permit Status | Entered Date | Expired Date | Unit | Type | Description |
|---|---|---|---|---|---|---|
| TR-UTL-0225-00276 | Complete | 02/13/2025 | 06/03/2025 | Right-of-Way (ROW) - Utility | P.067197D (KAHNA) - Previously approved/expiring permit TR-UTL-0824-01437 - BORE 4,372' & TRENCH 98’ TO PLACE CTL CONDUIT & FIBER CABLE. PLACE (27) HANDHOLES & (8) PEDESTALS. | |
| TR-UTL-0824-01437 | Complete | 08/01/2024 | 02/16/2025 | Right-of-Way (ROW) - Utility | P.067197D (KAHNA) – BORE 4,372' & TRENCH 98’ TO PLACE CTL CONDUIT & FIBER CABLE. PLACE (27) HANDHOLES & (8) PEDESTALS. | |
| T07BU00010 | Withdrwn | 01/03/2007 | N/A | TEMP-FBB | TEMP SALES TRAILER - HANDICAP RAMP | |
| T07BU00177 | Final | 01/24/2007 | 01/14/2008 | WALL/FEN | WALL:RETAINING 23 LF OF 42" W/5' ON TOP | |
| T07CM00155 | Final | 01/10/2007 | 09/24/2007 | COMBO | TEMP CONSTRUCTION TRAILER & RAMP | |
| T09CM01154 | C of o | 05/07/2009 | 02/22/2010 | COMBO | NEW:SFR TJBE081617 T08-M0101 |
Plans
Parcel Number - 136142070
Date - 08/06/2026 4:52 a.m.
Total Number Of Plans - 1
| Plan Number | Plan Status | Application Date | Expired Date | Unit | Type | Description |
|---|---|---|---|---|---|---|
| C9-01-11 | Effected | 03/03/2006 | N/A | REZONING PROCEDURES | The preliminary development plan proposes a 68-lot single-family subdivision utilizing the residential cluster project (RCP) option. |