Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Parcel Search: 13507439B
Parcel Search
Annexations & Original City Zoning (OCZ)
Date - 03/04/2025 3:16 p.m.
Total Number Of OZC Plans - (2)
Rezoning Cases
Date - 03/04/2025 3:16 p.m.
Total Number Of Rezone Cases - (1)
Case No. | Description | New Zone | Status | Status Date | Address |
---|---|---|---|---|---|
C9-85-95 | 141 - 22nd St - Pantano Pwky | height limitation of 35 feet | Effectuated | 08/11/2012 | S PANTANO |
Special Development Requests & Requirements
Date - 03/04/2025 3:16 p.m.
Total Number Of Special Development Permits - (1)
Activity Number | Status | Apply Date | Expired Date | Type | Description |
---|---|---|---|---|---|
H000009452 | Closed | N/A |
Permits
Parcel Number - 13507439B
Date - 03/04/2025 3:16 p.m.
Total Number Of Permits - (26)
Permit | Permit Status | Entered Date | Expired Date | Unit | Type | Description |
---|---|---|---|---|---|---|
TC-COM-0225-00330 | In review | 02/17/2025 | N/A | Commercial Building | Coffee Wow Phase 2: Updated equipment and millwork to existing coffee bar. Installation of new drain manifold serving the coffee bar. Added dedicated water line and circuit for coffee wow auto clean system. Add glycol chiller and nitrogen generator for nitro coffee. | |
TR-UTL-0424-00740 | Complete | 04/08/2024 | 08/21/2024 | Right-of-Way (ROW) - Utility | PRJ268376-1 COX TO OVERLASH 1,561' OF AERIAL FIBER, AND TO PULL FIBER THROUGH 387' OF EXISTING CONDUIT FOR CATV SERVICE. | |
D09-0015 | Approved | 04/21/2009 | N/A | Development Package | QUIKTRIP STORE 1460Originally approved 9/30/2009 | |
TS-PRM-0624-00247 | Issued | 06/03/2024 | 12/04/2024 | Sign - Permanent | Remove the existing manual price changer and install new LED Electronic price changer as per attached artwork | |
DS09-22 | Approved | 07/24/2009 | N/A | Zoning Compliance | 1250 S PANTANO RD - 1250 S PANTANO - DS 2-09-4.1 & DS 3-01.3.0 | |
TC-COM-0823-01973 | Complete | 08/14/2023 | 10/12/2024 | Commercial Building | Coffee Wow Phase 1: Equipment and millwork modifications to existing coffee bar and lid bar. | |
T09AN00220 | Issued | 04/20/2009 | N/A | ADDRNEW | ||
T09CM03298 | Final | 12/15/2009 | 08/15/2010 | COMBO | TEMPORARY CONSTRUCTION TRAILER | |
T09EX00694 | Closed | 12/15/2009 | 02/13/2010 | EXCAV | EXCAVATION, BACKFILL & ALL SURFACE REPAIR PER CITY STANDARDS FOR CONSTRUCTING OFFSITE IMPROVEMENTS PER APPROVED SITE DEVELOPMENT PLAN D09-0015.0 | |
T10BU00099 | Final | 01/20/2010 | 10/12/2010 | SPKLR | INSTALL 65 NEW FIRE SPRINKLER HEADS. | |
T10BU00101 | Final | 01/21/2010 | 08/29/2010 | SPKLR | Install 197' of 6" underground | |
T10BU00561 | Final | 04/08/2010 | 10/05/2010 | WALL/FEN | SCREEN WALL 45'' HIGH 18"LF | |
T10BU00600 | Final | 04/14/2010 | 10/12/2010 | BUILD | INST NEW FIRE ALARM SYSTEM | |
T10EX00039 | Closed | 02/03/2010 | 04/04/2010 | EXCAV | TRENCH 10'D (INSTALL FIRE SERVICE, WATER SERVICE AND FIRE HYDRANT) | |
T10OT00132 | Final | 01/19/2010 | 07/20/2010 | SIGN | 17797 | |
T10OT00196 | Final | 01/27/2010 | 10/13/2010 | SIGN | 17835 | |
T10OT00431 | Final | 02/24/2010 | 10/20/2010 | SIGN | 17974 | |
T10OT00694 | Final | 03/30/2010 | 10/20/2010 | SIGN | 18116 (1) NON ILLUM. PROJECT ID SIGN | |
T13CM06261 | Final | 10/11/2013 | 02/10/2018 | COMBO | TI: RETAIL | |
T14BU00283 | Final | 03/13/2014 | 09/14/2014 | SPKLR | Add 3, relocate 3 fire sprinklers | |
T14OT00039 | Final | 01/08/2014 | 01/19/2015 | SIGN | RETO W/ LED / SHRINK PRICE CHANGER / ADD PANEL | |
T16CM05105 | Final | 06/30/2016 | 12/03/2017 | COMBO | TI: CONVENIENCE STORE | |
T17RW04888 | Final | 11/02/2017 | 12/10/2017 | ROW | CITY OF TUCSON MEDIAN PALM CARE | |
T18FC00637 | Final | 08/02/2018 | 01/03/2020 | FIRECONS | REMOVE BLUE LINE PENETRATIONS UNDER DISPENSERS, TANKS SUMPS AND TRANSITION SUMPS (DISPENSERS WILL NOT BE REMOVED) AND REPLACE WITH BRAVO PENETRATIONS- QUIKTRIP 1492 | |
T18RW04925 | Final | 11/02/2018 | 02/04/2019 | ROW | Starting on the South side of 22nd St and West of Pantano Rd riser down TEP pole and trench/bore 21' from Cox pedestal. | |
T21CM05750 | L of c | 07/14/2021 | 04/23/2022 | COMBO | TI: Layout and Equipment Modifications to Existing Full Service Counter, Sales Floor and Checkstand |
Code Enforcement
Parcel Number - 13507439B
Date - 03/04/2025 3:16 p.m.
Total Number Of Code Cases - 5
Case Number | Case Status | Entered Date | Closed Date | Unit | Type | Description |
---|---|---|---|---|---|---|
T11DV02471 | Noverify | 04/12/2011 | N/A | DNR_VIOL | Sign violation. | |
T13DV07897 | Noverify | 10/22/2013 | N/A | DNR_VIOL | Graffiti referral: The HOA walls on the west side are tagged. GPC will not remove tagging. | |
T14DV07909 | Noverify | 09/24/2014 | N/A | DNR_VIOL | Quik Trip, signs on light poles. | |
T20DV01348 | Complian | 02/24/2020 | N/A | DNR_VIOL | Lots of garbage, homeless, graffiti, gang, and drug use Address of violation: behind QT between overflow parking and Housing comples | |
T21DV02188 | Noverify | 04/19/2021 | N/A | DNR_VIOL | TRASH AND REFUSE AROUND PROPERTY |