Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Parcel Search: 13219147A
Parcel Search
Parcel Attributes
| Parcel | 13219147A |
|---|---|
| Jurisdiction | Tucson, Pima County |
| City of Tucson Zoning | C-2 |
| Tucson Ward | Ward 5 |
| Major Street & Route | Arterial or Collector |
| Pima County Data | Assessor, Recorder, Treasurer, ... |
| Parcel Map | Map |
| Parcel Attributes Issue? | |
Permits
Parcel Number - 13219147A
Date - 12/15/2025 10:17 a.m.
Total Number Of Permits - (76)
| Permit | Permit Status | Entered Date | Expired Date | Unit | Type | Description |
|---|---|---|---|---|---|---|
| TZ-PMT-0525-00048 | Approved | 05/20/2025 | 06/30/2026 | Zoning Permit Annual | The intent of this property is to be used as a construction laydown yard to help facilitate efficient storage and handling of construction materials for the ongoing I-10, Country Club and Kino Parkway TIs ADOT Project. | |
| TR-ROW-1024-01186 | Void | 10/09/2024 | N/A | Right-of-Way (ROW) | This ROW permit will be used to perform geotechnical investigation/boring, existing utility potholing, existing storm drain inspections, as well as native plant inventory and relocation. This work will take place along the I-10 corridor at Park Avenue, Kino Parkway, Country Club, Irvington, and Palo Verde. | |
| TR-ROW-1024-01186 | Void | 10/09/2024 | N/A | BLDG 1 | Right-of-Way (ROW) | This ROW permit will be used to perform geotechnical investigation/boring, existing utility potholing, existing storm drain inspections, as well as native plant inventory and relocation. This work will take place along the I-10 corridor at Park Avenue, Kino Parkway, Country Club, Irvington, and Palo Verde. |
| TR-ROW-1024-01186 | Void | 10/09/2024 | N/A | BLDG 2 | Right-of-Way (ROW) | This ROW permit will be used to perform geotechnical investigation/boring, existing utility potholing, existing storm drain inspections, as well as native plant inventory and relocation. This work will take place along the I-10 corridor at Park Avenue, Kino Parkway, Country Club, Irvington, and Palo Verde. |
| TR-ROW-1024-01186 | Void | 10/09/2024 | N/A | BLDG 3 | Right-of-Way (ROW) | This ROW permit will be used to perform geotechnical investigation/boring, existing utility potholing, existing storm drain inspections, as well as native plant inventory and relocation. This work will take place along the I-10 corridor at Park Avenue, Kino Parkway, Country Club, Irvington, and Palo Verde. |
| TR-ROW-1024-01186 | Void | 10/09/2024 | N/A | BLDG 4 | Right-of-Way (ROW) | This ROW permit will be used to perform geotechnical investigation/boring, existing utility potholing, existing storm drain inspections, as well as native plant inventory and relocation. This work will take place along the I-10 corridor at Park Avenue, Kino Parkway, Country Club, Irvington, and Palo Verde. |
| TR-ROW-1024-01186 | Void | 10/09/2024 | N/A | BLDG 4 UNIT 143 | Right-of-Way (ROW) | This ROW permit will be used to perform geotechnical investigation/boring, existing utility potholing, existing storm drain inspections, as well as native plant inventory and relocation. This work will take place along the I-10 corridor at Park Avenue, Kino Parkway, Country Club, Irvington, and Palo Verde. |
| TR-ROW-1024-01186 | Void | 10/09/2024 | N/A | BLDG 4 UNIT 145 | Right-of-Way (ROW) | This ROW permit will be used to perform geotechnical investigation/boring, existing utility potholing, existing storm drain inspections, as well as native plant inventory and relocation. This work will take place along the I-10 corridor at Park Avenue, Kino Parkway, Country Club, Irvington, and Palo Verde. |
| TR-ROW-1024-01186 | Void | 10/09/2024 | N/A | BLDG 4 UNIT 147 | Right-of-Way (ROW) | This ROW permit will be used to perform geotechnical investigation/boring, existing utility potholing, existing storm drain inspections, as well as native plant inventory and relocation. This work will take place along the I-10 corridor at Park Avenue, Kino Parkway, Country Club, Irvington, and Palo Verde. |
| TR-ROW-1024-01186 | Void | 10/09/2024 | N/A | BLDG 4 UNIT 149 | Right-of-Way (ROW) | This ROW permit will be used to perform geotechnical investigation/boring, existing utility potholing, existing storm drain inspections, as well as native plant inventory and relocation. This work will take place along the I-10 corridor at Park Avenue, Kino Parkway, Country Club, Irvington, and Palo Verde. |
| TR-ROW-1024-01186 | Void | 10/09/2024 | N/A | BLDG 4 UNIT 151 | Right-of-Way (ROW) | This ROW permit will be used to perform geotechnical investigation/boring, existing utility potholing, existing storm drain inspections, as well as native plant inventory and relocation. This work will take place along the I-10 corridor at Park Avenue, Kino Parkway, Country Club, Irvington, and Palo Verde. |
| TR-ROW-1024-01186 | Void | 10/09/2024 | N/A | BLDG 4 UNIT 153 | Right-of-Way (ROW) | This ROW permit will be used to perform geotechnical investigation/boring, existing utility potholing, existing storm drain inspections, as well as native plant inventory and relocation. This work will take place along the I-10 corridor at Park Avenue, Kino Parkway, Country Club, Irvington, and Palo Verde. |
| TR-ROW-1024-01186 | Void | 10/09/2024 | N/A | BLDG 4 UNIT 155 | Right-of-Way (ROW) | This ROW permit will be used to perform geotechnical investigation/boring, existing utility potholing, existing storm drain inspections, as well as native plant inventory and relocation. This work will take place along the I-10 corridor at Park Avenue, Kino Parkway, Country Club, Irvington, and Palo Verde. |
| TR-ROW-1024-01186 | Void | 10/09/2024 | N/A | BLDG 4 UNIT 157 | Right-of-Way (ROW) | This ROW permit will be used to perform geotechnical investigation/boring, existing utility potholing, existing storm drain inspections, as well as native plant inventory and relocation. This work will take place along the I-10 corridor at Park Avenue, Kino Parkway, Country Club, Irvington, and Palo Verde. |
| TR-ROW-1024-01186 | Void | 10/09/2024 | N/A | BLDG 5 | Right-of-Way (ROW) | This ROW permit will be used to perform geotechnical investigation/boring, existing utility potholing, existing storm drain inspections, as well as native plant inventory and relocation. This work will take place along the I-10 corridor at Park Avenue, Kino Parkway, Country Club, Irvington, and Palo Verde. |
| TR-ROW-1024-01186 | Void | 10/09/2024 | N/A | BLDG 6 | Right-of-Way (ROW) | This ROW permit will be used to perform geotechnical investigation/boring, existing utility potholing, existing storm drain inspections, as well as native plant inventory and relocation. This work will take place along the I-10 corridor at Park Avenue, Kino Parkway, Country Club, Irvington, and Palo Verde. |
| TR-ROW-1024-01186 | Void | 10/09/2024 | N/A | BLDG 7 | Right-of-Way (ROW) | This ROW permit will be used to perform geotechnical investigation/boring, existing utility potholing, existing storm drain inspections, as well as native plant inventory and relocation. This work will take place along the I-10 corridor at Park Avenue, Kino Parkway, Country Club, Irvington, and Palo Verde. |
| TR-ROW-1024-01186 | Void | 10/09/2024 | N/A | BLDG 8 | Right-of-Way (ROW) | This ROW permit will be used to perform geotechnical investigation/boring, existing utility potholing, existing storm drain inspections, as well as native plant inventory and relocation. This work will take place along the I-10 corridor at Park Avenue, Kino Parkway, Country Club, Irvington, and Palo Verde. |
| TR-ROW-1024-01186 | Void | 10/09/2024 | N/A | BLDG 9 | Right-of-Way (ROW) | This ROW permit will be used to perform geotechnical investigation/boring, existing utility potholing, existing storm drain inspections, as well as native plant inventory and relocation. This work will take place along the I-10 corridor at Park Avenue, Kino Parkway, Country Club, Irvington, and Palo Verde. |
| TR-ROW-1024-01186 | Void | 10/09/2024 | N/A | UNIT 1 | Right-of-Way (ROW) | This ROW permit will be used to perform geotechnical investigation/boring, existing utility potholing, existing storm drain inspections, as well as native plant inventory and relocation. This work will take place along the I-10 corridor at Park Avenue, Kino Parkway, Country Club, Irvington, and Palo Verde. |
| TR-ROW-1024-01186 | Void | 10/09/2024 | N/A | UNIT 100 | Right-of-Way (ROW) | This ROW permit will be used to perform geotechnical investigation/boring, existing utility potholing, existing storm drain inspections, as well as native plant inventory and relocation. This work will take place along the I-10 corridor at Park Avenue, Kino Parkway, Country Club, Irvington, and Palo Verde. |
| TR-ROW-1024-01186 | Void | 10/09/2024 | N/A | UNIT 101 | Right-of-Way (ROW) | This ROW permit will be used to perform geotechnical investigation/boring, existing utility potholing, existing storm drain inspections, as well as native plant inventory and relocation. This work will take place along the I-10 corridor at Park Avenue, Kino Parkway, Country Club, Irvington, and Palo Verde. |
| TR-ROW-1024-01186 | Void | 10/09/2024 | N/A | UNIT 103 | Right-of-Way (ROW) | This ROW permit will be used to perform geotechnical investigation/boring, existing utility potholing, existing storm drain inspections, as well as native plant inventory and relocation. This work will take place along the I-10 corridor at Park Avenue, Kino Parkway, Country Club, Irvington, and Palo Verde. |
| TR-ROW-1024-01186 | Void | 10/09/2024 | N/A | UNIT 105 | Right-of-Way (ROW) | This ROW permit will be used to perform geotechnical investigation/boring, existing utility potholing, existing storm drain inspections, as well as native plant inventory and relocation. This work will take place along the I-10 corridor at Park Avenue, Kino Parkway, Country Club, Irvington, and Palo Verde. |
| TR-ROW-1024-01186 | Void | 10/09/2024 | N/A | UNIT 107 | Right-of-Way (ROW) | This ROW permit will be used to perform geotechnical investigation/boring, existing utility potholing, existing storm drain inspections, as well as native plant inventory and relocation. This work will take place along the I-10 corridor at Park Avenue, Kino Parkway, Country Club, Irvington, and Palo Verde. |
| TR-ROW-1024-01186 | Void | 10/09/2024 | N/A | UNIT 111 | Right-of-Way (ROW) | This ROW permit will be used to perform geotechnical investigation/boring, existing utility potholing, existing storm drain inspections, as well as native plant inventory and relocation. This work will take place along the I-10 corridor at Park Avenue, Kino Parkway, Country Club, Irvington, and Palo Verde. |
| TR-ROW-1024-01186 | Void | 10/09/2024 | N/A | UNIT 113 | Right-of-Way (ROW) | This ROW permit will be used to perform geotechnical investigation/boring, existing utility potholing, existing storm drain inspections, as well as native plant inventory and relocation. This work will take place along the I-10 corridor at Park Avenue, Kino Parkway, Country Club, Irvington, and Palo Verde. |
| TR-ROW-1024-01186 | Void | 10/09/2024 | N/A | UNIT 115 | Right-of-Way (ROW) | This ROW permit will be used to perform geotechnical investigation/boring, existing utility potholing, existing storm drain inspections, as well as native plant inventory and relocation. This work will take place along the I-10 corridor at Park Avenue, Kino Parkway, Country Club, Irvington, and Palo Verde. |
| TR-ROW-1024-01186 | Void | 10/09/2024 | N/A | UNIT 120 | Right-of-Way (ROW) | This ROW permit will be used to perform geotechnical investigation/boring, existing utility potholing, existing storm drain inspections, as well as native plant inventory and relocation. This work will take place along the I-10 corridor at Park Avenue, Kino Parkway, Country Club, Irvington, and Palo Verde. |
| TR-ROW-1024-01186 | Void | 10/09/2024 | N/A | UNIT 121 | Right-of-Way (ROW) | This ROW permit will be used to perform geotechnical investigation/boring, existing utility potholing, existing storm drain inspections, as well as native plant inventory and relocation. This work will take place along the I-10 corridor at Park Avenue, Kino Parkway, Country Club, Irvington, and Palo Verde. |
| TR-ROW-1024-01186 | Void | 10/09/2024 | N/A | UNIT 125 | Right-of-Way (ROW) | This ROW permit will be used to perform geotechnical investigation/boring, existing utility potholing, existing storm drain inspections, as well as native plant inventory and relocation. This work will take place along the I-10 corridor at Park Avenue, Kino Parkway, Country Club, Irvington, and Palo Verde. |
| TR-ROW-1024-01186 | Void | 10/09/2024 | N/A | UNIT 130 | Right-of-Way (ROW) | This ROW permit will be used to perform geotechnical investigation/boring, existing utility potholing, existing storm drain inspections, as well as native plant inventory and relocation. This work will take place along the I-10 corridor at Park Avenue, Kino Parkway, Country Club, Irvington, and Palo Verde. |
| TR-ROW-1024-01186 | Void | 10/09/2024 | N/A | UNIT 140 | Right-of-Way (ROW) | This ROW permit will be used to perform geotechnical investigation/boring, existing utility potholing, existing storm drain inspections, as well as native plant inventory and relocation. This work will take place along the I-10 corridor at Park Avenue, Kino Parkway, Country Club, Irvington, and Palo Verde. |
| TR-ROW-1024-01186 | Void | 10/09/2024 | N/A | UNIT 150 | Right-of-Way (ROW) | This ROW permit will be used to perform geotechnical investigation/boring, existing utility potholing, existing storm drain inspections, as well as native plant inventory and relocation. This work will take place along the I-10 corridor at Park Avenue, Kino Parkway, Country Club, Irvington, and Palo Verde. |
| TR-ROW-1024-01186 | Void | 10/09/2024 | N/A | UNIT 17 | Right-of-Way (ROW) | This ROW permit will be used to perform geotechnical investigation/boring, existing utility potholing, existing storm drain inspections, as well as native plant inventory and relocation. This work will take place along the I-10 corridor at Park Avenue, Kino Parkway, Country Club, Irvington, and Palo Verde. |
| TR-ROW-1024-01186 | Void | 10/09/2024 | N/A | UNIT 1M | Right-of-Way (ROW) | This ROW permit will be used to perform geotechnical investigation/boring, existing utility potholing, existing storm drain inspections, as well as native plant inventory and relocation. This work will take place along the I-10 corridor at Park Avenue, Kino Parkway, Country Club, Irvington, and Palo Verde. |
| TR-ROW-1024-01186 | Void | 10/09/2024 | N/A | UNIT 2 | Right-of-Way (ROW) | This ROW permit will be used to perform geotechnical investigation/boring, existing utility potholing, existing storm drain inspections, as well as native plant inventory and relocation. This work will take place along the I-10 corridor at Park Avenue, Kino Parkway, Country Club, Irvington, and Palo Verde. |
| TR-ROW-1024-01186 | Void | 10/09/2024 | N/A | UNIT 200 | Right-of-Way (ROW) | This ROW permit will be used to perform geotechnical investigation/boring, existing utility potholing, existing storm drain inspections, as well as native plant inventory and relocation. This work will take place along the I-10 corridor at Park Avenue, Kino Parkway, Country Club, Irvington, and Palo Verde. |
| TR-ROW-1024-01186 | Void | 10/09/2024 | N/A | UNIT 220 | Right-of-Way (ROW) | This ROW permit will be used to perform geotechnical investigation/boring, existing utility potholing, existing storm drain inspections, as well as native plant inventory and relocation. This work will take place along the I-10 corridor at Park Avenue, Kino Parkway, Country Club, Irvington, and Palo Verde. |
| TR-ROW-1024-01186 | Void | 10/09/2024 | N/A | UNIT 2M | Right-of-Way (ROW) | This ROW permit will be used to perform geotechnical investigation/boring, existing utility potholing, existing storm drain inspections, as well as native plant inventory and relocation. This work will take place along the I-10 corridor at Park Avenue, Kino Parkway, Country Club, Irvington, and Palo Verde. |
| TR-ROW-1024-01186 | Void | 10/09/2024 | N/A | UNIT 3 | Right-of-Way (ROW) | This ROW permit will be used to perform geotechnical investigation/boring, existing utility potholing, existing storm drain inspections, as well as native plant inventory and relocation. This work will take place along the I-10 corridor at Park Avenue, Kino Parkway, Country Club, Irvington, and Palo Verde. |
| TR-ROW-1024-01186 | Void | 10/09/2024 | N/A | UNIT 300 | Right-of-Way (ROW) | This ROW permit will be used to perform geotechnical investigation/boring, existing utility potholing, existing storm drain inspections, as well as native plant inventory and relocation. This work will take place along the I-10 corridor at Park Avenue, Kino Parkway, Country Club, Irvington, and Palo Verde. |
| TR-ROW-1024-01186 | Void | 10/09/2024 | N/A | UNIT 320 | Right-of-Way (ROW) | This ROW permit will be used to perform geotechnical investigation/boring, existing utility potholing, existing storm drain inspections, as well as native plant inventory and relocation. This work will take place along the I-10 corridor at Park Avenue, Kino Parkway, Country Club, Irvington, and Palo Verde. |
| TR-ROW-1024-01186 | Void | 10/09/2024 | N/A | UNIT 330 | Right-of-Way (ROW) | This ROW permit will be used to perform geotechnical investigation/boring, existing utility potholing, existing storm drain inspections, as well as native plant inventory and relocation. This work will take place along the I-10 corridor at Park Avenue, Kino Parkway, Country Club, Irvington, and Palo Verde. |
| TR-ROW-1024-01186 | Void | 10/09/2024 | N/A | UNIT 340 | Right-of-Way (ROW) | This ROW permit will be used to perform geotechnical investigation/boring, existing utility potholing, existing storm drain inspections, as well as native plant inventory and relocation. This work will take place along the I-10 corridor at Park Avenue, Kino Parkway, Country Club, Irvington, and Palo Verde. |
| TR-ROW-1024-01186 | Void | 10/09/2024 | N/A | UNIT 350 | Right-of-Way (ROW) | This ROW permit will be used to perform geotechnical investigation/boring, existing utility potholing, existing storm drain inspections, as well as native plant inventory and relocation. This work will take place along the I-10 corridor at Park Avenue, Kino Parkway, Country Club, Irvington, and Palo Verde. |
| TR-ROW-1024-01186 | Void | 10/09/2024 | N/A | UNIT 360 | Right-of-Way (ROW) | This ROW permit will be used to perform geotechnical investigation/boring, existing utility potholing, existing storm drain inspections, as well as native plant inventory and relocation. This work will take place along the I-10 corridor at Park Avenue, Kino Parkway, Country Club, Irvington, and Palo Verde. |
| TR-ROW-1024-01186 | Void | 10/09/2024 | N/A | UNIT 370 | Right-of-Way (ROW) | This ROW permit will be used to perform geotechnical investigation/boring, existing utility potholing, existing storm drain inspections, as well as native plant inventory and relocation. This work will take place along the I-10 corridor at Park Avenue, Kino Parkway, Country Club, Irvington, and Palo Verde. |
| TR-ROW-1024-01186 | Void | 10/09/2024 | N/A | UNIT 410 | Right-of-Way (ROW) | This ROW permit will be used to perform geotechnical investigation/boring, existing utility potholing, existing storm drain inspections, as well as native plant inventory and relocation. This work will take place along the I-10 corridor at Park Avenue, Kino Parkway, Country Club, Irvington, and Palo Verde. |
| TR-ROW-1024-01186 | Void | 10/09/2024 | N/A | UNIT 470 | Right-of-Way (ROW) | This ROW permit will be used to perform geotechnical investigation/boring, existing utility potholing, existing storm drain inspections, as well as native plant inventory and relocation. This work will take place along the I-10 corridor at Park Avenue, Kino Parkway, Country Club, Irvington, and Palo Verde. |
| TR-ROW-1024-01193 | Needs resubmittal | 10/10/2024 | N/A | Right-of-Way (ROW) | This ROW permit will be used to perform geotechnical investigation/boring, existing utility potholing, existing storm drain inspections, as well as native plant inventory and relocation. This work will take place along the I-10 corridor at Kino Parkway | |
| TR-ROW-1024-01193 | Needs resubmittal | 10/10/2024 | N/A | BLDG 1 | Right-of-Way (ROW) | This ROW permit will be used to perform geotechnical investigation/boring, existing utility potholing, existing storm drain inspections, as well as native plant inventory and relocation. This work will take place along the I-10 corridor at Kino Parkway |
| TR-ROW-1024-01193 | Needs resubmittal | 10/10/2024 | N/A | BLDG 2 | Right-of-Way (ROW) | This ROW permit will be used to perform geotechnical investigation/boring, existing utility potholing, existing storm drain inspections, as well as native plant inventory and relocation. This work will take place along the I-10 corridor at Kino Parkway |
| TR-ROW-1024-01193 | Needs resubmittal | 10/10/2024 | N/A | BLDG 3 | Right-of-Way (ROW) | This ROW permit will be used to perform geotechnical investigation/boring, existing utility potholing, existing storm drain inspections, as well as native plant inventory and relocation. This work will take place along the I-10 corridor at Kino Parkway |
| TR-ROW-1024-01193 | Needs resubmittal | 10/10/2024 | N/A | BLDG 4 | Right-of-Way (ROW) | This ROW permit will be used to perform geotechnical investigation/boring, existing utility potholing, existing storm drain inspections, as well as native plant inventory and relocation. This work will take place along the I-10 corridor at Kino Parkway |
| TR-ROW-1024-01193 | Needs resubmittal | 10/10/2024 | N/A | BLDG 4 UNIT 143 | Right-of-Way (ROW) | This ROW permit will be used to perform geotechnical investigation/boring, existing utility potholing, existing storm drain inspections, as well as native plant inventory and relocation. This work will take place along the I-10 corridor at Kino Parkway |
| TR-ROW-1024-01193 | Needs resubmittal | 10/10/2024 | N/A | BLDG 4 UNIT 145 | Right-of-Way (ROW) | This ROW permit will be used to perform geotechnical investigation/boring, existing utility potholing, existing storm drain inspections, as well as native plant inventory and relocation. This work will take place along the I-10 corridor at Kino Parkway |
| TR-ROW-1024-01193 | Needs resubmittal | 10/10/2024 | N/A | BLDG 4 UNIT 147 | Right-of-Way (ROW) | This ROW permit will be used to perform geotechnical investigation/boring, existing utility potholing, existing storm drain inspections, as well as native plant inventory and relocation. This work will take place along the I-10 corridor at Kino Parkway |
| TR-ROW-1024-01193 | Needs resubmittal | 10/10/2024 | N/A | BLDG 4 UNIT 149 | Right-of-Way (ROW) | This ROW permit will be used to perform geotechnical investigation/boring, existing utility potholing, existing storm drain inspections, as well as native plant inventory and relocation. This work will take place along the I-10 corridor at Kino Parkway |
| TR-ROW-1024-01193 | Needs resubmittal | 10/10/2024 | N/A | BLDG 4 UNIT 151 | Right-of-Way (ROW) | This ROW permit will be used to perform geotechnical investigation/boring, existing utility potholing, existing storm drain inspections, as well as native plant inventory and relocation. This work will take place along the I-10 corridor at Kino Parkway |
| TR-ROW-1024-01193 | Needs resubmittal | 10/10/2024 | N/A | BLDG 4 UNIT 153 | Right-of-Way (ROW) | This ROW permit will be used to perform geotechnical investigation/boring, existing utility potholing, existing storm drain inspections, as well as native plant inventory and relocation. This work will take place along the I-10 corridor at Kino Parkway |
| TR-ROW-1024-01193 | Needs resubmittal | 10/10/2024 | N/A | BLDG 4 UNIT 155 | Right-of-Way (ROW) | This ROW permit will be used to perform geotechnical investigation/boring, existing utility potholing, existing storm drain inspections, as well as native plant inventory and relocation. This work will take place along the I-10 corridor at Kino Parkway |
| TR-ROW-1024-01193 | Needs resubmittal | 10/10/2024 | N/A | BLDG 4 UNIT 157 | Right-of-Way (ROW) | This ROW permit will be used to perform geotechnical investigation/boring, existing utility potholing, existing storm drain inspections, as well as native plant inventory and relocation. This work will take place along the I-10 corridor at Kino Parkway |
| TR-ROW-1024-01193 | Needs resubmittal | 10/10/2024 | N/A | UNIT 101 | Right-of-Way (ROW) | This ROW permit will be used to perform geotechnical investigation/boring, existing utility potholing, existing storm drain inspections, as well as native plant inventory and relocation. This work will take place along the I-10 corridor at Kino Parkway |
| TR-ROW-1024-01193 | Needs resubmittal | 10/10/2024 | N/A | UNIT 103 | Right-of-Way (ROW) | This ROW permit will be used to perform geotechnical investigation/boring, existing utility potholing, existing storm drain inspections, as well as native plant inventory and relocation. This work will take place along the I-10 corridor at Kino Parkway |
| TR-ROW-1024-01193 | Needs resubmittal | 10/10/2024 | N/A | UNIT 105 | Right-of-Way (ROW) | This ROW permit will be used to perform geotechnical investigation/boring, existing utility potholing, existing storm drain inspections, as well as native plant inventory and relocation. This work will take place along the I-10 corridor at Kino Parkway |
| TR-ROW-1024-01193 | Needs resubmittal | 10/10/2024 | N/A | UNIT 107 | Right-of-Way (ROW) | This ROW permit will be used to perform geotechnical investigation/boring, existing utility potholing, existing storm drain inspections, as well as native plant inventory and relocation. This work will take place along the I-10 corridor at Kino Parkway |
| TR-ROW-1024-01193 | Needs resubmittal | 10/10/2024 | N/A | UNIT 111 | Right-of-Way (ROW) | This ROW permit will be used to perform geotechnical investigation/boring, existing utility potholing, existing storm drain inspections, as well as native plant inventory and relocation. This work will take place along the I-10 corridor at Kino Parkway |
| TR-ROW-1024-01193 | Needs resubmittal | 10/10/2024 | N/A | UNIT 113 | Right-of-Way (ROW) | This ROW permit will be used to perform geotechnical investigation/boring, existing utility potholing, existing storm drain inspections, as well as native plant inventory and relocation. This work will take place along the I-10 corridor at Kino Parkway |
| TR-ROW-1024-01193 | Needs resubmittal | 10/10/2024 | N/A | UNIT 115 | Right-of-Way (ROW) | This ROW permit will be used to perform geotechnical investigation/boring, existing utility potholing, existing storm drain inspections, as well as native plant inventory and relocation. This work will take place along the I-10 corridor at Kino Parkway |
| TR-ROW-1024-01193 | Needs resubmittal | 10/10/2024 | N/A | UNIT 121 | Right-of-Way (ROW) | This ROW permit will be used to perform geotechnical investigation/boring, existing utility potholing, existing storm drain inspections, as well as native plant inventory and relocation. This work will take place along the I-10 corridor at Kino Parkway |
| TR-ROW-1024-01193 | Needs resubmittal | 10/10/2024 | N/A | UNIT 125 | Right-of-Way (ROW) | This ROW permit will be used to perform geotechnical investigation/boring, existing utility potholing, existing storm drain inspections, as well as native plant inventory and relocation. This work will take place along the I-10 corridor at Kino Parkway |
| T08AN00058 | Issued | 01/16/2008 | N/A | ADDRNEW | ||
| T08AN00059 | Issued | 01/16/2008 | N/A | ADDRNEW | ||
| T08BU00336 | Withdrwn | 02/20/2008 | 09/20/2011 | GRADING | GRADING: VALUE PLACE HOTEL | |
| T08CM00589 | Withdrwn | 02/20/2008 | N/A | COMBO | NEW HOTEL |
Code Enforcement
Parcel Number - 13219147A
Date - 12/15/2025 10:17 a.m.
Total Number Of Code Cases - 2
| Case Number | Case Status | Entered Date | Closed Date | Unit | Type | Description |
|---|---|---|---|---|---|---|
| CE-VIO1222-01154 | Closed - resolved | 12/28/2022 | 11/14/2023 | Code Enforcement Case | ZCOM - Vacant parcel R1/R2 zoning is being rezoned to C2 (proposed); site has been graded and utilized for multiple semi trailer storage without approval; no development plan or permits. | |
| T08DV09123 | Complian | 09/26/2008 | N/A | DNR_VIOL | POLITICAL SIGNS IN R.O.W. SW CORNER OF AJO WAY AND I-10 EXIT RAMP LIGHT. |
Plans
Parcel Number - 13219147A
Date - 12/15/2025 10:17 a.m.
Total Number Of Plans - 2
| Plan Number | Plan Status | Application Date | Expired Date | Unit | Type | Description |
|---|---|---|---|---|---|---|
| C9-21-15 | Authorized | 08/19/2021 | N/A | Map/Use Changes - Entitlements | Ajo & I-10 - Ajo Way - Auto sales and restaurant pad with future buildout for second restaurant pad | |
| T21PRE0121 | Closed | 05/18/2021 | N/A | NEIGHBORHOOD NOTIFICATION | Auto sales and restaurant pad with future buildout for second restaurant PAD |