Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Parcel Search

 
Parcel Attributes
Parcel12910129A
JurisdictionTucson
City of Tucson ZoningC-2
Water Course

Washes

Tucson WardWard 5
Tucson Registered NeighborhoodSouth Park
Major Streets & Routes

Arterial or Collector

,

Gateway Route

,

Intersection Buffer

Pima County Data Assessor, Recorder, Treasurer, ...
Parcel Map Map
Address

Annexations & Original City Zoning (OCZ)

Date - 12/25/2024 5:38 a.m.
Total Number Of OZC Plans - (1)
Plan Description Annexation Ordinance Effective Date OCZ Ordinance
3/4 Mile East To Campbell Avenue 486 06/14/1919 None

Rezoning Cases

Date - 12/25/2024 5:38 a.m.
Total Number Of Rezone Cases - (1)
Case No. Description New Zone Status Status Date Address
C9-17-09 El Rio Health Center-22nd St C-2 Effectuated 07/11/2017 S CHERRYBELL

Permits

Parcel Number - 12910129A
Date - 12/25/2024 5:38 a.m.
Total Number Of Permits - (26)
Permit Permit Status Entered Date Expired Date Unit Type Description
TR-ROW-0124-00078 Issued 01/18/2024 03/20/2024 Right-of-Way (ROW) Gauge and sample one groundwater monitoring well (2 hours). Work zone is in the Kino Parkway N/B exit ramp.
TR-ROW-0123-00287 Complete 01/23/2023 03/22/2023 Right-of-Way (ROW) Sample two groundwater monitoring wells (2 hours). Work zones are in the Kino Parkway N/B exit ramp for the first well and Kino Pkwy S/B off-ramp for the other. Also, measure water level at a groundwater monitoring well (30 minutes) at the 1415 S Cherry Ave., Tucson, AZ 85713 address.
T19OT00095 Expired 01/25/2019 12/10/2019 Sign - Permanent Proposed pole sign (Singular Sign Design Option approved / T19SA00097 appeal period ended 4/9/19)
TR-ROW-0223-00376 Complete 02/13/2023 05/12/2023 Right-of-Way (ROW) Contractor will be removing & replacing new traffic camera sensors. Duration for this project is approx. (1) one hour. Walkway for pedestrians will be available.
TF-FOP-0223-00559 Complete 02/23/2023 03/01/2024 Fire Operational Permit State License Facility
TR-ROW-0423-00604 Complete 04/06/2023 06/21/2023 Right-of-Way (ROW) Gauge fluid levels at two groundwater monitoring wells (2-3 hours). Work zones are in the Kino Parkway N/B exit ramp for the first well and 1415 S Cherry Ave., Tucson, AZ 85713 address for the second well.
TR-ROW-0424-00422 Complete 04/18/2024 06/20/2024 Right-of-Way (ROW) Gauge fluid levels at one groundwater monitoring well location (1 hour). Work zone is in the Kino Parkway N/B exit ramp.
TF-FOP-0724-00770 Complete 07/09/2024 07/23/2025 Fire Operational Permit El Rio Cherrybell
TR-ROW-0723-00953 Denied 07/14/2023 N/A Right-of-Way (ROW) Denied - As Submitted - Please Submit each Well Location as individual permits - Sample two groundwater monitoring wells (2 hours). Work zones are in the Kino Parkway N/B exit ramp for the first well and Kino Pkwy S/B off-ramp for the other. Also, measure water level at a groundwater monitoring well (30 minutes) at the 1415 S Cherry Ave., Tucson, AZ 85713 address.
TR-ROW-0723-00959 Complete 07/17/2023 09/27/2023 Right-of-Way (ROW) Sample one groundwater monitoring well (1 hour). Work zone is in the Kino Parkway N/B exit ramp.
TR-ROW-0724-00816 Complete 07/17/2024 09/19/2024 Right-of-Way (ROW) Measure water level and sample one groundwater monitoring well (1 hour). Work zone is in the Kino Parkway N/B exit ramp.
T22RW03425 Complete 09/20/2022 10/22/2022 Right-of-Way (ROW) Job Order Contract (JOC) for Traffic Signal & Street Light Construction, CONTRACT NO. 181906REPL
TR-ROW-0924-01121 Needs resubmittal 09/25/2024 N/A Right-of-Way (ROW) Gauge fluid levels at one groundwater monitoring well location (1 hour). Work zone is in the Kino Parkway N/B exit ramp.
TR-UTL-0924-01860 Complete 09/26/2024 10/15/2024 Right-of-Way (ROW) - Utility wo2880934 1230 s cherrybell sv 14-14-19 ne water main repair in ws of cherrybell sv north of 24th st in dirt 8lf/ar
TR-ROW-0924-01137 Complete 09/27/2024 11/21/2024 Right-of-Way (ROW) Gauge fluid levels at one groundwater monitoring well location (1 hour). Work zone is in the Kino Parkway N/B exit ramp.
TR-ROW-0923-01204 Complete 09/29/2023 12/13/2023 Right-of-Way (ROW) Collect fluid level at groundwater monitoring well (1 hour). Work zone is in the Kino Parkway N/B exit ramp.
TR-ROW-1122-00076 Complete 11/18/2022 01/18/2023 Right-of-Way (ROW) Measure water level at a groundwater monitoring well (45 minutes). Work zone is in the Kino Parkway N/B exit ramp.
DP19-0314 Awaiting submittal 12/26/2019 N/A Development Package SITE/GRADING - Cherrybell Medical Center, Phase 2 (revision to DP17-0157).
T18FC00386 Final 05/07/2018 08/06/2019 FIRECONS New Wet Fire Sprinkler System
T18FC00431 Final 05/23/2018 01/07/2019 FIRECONS INSTALLING 145 LF OF 4" C-400 W/6" OF SHADE SAND AT ALL SIDES.
T18FC00595 Final 07/23/2018 06/26/2019 FIRECONS INSTALL A FIRE SPRINKLER MONITOR AND ALARM SYSTEM IN THIS NEW MEDICAL CENTER.
T20FC00094 Final 02/04/2020 08/31/2020 FIRECONS Install an Alarm Strobe in the New Pharmacy Alcove, Move existing strobe into the Pharmacy
T20RW04561 Final 08/11/2020 09/23/2020 ROW Sample a groundwater monitoring well (1 hour). Work zone is in the Kino Parkway N/B exit ramp.
T21RW03686 Final 08/11/2021 09/05/2021 ROW WATER REPAIR/REPLACE - APPROXIMATELY 5 LF IN DIRT. EMERGENCY - AFTER THE FACT PERMIT
T21RW03715 Final 08/12/2021 09/12/2021 ROW W/O# 21R2152 - REPAIR LEAKING MAIN @ 6 LF. EMERGENCY AFTER THE FACT
T22RW00668 Final 02/25/2022 04/08/2022 ROW Sample a groundwater monitoring well (1 hour). Work zone is in the Kino Parkway N/B exit ramp. PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING. PAVEMENT PATCH TYPE SHALL BE IN CONFORMANCE TO THE CURRENT EDITION OF THE CITY OF TUCSON PUBLIC UTILITY ADMINISTRATIVE MANUAL. IN THE EVENT THAT WEEKEND OR AFTER-HOURS WORK IS INTENDED, CONTACT COT INSPECTION STAFF. DAN ROBERTSON AT 520-400-6722 OR TOM ADKINS AT 520-400-3813. BUS STOP IN THE AREA, CONTACT SUN TRAN DISPATCH, AT 520-206-8934 AND/OR BEA PAULUS AT 520-206-8826 AT LEAST 48-BUSINESS HOURS PRIOR TO START OF WORK FOR COORDINATION. 1. INGRESS/ EGRESS FOR BUSINESS AND RESIDENTIAL ACCESS SHALL BE MAINTAINED. FIELD ADJUSTMENTS MAY BE REQUIRED. 2. PAVEMENT PATCHING IS NECESSARY WHERE PAVEMENT IS CUT. PATCH LIMITS- THE LIMITS OF THE PAVING SHALL BE A MINIMUM OF 1-FT OUTSIDE THE EXCAVATION. 3. POTHOLES SPACED CLOSELY TOGETHER AND WITHIN 8-FT OF EACH OTHER WILL NEED TO BE JOINED TOGETHER BY ONE SURFACE PATCH. 4. BACKFILL WITH CLSM SLURRY OR AGGREGATE BASE COURSE (ABC.) 5. ASPHALTIC CONCRETE USED SHALL BE CITY OF TUCSON MIX NO. 3 OR COT MIX NO. 2 WITH TR-22, INSPECTOR TO ADVISE. 6. REPAIR ALL LANDSCAPING DISTURBED. THIS INCLUDES IRRIGATION, PLANTINGS, GROUNDCOVER, AND HARDSCAPE. 7. GOOD HOUSEKEEPING MEASURES SHALL BE PRACTICED DURING WORK AND CONSTRUCTION 8. MAINTAIN PEDESTRIAN ACCESS 9. IN THE EVENT THAT WEEKEND OR AFTER-HOURS WORK IS INTENDED, CONTACT COT INSPECTION STAFF. IF WEEKEND WORK, MAKE CONTACT 48 HOURS PRIOR TO THE WEEKEND. DAN ROBERTSON- 520-400-6722 OR TOM ADKINS- 520-400-3813