Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Parcel Search: 12908064C
Parcel Search
Parcel Attributes
Parcel | 12908064C |
---|---|
Jurisdiction | Tucson |
City of Tucson Zoning | I-1 |
Tucson Ward | Ward 5 |
Tucson Registered Neighborhood | South Park |
Pima County Data | Assessor, Recorder, Treasurer, ... |
Parcel Map | Map |
Address |
Annexations & Original City Zoning (OCZ)
Date - 11/23/2024 10:05 p.m.
Total Number Of OZC Plans - (1)
Plan | Description | Annexation Ordinance | Effective Date | OCZ Ordinance |
---|---|---|---|---|
3/4 Mile East To Campbell Avenue | 486 | 06/14/1919 | None |
Rezoning Cases
Date - 11/23/2024 10:05 p.m.
Total Number Of Rezone Cases - (1)
Case No. | Description | New Zone | Status | Status Date | Address |
---|---|---|---|---|---|
C9-80-51 | Joyner - Cherrybell Stravenue | I-1 | Effectuated | 12/23/2010 | S CHERRY |
Permits
Parcel Number - 12908064C
Date - 11/23/2024 10:05 p.m.
Total Number Of Permits - (32)
Permit | Permit Status | Entered Date | Expired Date | Unit | Type | Description |
---|---|---|---|---|---|---|
TR-ROW-0124-00079 | Issued | 01/18/2024 | 03/20/2024 | Right-of-Way (ROW) | Gauge water level at a groundwater monitoring well (1 hour) at the 1415 S Cherry Ave., Tucson, AZ 85713 address. | |
TR-ROW-0123-00287 | Complete | 01/23/2023 | 03/22/2023 | Right-of-Way (ROW) | Sample two groundwater monitoring wells (2 hours). Work zones are in the Kino Parkway N/B exit ramp for the first well and Kino Pkwy S/B off-ramp for the other. Also, measure water level at a groundwater monitoring well (30 minutes) at the 1415 S Cherry Ave., Tucson, AZ 85713 address. | |
TR-ROW-0224-00235 | Complete | 02/29/2024 | 07/11/2024 | Right-of-Way (ROW) | Repair driveway connections from private property to roadways as part of overall maintenance for parking lot | |
TR-ROW-0423-00604 | Complete | 04/06/2023 | 06/21/2023 | Right-of-Way (ROW) | Gauge fluid levels at two groundwater monitoring wells (2-3 hours). Work zones are in the Kino Parkway N/B exit ramp for the first well and 1415 S Cherry Ave., Tucson, AZ 85713 address for the second well. | |
TR-ROW-0424-00425 | Complete | 04/18/2024 | 06/20/2024 | Right-of-Way (ROW) | Gauge fluid levels at a groundwater monitoring well location (1 hour) at the 1415 S Cherry Ave., Tucson, AZ 85713 address. | |
TR-ROW-0723-00953 | Denied | 07/14/2023 | N/A | Right-of-Way (ROW) | Denied - As Submitted - Please Submit each Well Location as individual permits - Sample two groundwater monitoring wells (2 hours). Work zones are in the Kino Parkway N/B exit ramp for the first well and Kino Pkwy S/B off-ramp for the other. Also, measure water level at a groundwater monitoring well (30 minutes) at the 1415 S Cherry Ave., Tucson, AZ 85713 address. | |
TR-ROW-0723-00960 | Complete | 07/17/2023 | 09/27/2023 | Right-of-Way (ROW) | Gauge one groundwater monitoring wells (30 hour). Work zone is at 1415 S Cherry Ave., Tucson, AZ 85713 address. | |
TR-ROW-0724-00817 | Complete | 07/17/2024 | 09/19/2024 | Right-of-Way (ROW) | Gauging fluid levels and sampling at a groundwater monitoring well location (1 hour) at the 1415 S Cherry Ave., Tucson, AZ 85713 address. | |
TR-ROW-0924-01122 | Complete | 09/25/2024 | 11/20/2024 | Right-of-Way (ROW) | Gauge fluid levels at a groundwater monitoring well location (1 hour) at the 1415 S Cherry Ave., Tucson, AZ 85713 address. | |
TR-ROW-0923-01205 | Complete | 09/29/2023 | 12/13/2023 | Right-of-Way (ROW) | Measure water level at a groundwater monitoring well (30 minutes). A shadow truck will be used during this activity. | |
T22RW03611 | Complete | 10/04/2022 | 11/06/2022 | Right-of-Way (ROW) | Measure water level at a groundwater monitoring well (45 minutes).** PROOF OF NOTIFICATION IS R | |
T08CM00991 | Final | 03/27/2008 | 12/13/2008 | COMBO | REPAIR:VEHICLE DAMAGE T08DV01966 | |
T08EL00383 | Final | 03/07/2008 | 09/03/2008 | ELECT | REPLACE: 100 AMP PANEL "LIKE FOR LIKE" | |
T09CM03292 | Final | 12/15/2009 | 07/20/2010 | COMBO | REPAIR: CAR INTO BUILDING; T09DV06740 | |
T15TC00383 | Closed | 02/02/2015 | N/A | BARRICAD | WELL MONITORING | |
T17RW02282 | Final | 05/26/2017 | 08/18/2017 | ROW | ACCESS ONE MANHOLE | |
T17RW04242 | Final | 09/25/2017 | 11/01/2017 | ROW | MEASURE A GROUNDWATER MONITORING WELL (10 MINUTES) | |
T18RW01720 | Final | 04/17/2018 | 05/24/2018 | ROW | Install 74 lf of 6" sewer w/2 manholes and two stub outs for future sewers and new sewer line to new building | |
T18RW02013 | Final | 05/03/2018 | 06/06/2018 | ROW | SAMPLE A GROUNDWATER MONITORING WELL( (1 HOUR) MW-22-35 | |
T18RW03486 | Final | 08/06/2018 | 09/12/2018 | ROW | SAMPLE A GROUNDWATER MONITORING WELL( (1 HOUR). MW-22-35 | |
T19RW04511 | Final | 08/20/2019 | 09/18/2019 | ROW | MEASURE WATER LEVEL AT A GROUNDWATER MONITORING WELL (30 MINUTES) | |
T20RW00759 | Final | 02/06/2020 | 03/19/2020 | ROW | MEASURE WATER LEVEL AT A GROUNDWATER MONITORING WELL (30 MINUTES). | |
T20RW02026 | Final | 04/08/2020 | 05/14/2020 | ROW | 20R0881 DAMAGE UTILITY REPAIR LEAKING MAIN @ 6 LF IN DIRT AT THE SOUTHWEST CORNER OF E 24TH ST / S CHERRYBELL STRA. EMERGENCY - AFTER THE FACT PERMIT | |
T20RW03886 | Final | 07/08/2020 | 08/20/2020 | ROW | TUCSON WATER JOC for Roadway Repair & Maintenance #171650, PROJECT MANAGER, JULIAN PALLANES REPAIR PATCH LOCATED EAST OF PROPERTY IN THE ASPHALT SHOULDER. PATCH APPROX 10' x 15' | |
T20RW03943 | Final | 07/10/2020 | 08/09/2020 | ROW | WAM # 20r1557 emergency 12" main repair at the east side of the lot in dirt. EMERGENCY - AFTER THE FACT | |
T20RW04565 | Final | 08/11/2020 | 09/23/2020 | ROW | Measure water level at a groundwater monitoring well (30 minutes). | |
T21RW00684 | Final | 02/10/2021 | 03/24/2021 | ROW | MEASURE WATER LEVEL AT A GROUNDWATER MONITORING WELL (30 minutes). | |
T21RW03747 | Final | 08/13/2021 | 09/29/2021 | ROW | MEASURE WATER LEVEL AT A GROUNDWATER MONITORING WELL MW-22-35 (30 MINUTES). ** PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING. | |
T21RW04910 | Final | 11/03/2021 | 12/08/2021 | ROW | MEASURE WATER LEVEL AT A GROUNDWATER MONITORING WELL (30 MINUTES) MUST COORDINATE TRAFFIC CONTROL WITH EXISTING SET UP | |
T22RW00671 | Final | 02/25/2022 | 03/30/2022 | ROW | Measure water level at a groundwater monitoring well (30 minutes). PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING. PAVEMENT PATCH TYPE SHALL BE IN CONFORMANCE TO THE CURRENT EDITION OF THE CITY OF TUCSON PUBLIC UTILITY ADMINISTRATIVE MANUAL. IN THE EVENT THAT WEEKEND OR AFTER-HOURS WORK IS INTENDED, CONTACT COT INSPECTION STAFF. DAN ROBERTSON AT 520-400-6722 OR TOM ADKINS AT 520-400-3813. OTHER ACTIVITIES IN THE AREA, WILL NEED TO COORDINATE TRAFFIC CONTROL SETUP WITH EXISTING SETUP. | |
T22RW01313 | Final | 04/05/2022 | 06/16/2022 | ROW | Collect fluid levels at groundwater monitoring well (1 hour). ** PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING. IN THE EVENT THAT WEEKEND OR AFTER-HOURS WORK IS INTENDED, CONTACT COT INSPECTION STAFF. DAN ROBERTSON AT 520-400-6722 OR TOM ADKINS AT 520-400-3813. | |
T22RW02939 | Final | 08/15/2022 | 09/16/2022 | ROW | Measure water level at a groundwater monitoring well (30 minutes). ** PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING PAVEMENT PATCH TYPE SHALL BE IN CONFORMANCE TO THE CURRENT EDITION OF THE CITY OF TUCSON PUBLIC UTILITY ADMINISTRATIVE MANUAL. |
Code Enforcement
Parcel Number - 12908064C
Date - 11/23/2024 10:05 p.m.
Total Number Of Code Cases - 3
Case Number | Case Status | Entered Date | Closed Date | Unit | Type | Description |
---|---|---|---|---|---|---|
CE-VIO0724-02572 | Closed - resolved | 07/02/2024 | 08/14/2024 | Code Enforcement Case | PMMULT / Referred from TDOT / Uprooted Mesquite tree on Northside of property along E 24th St | |
T08DV01966 | Complian | 03/08/2008 | N/A | DNR_VIOL | COMMUNICATIONS, TPD, BUS THROUGH COMMERCIAL BUILDING. ALARM # 08-03060871 @ 10:16 PM ON 3/6/08. | |
T09DV06740 | Complian | 12/08/2009 | N/A | DNR_VIOL | Car through building, alarm # 09-74253. |
Plans
Parcel Number - 12908064C
Date - 11/23/2024 10:05 p.m.
Total Number Of Plans - 1
Plan Number | Plan Status | Application Date | Expired Date | Unit | Type | Description |
---|---|---|---|---|---|---|
TP-PRE-0224-00041 | Void | 02/14/2024 | N/A | Pre-Application | **VOID** NOT NEEDED AT THIS TIME/ Property owner is considering maintenance work to existing site asphalt; would like to confirm what considered items would trigger a need for a permit application and or a DP plan (if any) so can decide what work maintenance work may be performed immediately prior to a New Tenant and what must be deferred to be budgeted / performed at a later date after drawings, permit applications, etc. |