Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Parcel Search

 
Parcel Attributes
Parcel12517035A
JurisdictionTucson
City of Tucson ZoningC-1, R-1
Tucson WardWard 6
Rio Nuevo Multipurpose Facilities DistrictYes
Tucson Registered NeighborhoodEl Montevideo
Major Streets & Routes

Gateway Route

,

Intersection Buffer

Pima County Data Assessor, Recorder, Treasurer, ...
Parcel Map Map
Addresses

Annexations & Original City Zoning (OCZ)

Date - 11/23/2024 8:59 a.m.
Total Number Of OZC Plans - (1)
Plan Description Annexation Ordinance Effective Date OCZ Ordinance
C9-55-77 Pima To 22nd. Street, City Limits Out to Craycroft Road 1634 12/05/1955 2856

Rezoning Cases

Date - 11/23/2024 8:59 a.m.
Total Number Of Rezone Cases - (1)
Case No. Description New Zone Status Status Date Address
C9-71-07 Rolling & Bacon Development Co - El Camino Del Norte R-2 Denied 09/21/2011 E BROADWAY

Special Development Requests & Requirements

Date - 11/23/2024 8:59 a.m.
Total Number Of Special Development Permits - (1)
Activity Number Status Apply Date Expired Date Type Description
T16SA00342 Complete N/A

Permits

Parcel Number - 12517035A
Date - 11/23/2024 8:59 a.m.
Total Number Of Permits - (16)
Permit Permit Status Entered Date Expired Date Unit Type Description
T22OT00144 Issued 02/28/2022 08/27/2022 Sign - Permanent 1-cOFc ILLUM DF
TR-UTL-0824-01584 Complete 08/22/2024 10/30/2024 Right-of-Way (ROW) - Utility C.3036326- ACCESSS MH 10272, MH 9087, MH 9093, & MH 9330 FOR SPLICING
TR-UTL-1022-00003 Complete 10/27/2022 02/13/2023 Right-of-Way (ROW) - Utility P.049156 - We are placing and splicing in MH 9678 to customer property. All placement is being done beyond city ROW.
T02CM05120 C of o 11/05/2002 01/19/2004 COMBO TI:OFFICE
T03OT01470 Expired 08/15/2003 08/11/2004 SIGN SIGN:5919
T04OT01952 Final 09/28/2004 05/02/2005 SIGN SIGN:7847 MERRY CARNELL SCHLECHT, INC
T13OT00598 Expired 05/17/2013 11/18/2013 C-OF-O C OF O
T16CM06920 C of o 09/08/2016 08/26/2017 COMBO TI: OFFICE
T16OT01241 Final 10/12/2016 04/19/2017 SIGN 1- CHANGE OF COPY ON EXISTING DF
T16RW02079 Final 10/19/2016 12/18/2016 ROW RISER DOWN 55' BORE ACROSS SIDEWALK 150' TRENCH BORE HEADING NORTH ON EL CAMINO DEL NORTE 185' TRENCH BORE HEADING EAST ON E CALLE ALTAR CONTINUE 25' TO ROW WORK ORDER # 41520160000CTY0481
T20RW00955 Final 02/14/2020 05/19/2020 ROW N.673522 - JOB WILL REQUIRE ACCESS TO MH#10272 AND MH #9807 TO SPLICE AND PLACE FIBER
T20RW05653 Final 10/15/2020 11/21/2020 ROW N.782245-2- ALONG BROADWAY BLVD EAST OF NEW CAMINO DEL NORTE ACCESS EXISTING MH 9807 FOR SPLICING WORK ON EXISTING CABLE. 1) From Thanksgiving Day to January 2, 2021 Broadway Blvd. Is under Holiday Restrictions. The Bus lane shall reopen prior to Thanksgiving day and remain open until January 2, 2021. 2) Blue Business Access shall be placed at the entrance to all business ingress/ egress. ADDRESS ON APPLICATION: 3485 E BROADWAY BLVD
T20RW05696 Final 10/19/2020 11/21/2020 ROW N.792278-3- ALONG E. BROADWAY BLVD EAST OF EL CAMINO DEL MORTE ACCESS MH 9807 FOR SPLICING WORK. ADDRESS ON APPLICATION: 3455 E BROADWAY
T20RW05927 Final 10/30/2020 12/02/2020 ROW N.799533-2 - JOB WILL REQUIRE ACCESS TO MANHOLE #9807 TO SPLICE EXISTING FIBER ON E BROADWAY BL ** PERMIT END DATE HAS BEEN MODIFIED DUE TO HOLIDAY RESTRICTION BEGINNING NOVEMBER 26, 2020 - JANUARY 3, 2021 **
T20RW06223 Final 11/17/2020 04/03/2021 ROW N.805214 - Job will require MH #9807 access to splice existing fibers on E Broadway Blvd (East of El Camino Del Norte). Place Business Access signs if applicable
T21RW00179 Final 01/13/2021 08/18/2021 ROW 22nd ST TO EL CON - PHASE 4 - OVERHEAD LINE CONNECTION TEP will be replacing multiple poles in the area of Broadway and Alvernon. All replacements will be of similar size and placement as the originals. A new pole is being placed behind sidewalk on the east side of Alvernon, north of Timrod. The new pole will be similar diameter but shorter than the existing poles. TEP will also be replacing multiple pad mount transformers in the same area. All transformers will stay in the existing positions. 04/16/2021 - REVISED APPROVED TNE (ATTACHED) FOR OVERNIGHT WORK BEGINNING APRIL 21, 2021 THROUGH MAY 21, 2021. - R3