Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Parcel Search
 
Parcel Attributes
Parcel12418281A
JurisdictionTucson
City of Tucson ZoningR-2
Proposed ZoningI-1
Tucson WardWard 5
Tucson Registered NeighborhoodMillville
Major Streets & Routes

Gateway Route

,

Intersection Buffer

Pima County Data Assessor, Recorder, Treasurer, ...
Parcel Map Map
Address

Annexations & Original City Zoning (OCZ)

Date - 10/23/2024 10:33 p.m.
Total Number Of OZC Plans - (1)
Plan Description Annexation Ordinance Effective Date OCZ Ordinance
3/4 Mile East To Campbell Avenue 486 06/14/1919 None

Rezoning Cases

Date - 10/23/2024 10:33 p.m.
Total Number Of Rezone Cases - (1)
Case No. Description New Zone Status Status Date Address
C9-20-01 C9-20-01 Naifeh - 22nd Street I-1 Authorized 01/09/2020 E 22ND

Permits

Parcel Number - 12418281A
Date - 10/23/2024 10:33 p.m.
Total Number Of Permits - (25)
Permit Permit Status Entered Date Expired Date Unit Type Description
TR-ROW-0124-00080 Complete 01/18/2024 03/20/2024 Right-of-Way (ROW) Gauge and sample one groundwater monitoring wells (2 hour). Work zone is Kino Pkwy S/B off-ramp.
TR-ROW-0123-00287 Complete 01/23/2023 03/22/2023 Right-of-Way (ROW) Sample two groundwater monitoring wells (2 hours). Work zones are in the Kino Parkway N/B exit ramp for the first well and Kino Pkwy S/B off-ramp for the other. Also, measure water level at a groundwater monitoring well (30 minutes) at the 1415 S Cherry Ave., Tucson, AZ 85713 address.
TR-ROW-0723-00953 Denied 07/14/2023 N/A Right-of-Way (ROW) Denied - As Submitted - Please Submit each Well Location as individual permits - Sample two groundwater monitoring wells (2 hours). Work zones are in the Kino Parkway N/B exit ramp for the first well and Kino Pkwy S/B off-ramp for the other. Also, measure water level at a groundwater monitoring well (30 minutes) at the 1415 S Cherry Ave., Tucson, AZ 85713 address.
TR-ROW-0723-00962 Complete 07/17/2023 09/27/2023 Right-of-Way (ROW) Sample one groundwater monitoring well (1 hour). Work zone is in Kino Pkwy S/B off-ramp.
TR-ROW-0724-00818 Complete 07/17/2024 09/19/2024 Right-of-Way (ROW) Gauge and sample one groundwater monitoring wells (1 hour). Work zone is Kino Pkwy S/B off-ramp.
TR-ROW-0924-01123 Needs resubmittal 09/25/2024 N/A Right-of-Way (ROW) Gauge and sample one groundwater monitoring wells (2 hour). Work zone is Kino Pkwy S/B off-ramp.
TR-ROW-0924-01138 Needs resubmittal 09/27/2024 N/A Right-of-Way (ROW) Gauge and sample one groundwater monitoring wells (2 hour). Work zone is Kino Pkwy S/B off-ramp.
TR-ROW-0923-01206 Issued 09/29/2023 12/13/2023 Right-of-Way (ROW) Gauge fluid level and sample a groundwater monitoring well (1 hour). Location is in Kino Pkwy S/B off-ramp.
TR-ROW-1024-01155 Inspections 10/01/2024 11/21/2024 Right-of-Way (ROW) Gauge and sample one groundwater monitoring wells (2 hour). Work zone is Kino Pkwy S/B off-ramp.
T15TC01060 Expired 05/05/2015 N/A BARRICAD SIGN INSTALLATION
T17RW00010 Final 01/03/2017 02/02/2017 ROW REPAIR PEDESTRIAL RAIL EXPANSION JOINT ON TOP OF KINO PW OVER 22ND ST
T17RW04246 Final 09/26/2017 11/01/2017 ROW MEASURE A GROUNDWATER MONITORING WELL (1 HOUR) LOCATION IS IN KINO PKWY S/B OFF RAMP
T18RW02017 Final 05/03/2018 06/06/2018 ROW SAMPLE A GROUNDWATER MONITORING WELL( (1 HOUR) LOCATION IS IN KINO PKWY S/B OFF RAMP MW-22-38
T18RW03489 Final 08/06/2018 09/12/2018 ROW SAMPLE A GROUNDWATER MONITORING WELL( (1 HOUR) WORK ZONE IS ON KINO PKWY S/B OFF-RAMP MW-22-38
T19RW04466 Final 08/16/2019 09/15/2019 ROW Sample a groundwater monitoring well (1 hour). Location is in Kino Pkwy S/B off-ramp.
T19RW06718 Final 11/01/2019 12/31/2019 ROW N.535352 JOB WILL REQUIRE ACCESS TO HH #11887 TO PLACE NEW FIBER
T20RW00765 Final 02/07/2020 03/19/2020 ROW SAMPLE A GROUNDWATER MONITORING WELL (1 HOUR). LOCATION IS IN KENO PKWY S/B OFF-RAMP.
T20RW04567 Final 08/11/2020 09/23/2020 ROW Sample a groundwater monitoring well (1 hour). Location is in Kino Pkwy S/B off-ramp. INGRESS/ EGRESS FOR BUSINESS AND RESIDENTIAL ACCESS SHALL BE MAINTAINED. FIELD ADJUSTMENTS MAY BE REQUIRED. PAVEMENT PATCHING IS NECESSARY WHERE PAVEMENT IS CUT. PATCH LIMITS- THE LIMITS OF THE PAVING SHALL BE A MINIMUM OF 1-FT OUTSIDE THE EXCAVATION. POTHOLES SPACED CLOSELY TOGETHER AND WITHIN 8-FT OF EACH OTHER WILL NEED TO BE JOINED TOGETHER BY ONE SURFACE PATCH. BACKFILL WITH CLSM SLURRY OR AGGREGATE BASE COURSE (ABC.) ASPHALTIC CONCRETE USED SHALL BE CITY OF TUCSON MIX NO. 3 OR COT MIX NO. 2 WITH TR-22, INSPECTOR TO ADVISE. REPLACE/ REFRESH ALL STRIPING THAT IS INTERRUPTED BY PATCHES. REPAIR ALL LANDSCAPING DISTURBED. THIS INCLUDES IRRIGATION, PLANTINGS, GROUNDCOVER, AND HARDSCAPE. GOOD HOUSEKEEPING MEASURES SHALL BE PRACTICED DURING WORK AND CONSTRUCTION.
T21RW00132 Final 01/11/2021 02/27/2021 ROW KINO & 22ND ST ARTWORK RESTORATION INSTALLATION (South) NO. 212574 IN THE SOUTH BOUND BRIDGE ON KINO PKY OVER 22ND ST. Trucking a 30ft tall aluminum structure to the site and using a crane to lift the structure into place and secure it. This is 1 of 5 other existing structures. The footing has been in place for a few years and this will be a replacement piece.
T21RW00683 Final 02/10/2021 03/24/2021 ROW SAMPLE A GROUND WATER MONITORING WELL (1 hour). WORK ZONE IS IN KINO PARKWAY S/B EXIT RAMP.
T21RW01095 Final 03/09/2021 04/17/2021 ROW SAMPLE A GROUNDWATER MONITERING WELL (2 HOUR). LOCATION IS IN KINO PKWY S/B OFF RAMP
T21RW02290 Final 05/11/2021 06/26/2021 ROW Kino Artwork Restoration & Installation No. 212574 KINO & 22ND ARTWORK INSTALLATION. WORKSITE IS ON KINO PW OVERPASS.
T21RW03749 Final 08/13/2021 09/29/2021 ROW SAMPLE OF GROUNDWATER MONITORING WELL (1 hour). LOCATION IS IN KINO PKWY S/B OFF-RAMP. INGRESS/ EGRESS FOR BUSINESS AND RESIDENTIAL ACCESS SHALL BE MAINTAINED. FIELD ADJUSTMENTS MAY BE REQUIRED. PAVEMENT PATCHING IS NECESSARY WHERE PAVEMENT IS CUT. PATCH LIMITS- THE LIMITS OF THE PAVING SHALL BE A MINIMUM OF 1-FT OUTSIDE THE EXCAVATION. POTHOLES SPACED CLOSELY TOGETHER AND WITHIN 8-FT OF EACH OTHER WILL NEED TO BE JOINED TOGETHER BY ONE SURFACE PATCH. BACKFILL WITH CLSM SLURRY OR AGGREGATE BASE COURSE (ABC.) ASPHALTIC CONCRETE USED SHALL BE CITY OF TUCSON MIX NO. 3 OR COT MIX NO. 2 WITH TR-22, INSPECTOR TO ADVISE. REPLACE/ REFRESH ALL STRIPING THAT IS INTERRUPTED BY PATCHES. REPAIR ALL LANDSCAPING DISTURBED. THIS INCLUDES IRRIGATION, PLANTINGS, GROUNDCOVER, AND HARDSCAPE. GOOD HOUSEKEEPING MEASURES SHALL BE PRACTICED DURING WORK AND CONSTRUCTION.
T22RW00673 Final 02/25/2022 04/08/2022 ROW Sample a groundwater monitoring well (1 hour). Location is in Kino Pkwy S/B off-ramp. PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING. PAVEMENT PATCH TYPE SHALL BE IN CONFORMANCE TO THE CURRENT EDITION OF THE CITY OF TUCSON PUBLIC UTILITY ADMINISTRATIVE MANUAL. IN THE EVENT THAT WEEKEND OR AFTER-HOURS WORK IS INTENDED, CONTACT COT INSPECTION STAFF. DAN ROBERTSON AT 520-400-6722 OR TOM ADKINS AT 520-400-3813. 1. INGRESS/ EGRESS FOR BUSINESS AND RESIDENTIAL ACCESS SHALL BE MAINTAINED. FIELD ADJUSTMENTS MAY BE REQUIRED. 2. PAVEMENT PATCHING IS NECESSARY WHERE PAVEMENT IS CUT. PATCH LIMITS- THE LIMITS OF THE PAVING SHALL BE A MINIMUM OF 1-FT OUTSIDE THE EXCAVATION. 3. POTHOLES SPACED CLOSELY TOGETHER AND WITHIN 8-FT OF EACH OTHER WILL NEED TO BE JOINED TOGETHER BY ONE SURFACE PATCH. 4. BACKFILL WITH CLSM SLURRY OR AGGREGATE BASE COURSE (ABC.) 5. ASPHALTIC CONCRETE USED SHALL BE CITY OF TUCSON MIX NO. 3 OR COT MIX NO. 2 WITH TR-22, INSPECTOR TO ADVISE. 6. REPAIR ALL LANDSCAPING DISTURBED. THIS INCLUDES IRRIGATION, PLANTINGS, GROUNDCOVER, AND HARDSCAPE. 7. GOOD HOUSEKEEPING MEASURES SHALL BE PRACTICED DURING WORK AND CONSTRUCTION 8. MAINTAIN PEDESTRIAN ACCESS 9. IN THE EVENT THAT WEEKEND OR AFTER-HOURS WORK IS INTENDED, CONTACT COT INSPECTION STAFF. IF WEEKEND WORK, MAKE CONTACT 48 HOURS PRIOR TO THE WEEKEND. DAN ROBERTSON- 520-400-6722 OR TOM ADKINS- 520-400-3813
T22RW02940 Final 08/15/2022 09/22/2022 ROW Sample a groundwater monitoring well (1 hour). Location is in Kino Pkwy S/B off-ramp. ** PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING PAVEMENT PATCH TYPE SHALL BE IN CONFORMANCE TO THE CURRENT EDITION OF THE CITY OF TUCSON PUBLIC UTILITY ADMINISTRATIVE MANUAL. UNDER A PAVEMENT MORATORIUM, ANY NEW ASPHALT THAT IS DISTURBED WILL REQUIRE A 2” MILL AND OVERLAY FOR 50’ IN EACH DIRECTION FROM THE OUTSIDE OF THE CUT FOR ALL EFFECTED TRAVEL LANES.

Code Enforcement

Parcel Number - 12418281A
Date - 10/23/2024 10:33 p.m.
Total Number Of Code Cases - 2
Case Number Case Status Entered Date Closed Date Unit Type Description
CE-VIO0524-01942 Closed - resolved 05/22/2024 07/16/2024 Code Enforcement Case HCAMP - one mattress structure shopping cart and wood box shade.
T12DV06971 Complian 08/13/2012 N/A DNR_VIOL VEGETATION OVERGROWTH

Plans

Parcel Number - 12418281A
Date - 10/23/2024 10:33 p.m.
Total Number Of Plans - 2
Plan Number Plan Status Application Date Expired Date Unit Type Description
C9-20-01 Authorized 01/09/2020 N/A Map/Use Changes - Entitlements C9-20-01 Naifeh - 22nd Street - Rezoning to I-1 for manufaturing, assembly and warehouse uses.
T19PRE0185 Plan ck 10/04/2019 N/A NEIGHBORHOOD NOTIFICATION