Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Parcel Search

 
Parcel Attributes
Parcel124051340
JurisdictionTucson
City of Tucson ZoningR-2, R-3
Tucson WardWard 6
Tucson Registered NeighborhoodWest University
Major Streets & Routes

Arterial or Collector

,

Intersection Buffer

Pima County Data Assessor, Recorder, Treasurer, ...
Parcel Map Map
Addresses

Annexations & Original City Zoning (OCZ)

Date - 11/14/2024 5:45 p.m.
Total Number Of OZC Plans - (1)
Plan Description Annexation Ordinance Effective Date OCZ Ordinance
1/4 Mile Each Direction (N, E, S, W) 202 08/17/1905 None

Rezoning Cases

Date - 11/14/2024 5:45 p.m.
Total Number Of Rezone Cases - (1)
Case No. Description New Zone Status Status Date Address
C9-12-01 C9-12-01 Main Gate Dist. (UOD) UOD Effectuated 01/05/2012 N EUCLID

Permits

Parcel Number - 124051340
Date - 11/14/2024 5:45 p.m.
Total Number Of Permits - (5)
Permit Permit Status Entered Date Expired Date Unit Type Description
T14EX00727 Closed 06/18/2014 08/17/2014 EXCAV POTHOLE EXISTING WATER LINE BEHIND EAST SIDEWALK OF EUCLID AT 5TH STREET.
T15EX01478 Expired 06/03/2015 08/02/2015 EXCAV INSTALLATION OF PEDESTRAIN/BICYCLE HAWK CROSSING CAPITAL PROJECT # SP11
T15TC01379 Final 06/03/2015 N/A BARRICAD INSTALLATION OF PEDESTRAIN/BICYCLE HAWK CROSSING CAPITAL PROJECT # SP11
T18RW04466 Final 10/04/2018 11/07/2018 ROW MANHOLE ACCESS
T22RW00597 Final 02/18/2022 03/27/2022 ROW COLUMBUS / GLENN CROSSWALK AND MISC., JOC FOR STRIPING, CONTRACT 181942-02 Replace existing Static Advance Ped sign with Advance Ped Solar Blinkersign on a pre-assembled sign/pole combination. Work will take approximately 20 minutes. Where possible, vehicles will be parked on a side street or in a parking spot, or Median and the sign carried to and installed at the desired location on the sidewalk. NO LANES OF TRAVEL WILL BE IMPACTED. ADDRESS ON PERMIT IS FOR PERMITTING PURPOSES ONLY. ** PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING.