Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Parcel Search
 
Parcel Attributes
Parcel12317050A
JurisdictionTucson, Pima County
Water Course

Street

City of Tucson ZoningR-1
Tucson WardWard 6
Tucson Registered NeighborhoodDesert Mallow
Pima County Data Assessor, Recorder, Treasurer, ...
Parcel Map Map
Address
Parcel Attributes Issue?

Annexations & Original City Zoning (OCZ)

Date - 08/17/2026 9:26 a.m.
Total Number Of OZC Plans - (1)
Plan Description Annexation Ordinance Effective Date OCZ Ordinance
3/4 Mile East To Campbell Avenue 486 07/13/1919

Special Development Requests & Requirements

Date - 08/17/2026 9:26 a.m.
Total Number Of Special Development Permits - (1)
Activity Number Status Apply Date Expired Date Type Description
H000007634 Closed N/A

Permits

Parcel Number - 12317050A
Date - 08/17/2026 9:26 a.m.
Total Number Of Permits - (2)
Permit Permit Status Entered Date Expired Date Unit Type Description
T21RW00565 Final 02/03/2021 03/17/2021 ROW NON-DESTRUCTIVE VACUUM EXCAVATION (POTHOLING) TO EXPOSE EXISTING UTILITIES WITH THE PURPOSE OF CONFIRMING LOCATION AND ELEVATION OF THOSE UTILITIES. THIS WORK IS BEING PERFORMED IN SUPPORT OF DESIGN FOR FUTURE CONSTRUCTION AT THE UNIVERSITY OF ARIZONA CAMPUS.
T21RW03417 Final 07/21/2021 09/02/2021 ROW TWO WATER MAIN TAPS, ONE ON HELEN ST AND THE OTHER ON VINE AV. ** PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING. INGRESS/ EGRESS FOR BUSINESS AND RESIDENTIAL ACCESS SHALL BE MAINTAINED. FIELD ADJUSTMENTS MAY BE REQUIRED. PAVEMENT PATCHING IS NECESSARY WHERE PAVEMENT IS CUT. PATCH LIMITS- THE LIMITS OF THE PAVING SHALL BE A MINIMUM OF 1-FT OUTSIDE THE EXCAVATION. POTHOLES SPACED CLOSELY TOGETHER AND WITHIN 8-FT OF EACH OTHER WILL NEED TO BE JOINED TOGETHER BY ONE SURFACE PATCH. BACKFILL WITH CLSM SLURRY OR AGGREGATE BASE COURSE (ABC.) ASPHALTIC CONCRETE USED SHALL BE CITY OF TUCSON MIX NO. 3 OR COT MIX NO. 2 WITH TR-22, INSPECTOR TO ADVISE. REPAIR ALL LANDSCAPING DISTURBED. THIS INCLUDES IRRIGATION, PLANTINGS, GROUNDCOVER, AND HARDSCAPE. GOOD HOUSEKEEPING MEASURES SHALL BE PRACTICED DURING WORK AND CONSTRUCTION MAINTAIN PEDESTRIAN ACCESS