Parcel Search: 12108075C
Parcel Search
Parcel Attributes
| Parcel | 12108075C |
|---|---|
| Jurisdiction | Tucson, Pima County |
| City of Tucson Zoning | R-3, R-2 |
| Tucson Ward | Ward 6 |
| Major Street & Route | Arterial or Collector |
| Pima County Data | Assessor, Recorder, Treasurer, ... |
| Parcel Map | Map |
| Addresses | |
| Parcel Attributes Issue? | |
Annexations & Original City Zoning (OCZ)
Date - 08/17/2026 8:10 a.m.
Total Number Of OZC Plans - (1)
Permits
Parcel Number - 12108075C
Date - 08/17/2026 8:10 a.m.
Total Number Of Permits - (16)
| Permit | Permit Status | Entered Date | Expired Date | Unit | Type | Description |
|---|---|---|---|---|---|---|
| TC-COM-0124-00087 | Withdrawn | 01/15/2024 | 07/13/2024 | Commercial Building | 2 new 18' x 18' cantilever shades (no uTILITIES SUCH AS eLECTRIC) | |
| TD-DEV-0224-00062 | Issued | 02/28/2024 | 07/19/2027 | Development Package | Restricted Access - FREESTANDING SHADE STRUCTURES | |
| TC-COM-0424-00718 | Complete | 04/22/2024 | 01/15/2025 | Commercial Building | Two new shade structure (No lights/NO Utilities such as Electric) | |
| TR-UTL-0423-01374 | Complete | 04/24/2023 | 06/02/2023 | Right-of-Way (ROW) - Utility | P.107547-1: ACCESS OF EX MH 24860 FOR SPLICING | |
| TR-UTL-0423-01375 | Complete | 04/24/2023 | 06/02/2023 | Right-of-Way (ROW) - Utility | P.107547-2: ACCESS OF EX HH 23641 FOR SPLICING | |
| TR-UTL-0423-01376 | Complete | 04/24/2023 | 07/02/2023 | Right-of-Way (ROW) - Utility | P.107547-3: REMOVAL OF (2) PEDS & REPLACE WITH (1) NEW BIG SHOT AND (1) NEW PED | |
| TR-ROW-0526-00558 | Needs resubmittal | 05/08/2026 | N/A | Right-of-Way (ROW) | ||
| TR-ROW-0526-00558 | Needs resubmittal | 05/08/2026 | N/A | BLDG A | Right-of-Way (ROW) | |
| TR-ROW-0526-00569 | In review | 05/11/2026 | N/A | Right-of-Way (ROW) | HAWK PROJECT ***High-Intensity Activated Crosswalk*** | |
| TR-ROW-0626-00665 | Issued | 06/02/2026 | 10/06/2026 | Right-of-Way (ROW) | T049201C HIGH INTENSITY ACTIVATED CROSSWALK 08/11/2026 - Request for 30 Day Renewal as of 09/06/2026 Permit Renewal Notice Effective July 1, 2026, the Mayor and Council approved and implemented a new fee structure and updated application requirements for right-of-way permits. Permits issued prior to July 1, 2026, under the previous fee structure, are eligible for one final renewal for a maximum of 30 days. The previous 60- and 90-day renewal options are no longer available. If work extends beyond the 30-day renewal period, a new permit application must be submitted. The new application must comply with the current fee structure and include all required project information, including the actual number of days traffic control and/or lane closures will be in place (not the permit duration) and the length × width (L × W) of all pavement cuts. | |
| T19BU00358 | Canceled | 06/26/2019 | N/A | BLDG 4 | Demolition Permit | DEMO |
| T19BU00359 | Canceled | 06/26/2019 | N/A | BLDG 6 | Demolition Permit | DEMO |
| DP19-0188 | Complete | 08/07/2019 | 02/08/2021 | Development Package | RESTRICTED RECORD - SITE/GRADING/SWPPP - Leman Academy, charter school. | |
| T20CM06313 | Final | 09/14/2020 | 06/09/2021 | BLDG 6 | COMBO | T.I. - NEW MULTI USER HAND SINKS INSIDE SCHOOL EXIST. MULTI-PURPOSE RMS |
| T20RW02601 | Final | 05/07/2020 | 08/09/2020 | ROW | LEMAN ACADAMY OF EXCELLENCE, DP19-0188 REMOVAL AND REPLACEMENT OF @ 200 LF OF SIDEWALK PER DP 19-0188 WHICH INVOLVES CLOSING THREE EXISTING DRIVEWAY ENTRANCES, INSTALLING A NEW DRIVEWAY WITH CURB RETURNS AND ACCESS RAMPS AND REPLACING THE CURB ACCESS RAMPS AT THE SE CORNER OF LEE ST AND ROOK AVE. | |
| T20RW04533 | Final | 08/10/2020 | 09/09/2020 | ROW | 2009841 INSTALLING NEW 1" WATER SERVICE @ 5 LF IN STREET ASPHALT & DIRT BEHIND CURB. |
Plans
Parcel Number - 12108075C
Date - 08/17/2026 8:10 a.m.
Total Number Of Plans - 2
| Plan Number | Plan Status | Application Date | Expired Date | Unit | Type | Description |
|---|---|---|---|---|---|---|
| CWH-19-0188 | Active | 08/07/2019 | 02/08/2021 | Basin | SITE/GRADING/SWPPP - Leman Academy, charter school. | |
| T19BA00043 | Submitted | 10/30/2019 | N/A | Basin | RETENTION BASIN FOR DP19-0188 |