Parcel Search: 11716015A
Parcel Search
Parcel Attributes
| Parcel | 11716015A |
|---|---|
| Jurisdiction | Tucson, Pima County |
| City of Tucson Zoning | OCR-2 |
| Tucson Ward | Ward 6 |
| Tucson Downtown Incentive Zone | Downtown Infill Incentive District, Downtown Core |
| Rio Nuevo Downtown | Rio Nuevo - Downtown |
| Rio Nuevo Multipurpose Facilities District | Yes |
| Redevelopment | Downtown Redevelopment District |
| Tucson Registered Neighborhood | Downtown |
| National Register Historic District | Downtown Tucson Historic District |
| Pima County Data | Assessor, Recorder, Treasurer, ... |
| Parcel Map | Map |
| Addresses | |
| Parcel Attributes Issue? | |
Annexations & Original City Zoning (OCZ)
Date - 06/25/2026 3:48 p.m.
Total Number Of OZC Plans - (1)
| Plan | Description | Annexation Ordinance | Effective Date | OCZ Ordinance |
|---|---|---|---|---|
| Original Town Of Tucson | ORIGINAL | 08/07/1877 |
Permits
Parcel Number - 11716015A
Date - 06/25/2026 3:48 p.m.
Total Number Of Permits - (30)
| Permit | Permit Status | Entered Date | Expired Date | Unit | Type | Description |
|---|---|---|---|---|---|---|
| TR-UTL-0226-00343 | Withdrawn | 02/19/2026 | N/A | Right-of-Way (ROW) - Utility | 02/23/2026- Withdrawn permit due to customer request. COX TO TRENCH 13' and BORE 140' TO INSTALL NEW CATV CONDUIT FOR SYSTEM TIE | |
| TR-ROW-0626-00677 | Needs resubmittal | 06/03/2026 | N/A | Right-of-Way (ROW) | Renewing the permit for the street pole banners in the downtown business improvement district. Approximately 156 street poles. | |
| TR-ROW-0625-00798 | Complete | 06/12/2025 | 06/15/2026 | Right-of-Way (ROW) | Installation of 104 pole banners in and around the city's downtown area. Traffic control will be via bucket-truck. (6/13/2025 Standard Pre-warning Signs and Truck mounted strobe light to be required during work, per DTM Eng review) | |
| TR-ROW-0823-01080 | Complete | 08/22/2023 | 09/16/2023 | BLDG 1 | Right-of-Way (ROW) | Demonstration of 2 way bike lane 9-15-23 6am to 3:30pm. PO# Parking Day. |
| T18CM08830 | Canceled | 11/05/2018 | N/A | Residential Building - One or Two Family | new sfr | |
| T11EX00630 | Closed | 12/22/2011 | 02/20/2012 | EXCAV | EXCAVATION, BACKFILL AND ALL SURFACE REPAIRS | |
| T11EX00631 | Closed | 12/22/2011 | 02/20/2012 | EXCAV | EXCAVATION, BACKFILL AND ALL SURFACE REPAIRS | |
| T12BU00217 | Void | 02/14/2012 | N/A | TEMP-FBB | THREE CONSTRUCTION TRAILERS W/ELECTRIC | |
| T12BU00230 | Withdrwn | 02/16/2012 | N/A | 01 | GRADSWPP | GRADING REVIEW PER ERNIE DUARTE |
| T12BU00970 | Closed | 08/16/2012 | 04/05/2023 | SPKLR | Install 346' of 8" & 195' of 6" fire underground piping | |
| T12EX00384 | Closed | 07/16/2012 | 09/14/2012 | EXCAV | TRENCHING FOR INSTALLING 2318 LF OF WATER LINE PER TUCSON WATER PLAN 2-124-2011 | |
| T13EX00379 | Closed | 03/14/2013 | 05/13/2013 | EXCAV | TRENCHING AT 4 LOCATIONS TO PLACE SEWER LINES AND MANHOLES PER PC RWRD PLAN G-2012-23. TRENCHING WILL TAKE PLACE ON TOOLE AVE BETWEEN STONE AVE AND 6TH AVE. TOOLE AVE IS UNDER A PAVEMENT CUT MORATORIUM UNTIL SEPT 2015 AND WILL REQUIRE A 2" MILL AND INLAY ON 50' ON EACH SIDE OF THE TRENCH FOR THE FULL WIDTH OF THE AFFECTED TRAVEL LANES. ASPHALT MUST MEETING MATCH EXISTING SURFACE COURSE. | |
| T15OT00469 | Void | 04/07/2015 | 10/04/2015 | SIGN | SIGN | |
| T16EX00785 | Withdrwn | 03/14/2016 | N/A | EXCAV | REMOVE, MODIFY AND RE-INSTALL EXISTING BUS SHELTER CITY PROJECT-TOM FISHER/PROJECT MANAGER PLEASE CALL PARK TUCSON AT 520-791-5071; THIS IS A PERMIT AREA. This project is located in an Archaeological Sensitivity Zone. An Archaeological Monitor hired by the permit applicant is required to be on-site during any digging, unless a waiver is issued. Monitoring reports are to be submitted to Jonathan Mabry, Historic Preservation Office, City of Tucson, P.O. Box 27210, Tucson, AZ 85726.** Contact Jonathan Mabry at 520-837-6968 or jonathan.mabry@tucsonaz.gov with any questions. | |
| T16EX01868 | Void | 05/16/2016 | N/A | EXCAV | test | |
| T16EX02266 | Expired | 06/10/2016 | 08/12/2016 | EXCAV | TEP TO INSTALL 1 ANCHOR. TRAFFIC CONTROL WILL BE REQUIRED TO PARK IN ROW TO WORK ON EXISTING POLES 225 S STONE AVE. WAS LISTED ON APP. | |
| T16TC00634 | Withdrwn | 03/14/2016 | N/A | BARRICAD | REMOVE, MODIFY AND RE-INSTALL EXISTING BUS SHELTER CITY PROJECT-TOM FISHER/PROJECT MANAGER | |
| T16TC01434 | Final | 06/10/2016 | N/A | BARRICAD | TEP TO INSTALL 1 ANCHOR. TRAFFIC CONTROL WILL BE REQUIRED TO PARK IN ROW TO WORK ON EXISTING POLES 225 S STONE AVE. WAS LISTED ON APP. | |
| T17RW03181 | Expired | 07/26/2017 | 08/30/2017 | ROW | LANE CLOSURE REQUIRED TO MOVE EXISTING EQUIPMENT 08/07/2017-PLAN CHANGE-R1 CHANGED TRAFFIC CONTROL PLAN AND COMPANY | |
| T18CM05460 | Withdrwn | 07/12/2018 | N/A | COMBO | SOLAR PHOTOVOLTAIC PARKING CANOPY | |
| T18RW04146 | Final | 09/17/2018 | 11/17/2018 | ROW | N.416762 - Job requires access to MH# 465 and MH# 419 on NW and NE corner of Grossetta Ave & E Alameda St. NOTE: GROSSETA AV IS PIMA COUNTY RIGHT-OF-WAY, THIS PERMIT IS GOOD FOR CITY OF TUCSON RIGHT-OF-WAY ONLY. | |
| T18RW04641 | Final | 10/15/2018 | 12/18/2018 | ROW | ACCESS MANHOLE #465 ALONG E ALAMEDA ST TO SPLICE EXISTING FIBERS | |
| T19RW00665 | Final | 02/06/2019 | 04/06/2019 | ROW | N.427387 - Job requires access to MH# 465 along E Alameda St. to splice existing fibers. This is the same work as the expired permit T18RW04641 ADDRESS ON APPLICATION-54 E ALAMEDA ST | |
| T19RW03359 | Final | 06/13/2019 | 08/13/2019 | ROW | Job requires access to MH# 465 to splice fiber | |
| T19RW05281 | Final | 09/16/2019 | 11/27/2019 | ROW | Boring, excavation, asphalt and concrete restoration for new fiber optic cable installation owned by the Zayo Group. (Black Canary 2 SC) NOTES: OTHER PROJECTS/ACTIVITIES ACTIVE IN AREA, AS A CONTRACTOR YOU MUST COORDINATE WITH EXISTING TRAFFIC CONTROLE AND WORKERS. AS THE CONTRACTOR, YOU MUST FOLLOW THE RUNNING LINE SUBMITTED TO THE CITY, IF DEVIATED, A REVISION MUST BE SUBMITTED AND APPROVED BEFORE CONTINUING WORK. YOU WILL HAVE TO NOTIFY PARKTUCSON 24 HOURS BEFORE WORK, PLEASE READ BELOW FOR CONTACT INFO YOU WILL HAVE TO NOTIFY SUN TRAN 24 HOURS PRIOR TO WORK, PLEASE READ BELOW FOR CONTACT INFO TEMPORARY NOISE EXEMPTION (TNE) IS ATTACHED TO THIS PERMIT, TNE FROM OCTOBER 24, 2019 - NOVEMBER 23, 2019 FROM 6: 00 PM- 6:00 AM Stone and Alameda are under a pavement moratorium, any new asphalt that is disturbed will require a 2" mill and overlay for 50' in each direction from the outside of the cut for all effected travel lanes. This project is located in an Archaeological Sensitivity Zone. An Archaeological Monitor hired by the permit applicant is required to be on-site during any digging, unless a waiver is issued. Monitoring reports are to be submitted to Historic Preservation Office, City of Tucson, P.O. Box 27210, Tucson, AZ 85726.** Please contact Allison Diehl at allison.diehl@tucsonaz.gov with any questions. Caution: Pima County has communication facility that cross Stone Ave at Sta. +/- 40+50 and run north along east side of Stone in sidewalk area. PER R2: DAY WORK GRANTED BETWEEN 9:00 AM - 3:30 PM FOR RESTORATION WORK ONLY. CONTRACTOR SHALL NOT SET UP TRAFFFIC CONTROL PRIOR TO 9:00 AM AND TRAFFIC CONTROL SHELL BE REMOVED PRIOR TO 3:30 PM WORK IN RESIDENTIAL AREA WILL BE PERMITTED DURING 6:00 PM - 10:00 PM NO WORK SHELL BE DONE ON NOVEMBER 11TH 2019 - 7:00 AM- 2:00 PM TO ACCOMMODATE CIVIL EVENT (VETERANS DAY PARADE) POTHOLES/BORE HOLES REPAIRS ARE AS FOLLOWED: * TUCSON MIX (PG 70-10) WILL BE USED ON ALL PATCHING WORK * NO SAW CUTS PERMITTED IN THIS AREA, ASPHALT THAT IS DISTURBED TO FILL POTHOLES, MUST BE A CLEAN CONSISTENT CUTS THAT MEETS PAVEMENT MORATORIUM STANDARDS. *INDIVIDUAL PATCHES SPACED MORE THAN 8 FEET FROM ONE ANOTHER CAN BE DONE. *ALL PATCHES SPACED LESS THAN 8 FEET FROM ONE ANOTHER HAVE BEEN ADDRESSED AND APPROVED TO PATCH PER CLUSTER. CONTRACTOR WILL FOLLOW AND FILL ALL POTHOLES ADDRESSED ON PATCHING PLAN PROVIDED TO THE CITY, AND ATTACHED TO THIS PERMIT. *PATCH WIDTH MUST BE A MINIMUM OF 2 FEET WIDE AND WILL GO FROM THE FACE OF THE CURB TO APPROPRIATE 2 FEET DIMENSION. *IF POTHOLES/BORE HOLES ARE OUTSIDE THE 2 FOOT WIDTH THE PATCH WILL BE ADJUSTED TO THE APPROPRIATE WIDTH TO COVER. * CONGRESS STREET IS THE ONLY EXCEPTION TO THE POTHOLES/BORE HOLES REPAIRS. CONGRESS STREET IS A MILL AND FILL ONLY. PERMIT END DATE HAS BEEN MODIFIED DUE TO HOLIDAY RESTRICTION BEGINNING NOVEMBER 28TH 2019 - JANUARY 2ND 2020. | |
| T19RW06980 | Final | 11/13/2019 | 11/28/2019 | ROW | N.555937 Job will require access to MH#465 to splice fiber. NOTES: PERMIT END DATE HAS BEEN MODIFIED DUE TO HOLIDAY RESTRICTION BEGINNING NOVEMBER 28TH 2019 - JANUARY 2ND 2020. OTHER PROJECTS/ACTIVITIES ACTIVE IN AREA, AS A CONTRACTOR YOU MUST COORDINATE WITH EXISTING TRAFFIC CONTROLE AND WORKERS. YOU WILL HAVE TO NOTIFY SUNTRAN 24 HOURS PRIOR TO WORK SUN TRAN CONTACTS: BEA PAULUS 520-206-8826 CHRISTINA ROCK 520-206-8934 YOU WILL HAVE TO NOTIFY PARK TUCSON 24 HOURS BEFORE WORK, PLEASE READ BELOW FOR CONTACT INFO This project is located in an Archaeological Sensitivity Zone. An Archaeological Monitor hired by the permit applicant is required to be on-site during any digging, unless a waiver is issued. Monitoring reports are to be submitted to Historic Preservation Office, City of Tucson, P.O. Box 27210, Tucson, AZ 85726.** Please contact Allison Diehl at allison.diehl@tucsonaz.gov with any questions. | |
| T20RW00124 | Final | 01/09/2020 | 01/30/2020 | ROW | ASPHALT/CONCRETE RESTORATION FROM FIBER OPTIC CABLE INSTALLATION - BLACK CANARY 2 SC (PREVIOUS NUMBER T19RW05281). USE ASPHALT MIX CITY OF TUCSON MIX #2. SAW CUTS SHALL BE DONE UP TO CURB/CONCRETE AND MUST BE CLEAN CONSISTENT CUTS THAT MEET PAVEMENT MORATORIUM STANDARDS. PATCHES SPACED LESS THAN 8 FEET FROM ONE ANOTHER SHALL BE RESTORED AS ONE CLUSTER PATCH. INDIVIDUAL PATCHES SPACED MORE THAN 8 FEET FROM ONE ANOTHER CAN BE DONE AS A STAND ALONE. * CONGRESS STREET IS A MILL AND FILL ONLY. CONTACT SUN TRAN, BEA PAULUS AT 520-206-8826 &/OR CHRISTINA ROCK AT 520-206-8934 MINIMUM OF 24 HOURS PRIOR TO START OF WORK. CONTRACTOR SHALL NOT SET UP TRAFFIC CONTROL PRIOR TO 9:00 AM AND TRAFFIC CONTROL SHALL BE REMOVED PRIOR TO 3:30 PM ** Permit end date has been modified due to traffic restriction beginning January 31, 2020 - February 16, 2020 (Gem Show). | |
| T20RW04848 | Final | 09/01/2020 | 01/31/2022 | ROW | APPROXIMATELY 156 STREET POLE BANNERS FOR DOWNTOWN REOPENING MARKETING CAMPAIGN IN PARTNERSHIP WITH PIMA COUNTY BACK-TO-BUSINESS INITIATIVE. PLEASE REFER TO MAP FOR STRETCHES OF STREET BANNERS WILL BE INSTALLED AND THE NUMBER OF POLES (BANNERS) ON EACH STRETCH. "WELCOME BACK" "READY FOR YOU" "HOLA - LISTO PARA SERVIR" "CLEAN & SAFE" WITH "DOWNTOWNTUCSON.ORG" AND DTP LOGO TO LEAD PEOPLE TO A LISTING OF OPEN BUSINESSES DOWNTOWN WHO HAVE BEEN CERTIFIED BY THE PC HEALTH DEPT. AS 'READY FOR YOU.' BANNERS TO BE INSTALLED BY DTP ON A SUNDAY/MONDAY EARLY MORNING 4AM-7AM. A SEPARATE TRACK ACCESS APPLICATION WILL BE SUBMITTED TO SUN LINK. POWER DOWN OF STREETCAR OCS LINE WILL BE REQUESTED FOR BANNERS BEING INSTALLED ON CONGRESS AND BROADWAY FOR TIME(S) AFTER THE STREETCAR IS NON-OPERATIONAL. RUSS STONE, MAINTENANCE AND SAFETY SUPERVISOR (520-940-0806) WILL PERFORM INSTALL WITH USE OF DTP BUCKET TRUCK. CITY OF TUCSON NOT RESPONSIBLE FOR REPLACEMENT OF BRACKETS NOR BANNERS MOUNTED ON ANY CITY LIGHT POLES DAMAGED OR REMOVED BY WEATHER OR VEHICLE MAINTAIN BANNERS IN GOOD CONDITION, CHECK AFTER SEVERE WEATHER. REPLACE AS NECESSARY WITH PERMISSION FROM TDOT. SHALL PROVIDE FLAGGERS, KEEP PEDESTRIAN WALKWAYS SAFE, INSTALL DURING NON BUSINESS HOURS AND REPAIR ANY DAMAGE THEY CAUSE. SHALL COORDINATE WITH SUNLINK PRIOR TO STARTNG WORK STONE BETWEEN PENNINGTON AND TOOLE (10 BANNERS) | |
| T20RW05145 | Final | 09/21/2020 | 11/22/2020 | ROW | Starting on the North/West side of Council and Stone pull thru existing 37' East continue going South on Stone Ave 292' Continue East on Alameda 190' to vault. Trench/bore 35' going East and place two vaults to end of ROW. BUS STOP IN THE AREA, CONTACT SUN TRAN DISPATCH, AT 520-206-8934 AND/OR BEA PAULUS AT 520-206-8826 AT LEAST 48-BUSINESS HOURS PRIOR TO START OF WORK FOR COORDINATION. OTHER ACTIVITIES IN THE AREA, WILL NEED TO COORDINATE TRAFFIC CONTROL SETUP WITH EXISTING SETUP. This project is located in an Archaeological Sensitivity Zone. An Archaeological Monitor hired by the permit applicant is required to be on-site during any digging, unless a waiver is issued. Monitoring reports are to be submitted to Historic Preservation Office, City of Tucson, P.O. Box 27210, Tucson, AZ 85726.** Please contact Jodie Brown at Jodie.Brown@tucsonaz.gov with any questions. A NOTICE OF TEMPORARY HOLIDAY RESTRICTION applies to this permit and will be in effect from Thanksgiving Day to January 3. Due to the increasing traffic volume on many of the City’s roads, it is necessary to restrict lane closures on certain roads during the holiday season. ADD BUSINESS ACCESS SIGNS WITHIN TRAFFIC CONTROL DEVICES WHERE APPROPRIATE. INGRESS/ EGRESS FOR BUSINESS AND RESIDENTIAL ACCESS SHALL BE MAINTAINED. FIELD ADJUSTMENTS MAY BE REQUIRED. PAVEMENT PATCHING IS NECESSARY WHERE PAVEMENT IS CUT. PATCH LIMITS- THE LIMITS OF THE PAVING SHALL BE A MINIMUM OF 1-FT OUTSIDE THE EXCAVATION. POTHOLES SPACED CLOSELY TOGETHER AND WITHIN 8-FT OF EACH OTHER WILL NEED TO BE JOINED TOGETHER BY ONE SURFACE PATCH. BACKFILL WITH CLSM SLURRY OR AGGREGATE BASE COURSE (ABC.) ASPHALTIC CONCRETE USED SHALL BE CITY OF TUCSON MIX NO. 3 OR COT MIX NO. 2 WITH TR-22, INSPECTOR TO ADVISE. REPLACE/ REFRESH ALL STRIPING THAT IS INTERRUPTED BY PATCHES. REPAIR ALL LANDSCAPING DISTURBED. THIS INCLUDES IRRIGATION, PLANTINGS, GROUNDCOVER, AND HARDSCAPE. GOOD HOUSEKEEPING MEASURES SHALL BE PRACTICED DURING WORK AND CONSTRUCTION. MAINTAIN PEDESTRIAN ACCESS. MAINTAIN ACCESS TO BUS STOPS AND FOR PEDESTRIAN INGRESS/ EGRESS. | |
| T21RW02719 | Final | 06/04/2021 | 09/08/2021 | ROW | N.865428-1- AT CORNER OF E. ALAMEDA ST AND GROSSETTA AVE ACCESS MH 465 TO SPLICE EXISTING CABLE. ADDRESS ON APPLICATION: 150 N STONE AV PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING. BUS STOP IN THE AREA, CONTACT SUN TRAN, BEA PAULUS AT 520-206-8826 AND/OR CHRISTINA ROCK AT 520-206-8934 24-HOURS PRIOR TO START OF WORK FOR COORDINATION. INGRESS/ EGRESS FOR BUSINESS AND RESIDENTIAL ACCESS SHALL BE MAINTAINED. FIELD ADJUSTMENTS MAY BE REQUIRED. GOOD HOUSEKEEPING MEASURES SHALL BE PRACTICED DURING WORK AND CONSTRUCTION. MAINTAIN PEDESTRIAN ACCESS MAINTAIN ACCESS TO BUS STOPS AND FOR PEDESTRIAN INGRESS/ EGRESS. |