Parcel Search: 11714397B
Parcel Search
Parcel Attributes
| Parcel | 11714397B |
|---|---|
| Jurisdiction | Tucson, Pima County |
| City of Tucson Zoning | HC-3 |
| Tucson Ward | Ward 1 |
| Tucson Registered Neighborhood | Barrio Viejo |
| National Register Historic District | Barrio Libre Historic District |
| Pima County Data | Assessor, Recorder, Treasurer, ... |
| Parcel Map | Map |
| Address | |
| Parcel Attributes Issue? | |
Annexations & Original City Zoning (OCZ)
Date - 11/18/2026 5:32 p.m.
Total Number Of OZC Plans - (1)
| Plan | Description | Annexation Ordinance | Effective Date | OCZ Ordinance |
|---|---|---|---|---|
| Original Town Of Tucson | ORIGINAL | 08/07/1877 |
Rezoning Cases
Date - 11/18/2026 5:32 p.m.
Total Number Of Rezone Cases - (5)
| Case No. | Description | New Zone | Status | Status Date | Address |
|---|---|---|---|---|---|
| C9-74-20 | Barrio Historic District | HB-2 | Effectuated | 07/07/2011 | 635 S 9TH |
| C9-74-20 | Barrio Historic District | HR-2 | Effectuated | 07/07/2011 | 635 S 9TH |
| C9-74-20 | Barrio Historic District | HR-3 | Effectuated | 07/07/2011 | 635 S 9TH |
| C9-74-20 | Barrio Historic District | HR-4 | Effectuated | 07/07/2011 | 635 S 9TH |
| C9-74-20 | Barrio Historic District | HR-42 | Effectuated | 07/07/2011 | 635 S 9TH |
Special Development Requests & Requirements
Date - 11/18/2026 5:32 p.m.
Total Number Of Special Development Permits - (1)
| Activity Number | Status | Apply Date | Expired Date | Type | Description |
|---|---|---|---|---|---|
| T08SA00034 | Closed | N/A |
Permits
Parcel Number - 11714397B
Date - 11/18/2026 5:32 p.m.
Total Number Of Permits - (3)
| Permit | Permit Status | Entered Date | Expired Date | Unit | Type | Description |
|---|---|---|---|---|---|---|
| TC-RES-0926-05452 | In review | 09/30/2026 | N/A | Residential Building - One or Two Family | Roof mount 5.66 kW DC photovoltaic solar system; 13 modules; 13.5 kWh Storage, 1 Tesla Powerwall-3 battery with integrated PV inverter with 2 strings. 200A bus with 200A MCB, interconnection via PCS, Tesla Backup Switch for whole home backup. New 125A subpanel on 60A Breaker. | |
| T08CM00316 | Final | 01/30/2008 | 09/03/2008 | COMBO | 3 KW PhotoVoltaic & SOLAR Water | |
| T08CM02649 | Final | 07/31/2008 | 03/01/2009 | COMBO | REPLACE: SOLAR HOT WATER ON ROOF RELOCATE: PV PANELS |
Plans
Parcel Number - 11714397B
Date - 11/18/2026 5:32 p.m.
Total Number Of Plans - 1
| Plan Number | Plan Status | Application Date | Expired Date | Unit | Type | Description |
|---|---|---|---|---|---|---|
| SD-1026-00138 | Complete | 10/19/2026 | N/A | Special Districts | The project is a roof mounted with 5.66 kW DC and 11.50kW AC photovoltaic solar and storage system with 13 modules, all flush mounted between the 6:12 pitch roof with a 5" gap between the roofline and the bottom of the panels. The solar equipment will be located on the south wall of the residence adjacent to the existing electrical service equipment, screened from public view by existing fence/gate. The battery will be located in the detached garage and will re-use existing conduit. Any new/necessary conduits will be painted to match the home’s exterior. |