Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Parcel Search

 
Parcel Attributes
Parcel117110180
JurisdictionTucson
City of Tucson ZoningHC-3, OCR-2
Tucson WardWard 1
Tucson Downtown Incentive ZoneDowntown Infill Incentive District
Rio Nuevo DowntownRio Nuevo - Downtown
Rio Nuevo Multipurpose Facilities DistrictYes
Tucson Registered NeighborhoodEl Presidio
National Register Historic District

El Presidio Historic District

Structure on National Register of Historic Places

Contributing

Pima County Data Assessor, Recorder, Treasurer, ...
Parcel Map Map
Address

Annexations & Original City Zoning (OCZ)

Date - 11/14/2024 5:25 p.m.
Total Number Of OZC Plans - (1)
Plan Description Annexation Ordinance Effective Date OCZ Ordinance
Original Town Of Tucson ORIGINAL 08/07/1877 None

Rezoning Cases

Date - 11/14/2024 5:25 p.m.
Total Number Of Rezone Cases - (1)
Case No. Description New Zone Status Status Date Address
C9-74-21 El Presidio Historic District HB-2H Effectuated 06/30/2011 N COURT

Special Development Requests & Requirements

Date - 11/14/2024 5:25 p.m.
Total Number Of Special Development Permits - (2)
Activity Number Status Apply Date Expired Date Type Description
H000000089 Closed N/A
H000000177 Closed N/A

Permits

Parcel Number - 117110180
Date - 11/14/2024 5:25 p.m.
Total Number Of Permits - (2)
Permit Permit Status Entered Date Expired Date Unit Type Description
T19RW04029 Final 07/19/2019 11/27/2019 ROW BORING AND SOME TRENCHING TO INSTALL UG FIBER OPTICS CABLE PROPOSED WORK DAYS JULY 22-25TH ADDRESS ON APPLICATION-120 NORTH COURT AV This road is under a pavement moratorium, any new asphalt that is disturbed will require a 2" mill and overlay for 50' in each direction from the outside of the cut for all effected travel lanes. PER R1: Asphalt and concrete restoration for new fiber optic cable installation owned by the Zayo Group. (Black Canary 3) OTHER PROJECTS/ACTIVITIES ACTIVE IN AREA, AS A CONTRACTOR YOU MUST COORDINATE WITH EXISTING TRAFFIC CONTROLE AND WORKERS. YOU WILL HAVE TO NOTIFY SUNTRAN 24 HOURS PRIOR TO WORK SUN TRAN CONTACTS: BEA PAULUS 520-206-8826 CHRISTINA ROCK 520-206-8934 AS THE CONTRACTOR, YOU MUST FOLLOW THE RUNNING LINE SUBMITTED TO THE CITY, IF DEVIATED, A REVISION MUST BE SUBMITTED AND APPROVED BEFORE CONTINUING WORK. TEMPORARY NOISE EXEMPTION (TNE) IS ATTACHED TO THIS PERMIT, TNE FROM OCTOBER 24, 2019 - NOVEMBER 23, 2019 FROM 6: 00 PM- 6:00 AM DAY WORK GRANTED BETWEEN 9:00 AM - 3:30 PM FOR RESTORATION WORK ONLY. CONTRACTOR SHALL NOT SET UP TRAFFFIC CONTROL PRIOR TO 9:00 AM AND TRAFFIC CONTROL SHELL BE REMOVED PRIOR TO 3:30 PM WORK IN RESIDENTIAL AREA WILL BE PERMITTED DURING 6:00 PM - 10:00 PM NO WORK SHELL BE DONE ON NOVEMBER 11TH 2019 - 7:00 AM- 2:00 PM TO ACCOMMODATE CIVIL EVENT (VETERANS DAY PARADE) POTHOLES/BORE HOLES REPAIRS ARE AS FOLLOWED: * TUCSON MIX (PG 70-10) WILL BE USED ON ALL PATCHING WORK * NO SAW CUTS PERMITTED IN THIS AREA, ASPHALT THAT IS DISTURBED TO FILL POTHOLES, MUST BE A CLEAN CONSISTENT CUTS THAT MEETS PAVEMENT MORATORIUM STANDARDS. *INDIVIDUAL PATCHES SPACED MORE THAN 8 FEET FROM ONE ANOTHER CAN BE DONE. *ALL PATCHES SPACED LESS THAN 8 FEET FROM ONE ANOTHER HAVE BEEN ADDRESSED AND APPROVED TO PATCH PER CLUSTER. CONTRACTOR WILL FOLLOW AND FILL ALL POTHOLES ADDRESSED ON PATCHING PLAN PROVIDED TO THE CITY, AND ATTACHED TO THIS PERMIT. *PATCH WIDTH MUST BE A MINIMUM OF 2 FEET WIDE AND WILL GO FROM THE FACE OF THE CURB TO APPROPRIATE 2 FEET DIMENSION. *IF POTHOLES/BORE HOLES ARE OUTSIDE THE 2 FOOT WIDTH THE PATCH WILL BE ADJUSTED TO THE APPROPRIATE WIDTH TO COVER. * CONGRESS STREET IS THE ONLY EXCEPTION TO THE POTHOLES/BORE HOLES REPAIRS. CONGRESS STREET IS A MILL AND FILL ONLY. PERMIT END DATE HAS BEEN MODIFIED DUE TO HOLIDAY RESTRICTION BEGINNING NOVEMBER 28TH 2019 - JANUARY 2ND 2020.
T20RW00123 Final 01/09/2020 01/30/2020 ROW ASPHALT/CONCRETE RESTORATION FROM FIBER OPTIC CABLE INSTALLATION - BLACK CANARY 3 SC (PREVIOUS NUMBER T19RW04029). USE ASPHALT MIX CITY OF TUCSON MIX #2. SAW CUTS SHALL BE DONE UP TO CURB/CONCRETE AND MUST BE CLEAN CONSISTENT CUTS THAT MEET PAVEMENT MORATORIUM STANDARDS. PATCHES SPACED LESS THAN 8 FEET FROM ONE ANOTHER SHALL BE RESTORED AS ONE CLUSTER PATCH. INDIVIDUAL PATCHES SPACED MORE THAN 8 FEET FROM ONE ANOTHER CAN BE DONE AS A STAND ALONE. * CONGRESS STREET IS A MILL AND FILL ONLY. CONTACT SUN TRAN, BEA PAULUS AT 520-206-8826 &/OR CHRISTINA ROCK AT 520-206-8934 MINIMUM OF 24 HOURS PRIOR TO START OF WORK. CONTRACTOR SHALL NOT SET UP TRAFFIC CONTROL PRIOR TO 9:00 AM AND TRAFFIC CONTROL SHALL BE REMOVED PRIOR TO 3:30 PM ** Permit end date has been modified due to traffic restriction beginning January 31, 2020 - February 16, 2020 (Gem Show).

Plans

Parcel Number - 117110180
Date - 11/14/2024 5:25 p.m.
Total Number Of Plans - 3
Plan Number Plan Status Application Date Expired Date Unit Type Description
TP-PRE-0923-00328 Complete 09/21/2023 N/A Pre-Application This application is for the Rio Nuevo Activate El Presidio project. Addresses/parcels listed are adjacent to project sites. The project uses low impact activation principals and the Tucson Shared Spaces Manual for the design. There are nine areas within the El Presidio neighborhood that are included in this project.
TP-PRE-0923-00328 Complete 09/21/2023 N/A BLDG 0 UNIT 200 Pre-Application This application is for the Rio Nuevo Activate El Presidio project. Addresses/parcels listed are adjacent to project sites. The project uses low impact activation principals and the Tucson Shared Spaces Manual for the design. There are nine areas within the El Presidio neighborhood that are included in this project.
TP-PRE-0923-00328 Complete 09/21/2023 N/A UNIT 180 Pre-Application This application is for the Rio Nuevo Activate El Presidio project. Addresses/parcels listed are adjacent to project sites. The project uses low impact activation principals and the Tucson Shared Spaces Manual for the design. There are nine areas within the El Presidio neighborhood that are included in this project.