Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Parcel Search
 
Parcel Attributes
Parcel117083950
JurisdictionTucson
City of Tucson ZoningO-3
Tucson WardWard 5
Tucson Registered NeighborhoodBarrio Santa Rosa
National Register Historic District

Barrio Libre Historic District

Structure on National Register of Historic Places

Contributing

Pima County Data Assessor, Recorder, Treasurer, ...
Parcel Map Map
Address

Annexations & Original City Zoning (OCZ)

Date - 10/23/2024 3:32 a.m.
Total Number Of OZC Plans - (1)
Plan Description Annexation Ordinance Effective Date OCZ Ordinance
Original Town Of Tucson ORIGINAL 08/07/1877 None

Special Development Requests & Requirements

Date - 10/23/2024 3:32 a.m.
Total Number Of Special Development Permits - (1)
Activity Number Status Apply Date Expired Date Type Description
T22SA00240 Approved 01/17/2022 DDO-22-39 Guido Residence Addition: The applicant is proposing to convert the existing single-family residence into a two-story duplex as well as construct a detached ramada. The applicant is seeking zoning approval necessary to allow the construction with reduced side perimeter yard setbacks. If the DDO is approved, the side perimeter yard setback would be reduced from (15'-8") to (6'), measured from the duplex to the north lot line. Additionally, the side perimeter yard setback would be reduced from (6') to (5'-3") to, measured from the ramada to the north lot line, all as shown on the submitted plans.

Permits

Parcel Number - 117083950
Date - 10/23/2024 3:32 a.m.
Total Number Of Permits - (184)
Permit Permit Status Entered Date Expired Date Unit Type Description
TR-ROW-0123-00229 Complete 01/10/2023 06/07/2023 Right-of-Way (ROW) Air Vacuum Utility Potholing of various utilities with +/-12"x12" holes at 49 locations for the design phase of City of Tucson Road Recovery Proposition 101 Rehabilitation Package 10.
TR-ROW-0123-00229 Complete 01/10/2023 06/07/2023 BLDG 1 Right-of-Way (ROW) Air Vacuum Utility Potholing of various utilities with +/-12"x12" holes at 49 locations for the design phase of City of Tucson Road Recovery Proposition 101 Rehabilitation Package 10.
TR-ROW-0123-00229 Complete 01/10/2023 06/07/2023 BLDG 1 UNIT 1101 Right-of-Way (ROW) Air Vacuum Utility Potholing of various utilities with +/-12"x12" holes at 49 locations for the design phase of City of Tucson Road Recovery Proposition 101 Rehabilitation Package 10.
TR-ROW-0123-00229 Complete 01/10/2023 06/07/2023 BLDG 1 UNIT 1102 Right-of-Way (ROW) Air Vacuum Utility Potholing of various utilities with +/-12"x12" holes at 49 locations for the design phase of City of Tucson Road Recovery Proposition 101 Rehabilitation Package 10.
TR-ROW-0123-00229 Complete 01/10/2023 06/07/2023 BLDG 1 UNIT 1103 Right-of-Way (ROW) Air Vacuum Utility Potholing of various utilities with +/-12"x12" holes at 49 locations for the design phase of City of Tucson Road Recovery Proposition 101 Rehabilitation Package 10.
TR-ROW-0123-00229 Complete 01/10/2023 06/07/2023 BLDG 1 UNIT 1201 Right-of-Way (ROW) Air Vacuum Utility Potholing of various utilities with +/-12"x12" holes at 49 locations for the design phase of City of Tucson Road Recovery Proposition 101 Rehabilitation Package 10.
TR-ROW-0123-00229 Complete 01/10/2023 06/07/2023 BLDG 1 UNIT 1202 Right-of-Way (ROW) Air Vacuum Utility Potholing of various utilities with +/-12"x12" holes at 49 locations for the design phase of City of Tucson Road Recovery Proposition 101 Rehabilitation Package 10.
TR-ROW-0123-00229 Complete 01/10/2023 06/07/2023 BLDG 1 UNIT 1203 Right-of-Way (ROW) Air Vacuum Utility Potholing of various utilities with +/-12"x12" holes at 49 locations for the design phase of City of Tucson Road Recovery Proposition 101 Rehabilitation Package 10.
TR-ROW-0123-00229 Complete 01/10/2023 06/07/2023 BLDG 2 Right-of-Way (ROW) Air Vacuum Utility Potholing of various utilities with +/-12"x12" holes at 49 locations for the design phase of City of Tucson Road Recovery Proposition 101 Rehabilitation Package 10.
TR-ROW-0123-00229 Complete 01/10/2023 06/07/2023 BLDG 2 UNIT 2101 Right-of-Way (ROW) Air Vacuum Utility Potholing of various utilities with +/-12"x12" holes at 49 locations for the design phase of City of Tucson Road Recovery Proposition 101 Rehabilitation Package 10.
TR-ROW-0123-00229 Complete 01/10/2023 06/07/2023 BLDG 2 UNIT 2102 Right-of-Way (ROW) Air Vacuum Utility Potholing of various utilities with +/-12"x12" holes at 49 locations for the design phase of City of Tucson Road Recovery Proposition 101 Rehabilitation Package 10.
TR-ROW-0123-00229 Complete 01/10/2023 06/07/2023 BLDG 2 UNIT 2103 Right-of-Way (ROW) Air Vacuum Utility Potholing of various utilities with +/-12"x12" holes at 49 locations for the design phase of City of Tucson Road Recovery Proposition 101 Rehabilitation Package 10.
TR-ROW-0123-00229 Complete 01/10/2023 06/07/2023 BLDG 2 UNIT 2104 Right-of-Way (ROW) Air Vacuum Utility Potholing of various utilities with +/-12"x12" holes at 49 locations for the design phase of City of Tucson Road Recovery Proposition 101 Rehabilitation Package 10.
TR-ROW-0123-00229 Complete 01/10/2023 06/07/2023 BLDG 2 UNIT 2105 Right-of-Way (ROW) Air Vacuum Utility Potholing of various utilities with +/-12"x12" holes at 49 locations for the design phase of City of Tucson Road Recovery Proposition 101 Rehabilitation Package 10.
TR-ROW-0123-00229 Complete 01/10/2023 06/07/2023 BLDG 2 UNIT 2201 Right-of-Way (ROW) Air Vacuum Utility Potholing of various utilities with +/-12"x12" holes at 49 locations for the design phase of City of Tucson Road Recovery Proposition 101 Rehabilitation Package 10.
TR-ROW-0123-00229 Complete 01/10/2023 06/07/2023 BLDG 2 UNIT 2202 Right-of-Way (ROW) Air Vacuum Utility Potholing of various utilities with +/-12"x12" holes at 49 locations for the design phase of City of Tucson Road Recovery Proposition 101 Rehabilitation Package 10.
TR-ROW-0123-00229 Complete 01/10/2023 06/07/2023 BLDG 2 UNIT 2203 Right-of-Way (ROW) Air Vacuum Utility Potholing of various utilities with +/-12"x12" holes at 49 locations for the design phase of City of Tucson Road Recovery Proposition 101 Rehabilitation Package 10.
TR-ROW-0123-00229 Complete 01/10/2023 06/07/2023 BLDG 2 UNIT 2204 Right-of-Way (ROW) Air Vacuum Utility Potholing of various utilities with +/-12"x12" holes at 49 locations for the design phase of City of Tucson Road Recovery Proposition 101 Rehabilitation Package 10.
TR-ROW-0123-00229 Complete 01/10/2023 06/07/2023 BLDG 2 UNIT 2205 Right-of-Way (ROW) Air Vacuum Utility Potholing of various utilities with +/-12"x12" holes at 49 locations for the design phase of City of Tucson Road Recovery Proposition 101 Rehabilitation Package 10.
TR-ROW-0123-00229 Complete 01/10/2023 06/07/2023 BLDG 2 UNIT 2301 Right-of-Way (ROW) Air Vacuum Utility Potholing of various utilities with +/-12"x12" holes at 49 locations for the design phase of City of Tucson Road Recovery Proposition 101 Rehabilitation Package 10.
TR-ROW-0123-00229 Complete 01/10/2023 06/07/2023 BLDG 2 UNIT 2302 Right-of-Way (ROW) Air Vacuum Utility Potholing of various utilities with +/-12"x12" holes at 49 locations for the design phase of City of Tucson Road Recovery Proposition 101 Rehabilitation Package 10.
TR-ROW-0123-00229 Complete 01/10/2023 06/07/2023 BLDG 2 UNIT 2303 Right-of-Way (ROW) Air Vacuum Utility Potholing of various utilities with +/-12"x12" holes at 49 locations for the design phase of City of Tucson Road Recovery Proposition 101 Rehabilitation Package 10.
TR-ROW-0123-00229 Complete 01/10/2023 06/07/2023 BLDG 2 UNIT 2304 Right-of-Way (ROW) Air Vacuum Utility Potholing of various utilities with +/-12"x12" holes at 49 locations for the design phase of City of Tucson Road Recovery Proposition 101 Rehabilitation Package 10.
TR-ROW-0123-00229 Complete 01/10/2023 06/07/2023 BLDG 2 UNIT 2305 Right-of-Way (ROW) Air Vacuum Utility Potholing of various utilities with +/-12"x12" holes at 49 locations for the design phase of City of Tucson Road Recovery Proposition 101 Rehabilitation Package 10.
TR-ROW-0123-00229 Complete 01/10/2023 06/07/2023 BLDG 3 Right-of-Way (ROW) Air Vacuum Utility Potholing of various utilities with +/-12"x12" holes at 49 locations for the design phase of City of Tucson Road Recovery Proposition 101 Rehabilitation Package 10.
TR-ROW-0123-00229 Complete 01/10/2023 06/07/2023 BLDG 3 UNIT 3101 Right-of-Way (ROW) Air Vacuum Utility Potholing of various utilities with +/-12"x12" holes at 49 locations for the design phase of City of Tucson Road Recovery Proposition 101 Rehabilitation Package 10.
TR-ROW-0123-00229 Complete 01/10/2023 06/07/2023 BLDG 3 UNIT 3102 Right-of-Way (ROW) Air Vacuum Utility Potholing of various utilities with +/-12"x12" holes at 49 locations for the design phase of City of Tucson Road Recovery Proposition 101 Rehabilitation Package 10.
TR-ROW-0123-00229 Complete 01/10/2023 06/07/2023 BLDG 3 UNIT 3103 Right-of-Way (ROW) Air Vacuum Utility Potholing of various utilities with +/-12"x12" holes at 49 locations for the design phase of City of Tucson Road Recovery Proposition 101 Rehabilitation Package 10.
TR-ROW-0123-00229 Complete 01/10/2023 06/07/2023 BLDG 3 UNIT 3104 Right-of-Way (ROW) Air Vacuum Utility Potholing of various utilities with +/-12"x12" holes at 49 locations for the design phase of City of Tucson Road Recovery Proposition 101 Rehabilitation Package 10.
TR-ROW-0123-00229 Complete 01/10/2023 06/07/2023 BLDG 3 UNIT 3105 Right-of-Way (ROW) Air Vacuum Utility Potholing of various utilities with +/-12"x12" holes at 49 locations for the design phase of City of Tucson Road Recovery Proposition 101 Rehabilitation Package 10.
TR-ROW-0123-00229 Complete 01/10/2023 06/07/2023 BLDG 3 UNIT 3106 Right-of-Way (ROW) Air Vacuum Utility Potholing of various utilities with +/-12"x12" holes at 49 locations for the design phase of City of Tucson Road Recovery Proposition 101 Rehabilitation Package 10.
TR-ROW-0123-00229 Complete 01/10/2023 06/07/2023 BLDG 3 UNIT 3107 Right-of-Way (ROW) Air Vacuum Utility Potholing of various utilities with +/-12"x12" holes at 49 locations for the design phase of City of Tucson Road Recovery Proposition 101 Rehabilitation Package 10.
TR-ROW-0123-00229 Complete 01/10/2023 06/07/2023 BLDG 3 UNIT 3108 Right-of-Way (ROW) Air Vacuum Utility Potholing of various utilities with +/-12"x12" holes at 49 locations for the design phase of City of Tucson Road Recovery Proposition 101 Rehabilitation Package 10.
TR-ROW-0123-00229 Complete 01/10/2023 06/07/2023 BLDG 3 UNIT 3109 Right-of-Way (ROW) Air Vacuum Utility Potholing of various utilities with +/-12"x12" holes at 49 locations for the design phase of City of Tucson Road Recovery Proposition 101 Rehabilitation Package 10.
TR-ROW-0123-00229 Complete 01/10/2023 06/07/2023 BLDG 3 UNIT 3110 Right-of-Way (ROW) Air Vacuum Utility Potholing of various utilities with +/-12"x12" holes at 49 locations for the design phase of City of Tucson Road Recovery Proposition 101 Rehabilitation Package 10.
TR-ROW-0123-00229 Complete 01/10/2023 06/07/2023 BLDG 3 UNIT 3111 Right-of-Way (ROW) Air Vacuum Utility Potholing of various utilities with +/-12"x12" holes at 49 locations for the design phase of City of Tucson Road Recovery Proposition 101 Rehabilitation Package 10.
TR-ROW-0123-00229 Complete 01/10/2023 06/07/2023 BLDG 3 UNIT 3112 Right-of-Way (ROW) Air Vacuum Utility Potholing of various utilities with +/-12"x12" holes at 49 locations for the design phase of City of Tucson Road Recovery Proposition 101 Rehabilitation Package 10.
TR-ROW-0123-00229 Complete 01/10/2023 06/07/2023 BLDG 3 UNIT 3113 Right-of-Way (ROW) Air Vacuum Utility Potholing of various utilities with +/-12"x12" holes at 49 locations for the design phase of City of Tucson Road Recovery Proposition 101 Rehabilitation Package 10.
TR-ROW-0123-00229 Complete 01/10/2023 06/07/2023 BLDG 3 UNIT 3114 Right-of-Way (ROW) Air Vacuum Utility Potholing of various utilities with +/-12"x12" holes at 49 locations for the design phase of City of Tucson Road Recovery Proposition 101 Rehabilitation Package 10.
TR-ROW-0123-00229 Complete 01/10/2023 06/07/2023 BLDG 3 UNIT 3115 Right-of-Way (ROW) Air Vacuum Utility Potholing of various utilities with +/-12"x12" holes at 49 locations for the design phase of City of Tucson Road Recovery Proposition 101 Rehabilitation Package 10.
TR-ROW-0123-00229 Complete 01/10/2023 06/07/2023 BLDG 3 UNIT 3116 Right-of-Way (ROW) Air Vacuum Utility Potholing of various utilities with +/-12"x12" holes at 49 locations for the design phase of City of Tucson Road Recovery Proposition 101 Rehabilitation Package 10.
TR-ROW-0123-00229 Complete 01/10/2023 06/07/2023 BLDG 3 UNIT 3117 Right-of-Way (ROW) Air Vacuum Utility Potholing of various utilities with +/-12"x12" holes at 49 locations for the design phase of City of Tucson Road Recovery Proposition 101 Rehabilitation Package 10.
TR-ROW-0123-00229 Complete 01/10/2023 06/07/2023 BLDG 3 UNIT 3118 Right-of-Way (ROW) Air Vacuum Utility Potholing of various utilities with +/-12"x12" holes at 49 locations for the design phase of City of Tucson Road Recovery Proposition 101 Rehabilitation Package 10.
TR-ROW-0123-00229 Complete 01/10/2023 06/07/2023 BLDG 3 UNIT 3119 Right-of-Way (ROW) Air Vacuum Utility Potholing of various utilities with +/-12"x12" holes at 49 locations for the design phase of City of Tucson Road Recovery Proposition 101 Rehabilitation Package 10.
TR-ROW-0123-00229 Complete 01/10/2023 06/07/2023 BLDG 3 UNIT 3120 Right-of-Way (ROW) Air Vacuum Utility Potholing of various utilities with +/-12"x12" holes at 49 locations for the design phase of City of Tucson Road Recovery Proposition 101 Rehabilitation Package 10.
TR-ROW-0123-00229 Complete 01/10/2023 06/07/2023 BLDG 3 UNIT 3121 Right-of-Way (ROW) Air Vacuum Utility Potholing of various utilities with +/-12"x12" holes at 49 locations for the design phase of City of Tucson Road Recovery Proposition 101 Rehabilitation Package 10.
TR-ROW-0123-00229 Complete 01/10/2023 06/07/2023 BLDG 3 UNIT 3122 Right-of-Way (ROW) Air Vacuum Utility Potholing of various utilities with +/-12"x12" holes at 49 locations for the design phase of City of Tucson Road Recovery Proposition 101 Rehabilitation Package 10.
TR-ROW-0123-00229 Complete 01/10/2023 06/07/2023 BLDG 3 UNIT 3123 Right-of-Way (ROW) Air Vacuum Utility Potholing of various utilities with +/-12"x12" holes at 49 locations for the design phase of City of Tucson Road Recovery Proposition 101 Rehabilitation Package 10.
TR-ROW-0123-00229 Complete 01/10/2023 06/07/2023 BLDG 3 UNIT 3125 Right-of-Way (ROW) Air Vacuum Utility Potholing of various utilities with +/-12"x12" holes at 49 locations for the design phase of City of Tucson Road Recovery Proposition 101 Rehabilitation Package 10.
TR-ROW-0123-00229 Complete 01/10/2023 06/07/2023 BLDG 3 UNIT 3126 Right-of-Way (ROW) Air Vacuum Utility Potholing of various utilities with +/-12"x12" holes at 49 locations for the design phase of City of Tucson Road Recovery Proposition 101 Rehabilitation Package 10.
TR-ROW-0123-00229 Complete 01/10/2023 06/07/2023 BLDG 3 UNIT 3127 Right-of-Way (ROW) Air Vacuum Utility Potholing of various utilities with +/-12"x12" holes at 49 locations for the design phase of City of Tucson Road Recovery Proposition 101 Rehabilitation Package 10.
TR-ROW-0123-00229 Complete 01/10/2023 06/07/2023 BLDG 3 UNIT 3128 Right-of-Way (ROW) Air Vacuum Utility Potholing of various utilities with +/-12"x12" holes at 49 locations for the design phase of City of Tucson Road Recovery Proposition 101 Rehabilitation Package 10.
TR-ROW-0123-00229 Complete 01/10/2023 06/07/2023 BLDG 3 UNIT 3129 Right-of-Way (ROW) Air Vacuum Utility Potholing of various utilities with +/-12"x12" holes at 49 locations for the design phase of City of Tucson Road Recovery Proposition 101 Rehabilitation Package 10.
TR-ROW-0123-00229 Complete 01/10/2023 06/07/2023 BLDG 3 UNIT 3130 Right-of-Way (ROW) Air Vacuum Utility Potholing of various utilities with +/-12"x12" holes at 49 locations for the design phase of City of Tucson Road Recovery Proposition 101 Rehabilitation Package 10.
TR-ROW-0123-00229 Complete 01/10/2023 06/07/2023 BLDG 3 UNIT 3131 Right-of-Way (ROW) Air Vacuum Utility Potholing of various utilities with +/-12"x12" holes at 49 locations for the design phase of City of Tucson Road Recovery Proposition 101 Rehabilitation Package 10.
TR-ROW-0123-00229 Complete 01/10/2023 06/07/2023 BLDG 3 UNIT 3201 Right-of-Way (ROW) Air Vacuum Utility Potholing of various utilities with +/-12"x12" holes at 49 locations for the design phase of City of Tucson Road Recovery Proposition 101 Rehabilitation Package 10.
TR-ROW-0123-00229 Complete 01/10/2023 06/07/2023 BLDG 3 UNIT 3202 Right-of-Way (ROW) Air Vacuum Utility Potholing of various utilities with +/-12"x12" holes at 49 locations for the design phase of City of Tucson Road Recovery Proposition 101 Rehabilitation Package 10.
TR-ROW-0123-00229 Complete 01/10/2023 06/07/2023 BLDG 3 UNIT 3203 Right-of-Way (ROW) Air Vacuum Utility Potholing of various utilities with +/-12"x12" holes at 49 locations for the design phase of City of Tucson Road Recovery Proposition 101 Rehabilitation Package 10.
TR-ROW-0123-00229 Complete 01/10/2023 06/07/2023 BLDG 3 UNIT 3204 Right-of-Way (ROW) Air Vacuum Utility Potholing of various utilities with +/-12"x12" holes at 49 locations for the design phase of City of Tucson Road Recovery Proposition 101 Rehabilitation Package 10.
TR-ROW-0123-00229 Complete 01/10/2023 06/07/2023 BLDG 3 UNIT 3205 Right-of-Way (ROW) Air Vacuum Utility Potholing of various utilities with +/-12"x12" holes at 49 locations for the design phase of City of Tucson Road Recovery Proposition 101 Rehabilitation Package 10.
TR-ROW-0123-00229 Complete 01/10/2023 06/07/2023 BLDG 3 UNIT 3206 Right-of-Way (ROW) Air Vacuum Utility Potholing of various utilities with +/-12"x12" holes at 49 locations for the design phase of City of Tucson Road Recovery Proposition 101 Rehabilitation Package 10.
TR-ROW-0123-00229 Complete 01/10/2023 06/07/2023 BLDG 3 UNIT 3207 Right-of-Way (ROW) Air Vacuum Utility Potholing of various utilities with +/-12"x12" holes at 49 locations for the design phase of City of Tucson Road Recovery Proposition 101 Rehabilitation Package 10.
TR-ROW-0123-00229 Complete 01/10/2023 06/07/2023 BLDG 3 UNIT 3208 Right-of-Way (ROW) Air Vacuum Utility Potholing of various utilities with +/-12"x12" holes at 49 locations for the design phase of City of Tucson Road Recovery Proposition 101 Rehabilitation Package 10.
TR-ROW-0123-00229 Complete 01/10/2023 06/07/2023 BLDG 3 UNIT 3209 Right-of-Way (ROW) Air Vacuum Utility Potholing of various utilities with +/-12"x12" holes at 49 locations for the design phase of City of Tucson Road Recovery Proposition 101 Rehabilitation Package 10.
TR-ROW-0123-00229 Complete 01/10/2023 06/07/2023 BLDG 3 UNIT 3210 Right-of-Way (ROW) Air Vacuum Utility Potholing of various utilities with +/-12"x12" holes at 49 locations for the design phase of City of Tucson Road Recovery Proposition 101 Rehabilitation Package 10.
TR-ROW-0123-00229 Complete 01/10/2023 06/07/2023 BLDG 3 UNIT 3211 Right-of-Way (ROW) Air Vacuum Utility Potholing of various utilities with +/-12"x12" holes at 49 locations for the design phase of City of Tucson Road Recovery Proposition 101 Rehabilitation Package 10.
TR-ROW-0123-00229 Complete 01/10/2023 06/07/2023 BLDG 3 UNIT 3212 Right-of-Way (ROW) Air Vacuum Utility Potholing of various utilities with +/-12"x12" holes at 49 locations for the design phase of City of Tucson Road Recovery Proposition 101 Rehabilitation Package 10.
TR-ROW-0123-00229 Complete 01/10/2023 06/07/2023 BLDG 3 UNIT 3213 Right-of-Way (ROW) Air Vacuum Utility Potholing of various utilities with +/-12"x12" holes at 49 locations for the design phase of City of Tucson Road Recovery Proposition 101 Rehabilitation Package 10.
TR-ROW-0123-00229 Complete 01/10/2023 06/07/2023 BLDG 3 UNIT 3214 Right-of-Way (ROW) Air Vacuum Utility Potholing of various utilities with +/-12"x12" holes at 49 locations for the design phase of City of Tucson Road Recovery Proposition 101 Rehabilitation Package 10.
TR-ROW-0123-00229 Complete 01/10/2023 06/07/2023 BLDG 3 UNIT 3215 Right-of-Way (ROW) Air Vacuum Utility Potholing of various utilities with +/-12"x12" holes at 49 locations for the design phase of City of Tucson Road Recovery Proposition 101 Rehabilitation Package 10.
TR-ROW-0123-00229 Complete 01/10/2023 06/07/2023 BLDG 3 UNIT 3216 Right-of-Way (ROW) Air Vacuum Utility Potholing of various utilities with +/-12"x12" holes at 49 locations for the design phase of City of Tucson Road Recovery Proposition 101 Rehabilitation Package 10.
TR-ROW-0123-00229 Complete 01/10/2023 06/07/2023 BLDG 3 UNIT 3217 Right-of-Way (ROW) Air Vacuum Utility Potholing of various utilities with +/-12"x12" holes at 49 locations for the design phase of City of Tucson Road Recovery Proposition 101 Rehabilitation Package 10.
TR-ROW-0123-00229 Complete 01/10/2023 06/07/2023 BLDG 3 UNIT 3218 Right-of-Way (ROW) Air Vacuum Utility Potholing of various utilities with +/-12"x12" holes at 49 locations for the design phase of City of Tucson Road Recovery Proposition 101 Rehabilitation Package 10.
TR-ROW-0123-00229 Complete 01/10/2023 06/07/2023 BLDG 3 UNIT 3219 Right-of-Way (ROW) Air Vacuum Utility Potholing of various utilities with +/-12"x12" holes at 49 locations for the design phase of City of Tucson Road Recovery Proposition 101 Rehabilitation Package 10.
TR-ROW-0123-00229 Complete 01/10/2023 06/07/2023 BLDG 3 UNIT 3220 Right-of-Way (ROW) Air Vacuum Utility Potholing of various utilities with +/-12"x12" holes at 49 locations for the design phase of City of Tucson Road Recovery Proposition 101 Rehabilitation Package 10.
TR-ROW-0123-00229 Complete 01/10/2023 06/07/2023 BLDG 3 UNIT 3221 Right-of-Way (ROW) Air Vacuum Utility Potholing of various utilities with +/-12"x12" holes at 49 locations for the design phase of City of Tucson Road Recovery Proposition 101 Rehabilitation Package 10.
TR-ROW-0123-00229 Complete 01/10/2023 06/07/2023 BLDG 3 UNIT 3222 Right-of-Way (ROW) Air Vacuum Utility Potholing of various utilities with +/-12"x12" holes at 49 locations for the design phase of City of Tucson Road Recovery Proposition 101 Rehabilitation Package 10.
TR-ROW-0123-00229 Complete 01/10/2023 06/07/2023 BLDG 3 UNIT 3223 Right-of-Way (ROW) Air Vacuum Utility Potholing of various utilities with +/-12"x12" holes at 49 locations for the design phase of City of Tucson Road Recovery Proposition 101 Rehabilitation Package 10.
TR-ROW-0123-00229 Complete 01/10/2023 06/07/2023 BLDG 3 UNIT 3224 Right-of-Way (ROW) Air Vacuum Utility Potholing of various utilities with +/-12"x12" holes at 49 locations for the design phase of City of Tucson Road Recovery Proposition 101 Rehabilitation Package 10.
TR-ROW-0123-00229 Complete 01/10/2023 06/07/2023 BLDG 3 UNIT 3225 Right-of-Way (ROW) Air Vacuum Utility Potholing of various utilities with +/-12"x12" holes at 49 locations for the design phase of City of Tucson Road Recovery Proposition 101 Rehabilitation Package 10.
TR-ROW-0123-00229 Complete 01/10/2023 06/07/2023 BLDG 3 UNIT 3226 Right-of-Way (ROW) Air Vacuum Utility Potholing of various utilities with +/-12"x12" holes at 49 locations for the design phase of City of Tucson Road Recovery Proposition 101 Rehabilitation Package 10.
TR-ROW-0123-00229 Complete 01/10/2023 06/07/2023 BLDG 3 UNIT 3227 Right-of-Way (ROW) Air Vacuum Utility Potholing of various utilities with +/-12"x12" holes at 49 locations for the design phase of City of Tucson Road Recovery Proposition 101 Rehabilitation Package 10.
TR-ROW-0123-00229 Complete 01/10/2023 06/07/2023 BLDG 3 UNIT 3228 Right-of-Way (ROW) Air Vacuum Utility Potholing of various utilities with +/-12"x12" holes at 49 locations for the design phase of City of Tucson Road Recovery Proposition 101 Rehabilitation Package 10.
TR-ROW-0123-00229 Complete 01/10/2023 06/07/2023 BLDG 3 UNIT 3229 Right-of-Way (ROW) Air Vacuum Utility Potholing of various utilities with +/-12"x12" holes at 49 locations for the design phase of City of Tucson Road Recovery Proposition 101 Rehabilitation Package 10.
TR-ROW-0123-00229 Complete 01/10/2023 06/07/2023 BLDG 3 UNIT 3230 Right-of-Way (ROW) Air Vacuum Utility Potholing of various utilities with +/-12"x12" holes at 49 locations for the design phase of City of Tucson Road Recovery Proposition 101 Rehabilitation Package 10.
TR-ROW-0123-00229 Complete 01/10/2023 06/07/2023 BLDG 3 UNIT 3231 Right-of-Way (ROW) Air Vacuum Utility Potholing of various utilities with +/-12"x12" holes at 49 locations for the design phase of City of Tucson Road Recovery Proposition 101 Rehabilitation Package 10.
TR-ROW-0123-00229 Complete 01/10/2023 06/07/2023 BLDG 3 UNIT 3301 Right-of-Way (ROW) Air Vacuum Utility Potholing of various utilities with +/-12"x12" holes at 49 locations for the design phase of City of Tucson Road Recovery Proposition 101 Rehabilitation Package 10.
TR-ROW-0123-00229 Complete 01/10/2023 06/07/2023 BLDG 3 UNIT 3302 Right-of-Way (ROW) Air Vacuum Utility Potholing of various utilities with +/-12"x12" holes at 49 locations for the design phase of City of Tucson Road Recovery Proposition 101 Rehabilitation Package 10.
TR-ROW-0123-00229 Complete 01/10/2023 06/07/2023 BLDG 3 UNIT 3303 Right-of-Way (ROW) Air Vacuum Utility Potholing of various utilities with +/-12"x12" holes at 49 locations for the design phase of City of Tucson Road Recovery Proposition 101 Rehabilitation Package 10.
TR-ROW-0123-00229 Complete 01/10/2023 06/07/2023 BLDG 3 UNIT 3304 Right-of-Way (ROW) Air Vacuum Utility Potholing of various utilities with +/-12"x12" holes at 49 locations for the design phase of City of Tucson Road Recovery Proposition 101 Rehabilitation Package 10.
TR-ROW-0123-00229 Complete 01/10/2023 06/07/2023 BLDG 3 UNIT 3305 Right-of-Way (ROW) Air Vacuum Utility Potholing of various utilities with +/-12"x12" holes at 49 locations for the design phase of City of Tucson Road Recovery Proposition 101 Rehabilitation Package 10.
TR-ROW-0123-00229 Complete 01/10/2023 06/07/2023 BLDG 3 UNIT 3306 Right-of-Way (ROW) Air Vacuum Utility Potholing of various utilities with +/-12"x12" holes at 49 locations for the design phase of City of Tucson Road Recovery Proposition 101 Rehabilitation Package 10.
TR-ROW-0123-00229 Complete 01/10/2023 06/07/2023 BLDG 3 UNIT 3307 Right-of-Way (ROW) Air Vacuum Utility Potholing of various utilities with +/-12"x12" holes at 49 locations for the design phase of City of Tucson Road Recovery Proposition 101 Rehabilitation Package 10.
TR-ROW-0123-00229 Complete 01/10/2023 06/07/2023 BLDG 3 UNIT 3308 Right-of-Way (ROW) Air Vacuum Utility Potholing of various utilities with +/-12"x12" holes at 49 locations for the design phase of City of Tucson Road Recovery Proposition 101 Rehabilitation Package 10.
TR-ROW-0123-00229 Complete 01/10/2023 06/07/2023 BLDG 3 UNIT 3309 Right-of-Way (ROW) Air Vacuum Utility Potholing of various utilities with +/-12"x12" holes at 49 locations for the design phase of City of Tucson Road Recovery Proposition 101 Rehabilitation Package 10.
TR-ROW-0123-00229 Complete 01/10/2023 06/07/2023 BLDG 3 UNIT 3310 Right-of-Way (ROW) Air Vacuum Utility Potholing of various utilities with +/-12"x12" holes at 49 locations for the design phase of City of Tucson Road Recovery Proposition 101 Rehabilitation Package 10.
TR-ROW-0123-00229 Complete 01/10/2023 06/07/2023 BLDG 3 UNIT 3311 Right-of-Way (ROW) Air Vacuum Utility Potholing of various utilities with +/-12"x12" holes at 49 locations for the design phase of City of Tucson Road Recovery Proposition 101 Rehabilitation Package 10.
TR-ROW-0123-00229 Complete 01/10/2023 06/07/2023 BLDG 3 UNIT 3312 Right-of-Way (ROW) Air Vacuum Utility Potholing of various utilities with +/-12"x12" holes at 49 locations for the design phase of City of Tucson Road Recovery Proposition 101 Rehabilitation Package 10.
TR-ROW-0123-00229 Complete 01/10/2023 06/07/2023 BLDG 3 UNIT 3313 Right-of-Way (ROW) Air Vacuum Utility Potholing of various utilities with +/-12"x12" holes at 49 locations for the design phase of City of Tucson Road Recovery Proposition 101 Rehabilitation Package 10.
TR-ROW-0123-00229 Complete 01/10/2023 06/07/2023 BLDG 3 UNIT 3314 Right-of-Way (ROW) Air Vacuum Utility Potholing of various utilities with +/-12"x12" holes at 49 locations for the design phase of City of Tucson Road Recovery Proposition 101 Rehabilitation Package 10.
TR-ROW-0123-00229 Complete 01/10/2023 06/07/2023 BLDG 3 UNIT 3315 Right-of-Way (ROW) Air Vacuum Utility Potholing of various utilities with +/-12"x12" holes at 49 locations for the design phase of City of Tucson Road Recovery Proposition 101 Rehabilitation Package 10.
TR-ROW-0123-00229 Complete 01/10/2023 06/07/2023 BLDG 3 UNIT 3316 Right-of-Way (ROW) Air Vacuum Utility Potholing of various utilities with +/-12"x12" holes at 49 locations for the design phase of City of Tucson Road Recovery Proposition 101 Rehabilitation Package 10.
TR-ROW-0123-00229 Complete 01/10/2023 06/07/2023 BLDG 3 UNIT 3317 Right-of-Way (ROW) Air Vacuum Utility Potholing of various utilities with +/-12"x12" holes at 49 locations for the design phase of City of Tucson Road Recovery Proposition 101 Rehabilitation Package 10.
TR-ROW-0123-00229 Complete 01/10/2023 06/07/2023 BLDG 3 UNIT 3318 Right-of-Way (ROW) Air Vacuum Utility Potholing of various utilities with +/-12"x12" holes at 49 locations for the design phase of City of Tucson Road Recovery Proposition 101 Rehabilitation Package 10.
TR-ROW-0123-00229 Complete 01/10/2023 06/07/2023 BLDG 3 UNIT 3319 Right-of-Way (ROW) Air Vacuum Utility Potholing of various utilities with +/-12"x12" holes at 49 locations for the design phase of City of Tucson Road Recovery Proposition 101 Rehabilitation Package 10.
TR-ROW-0123-00229 Complete 01/10/2023 06/07/2023 BLDG 3 UNIT 3320 Right-of-Way (ROW) Air Vacuum Utility Potholing of various utilities with +/-12"x12" holes at 49 locations for the design phase of City of Tucson Road Recovery Proposition 101 Rehabilitation Package 10.
TR-ROW-0123-00229 Complete 01/10/2023 06/07/2023 BLDG 3 UNIT 3321 Right-of-Way (ROW) Air Vacuum Utility Potholing of various utilities with +/-12"x12" holes at 49 locations for the design phase of City of Tucson Road Recovery Proposition 101 Rehabilitation Package 10.
TR-ROW-0123-00229 Complete 01/10/2023 06/07/2023 BLDG 3 UNIT 3322 Right-of-Way (ROW) Air Vacuum Utility Potholing of various utilities with +/-12"x12" holes at 49 locations for the design phase of City of Tucson Road Recovery Proposition 101 Rehabilitation Package 10.
TR-ROW-0123-00229 Complete 01/10/2023 06/07/2023 BLDG 3 UNIT 3323 Right-of-Way (ROW) Air Vacuum Utility Potholing of various utilities with +/-12"x12" holes at 49 locations for the design phase of City of Tucson Road Recovery Proposition 101 Rehabilitation Package 10.
TR-ROW-0123-00229 Complete 01/10/2023 06/07/2023 BLDG 3 UNIT 3324 Right-of-Way (ROW) Air Vacuum Utility Potholing of various utilities with +/-12"x12" holes at 49 locations for the design phase of City of Tucson Road Recovery Proposition 101 Rehabilitation Package 10.
TR-ROW-0123-00229 Complete 01/10/2023 06/07/2023 BLDG 3 UNIT 3325 Right-of-Way (ROW) Air Vacuum Utility Potholing of various utilities with +/-12"x12" holes at 49 locations for the design phase of City of Tucson Road Recovery Proposition 101 Rehabilitation Package 10.
TR-ROW-0123-00229 Complete 01/10/2023 06/07/2023 BLDG 3 UNIT 3326 Right-of-Way (ROW) Air Vacuum Utility Potholing of various utilities with +/-12"x12" holes at 49 locations for the design phase of City of Tucson Road Recovery Proposition 101 Rehabilitation Package 10.
TR-ROW-0123-00229 Complete 01/10/2023 06/07/2023 BLDG 3 UNIT 3327 Right-of-Way (ROW) Air Vacuum Utility Potholing of various utilities with +/-12"x12" holes at 49 locations for the design phase of City of Tucson Road Recovery Proposition 101 Rehabilitation Package 10.
TR-ROW-0123-00229 Complete 01/10/2023 06/07/2023 BLDG 3 UNIT 3328 Right-of-Way (ROW) Air Vacuum Utility Potholing of various utilities with +/-12"x12" holes at 49 locations for the design phase of City of Tucson Road Recovery Proposition 101 Rehabilitation Package 10.
TR-ROW-0123-00229 Complete 01/10/2023 06/07/2023 BLDG 3 UNIT 3329 Right-of-Way (ROW) Air Vacuum Utility Potholing of various utilities with +/-12"x12" holes at 49 locations for the design phase of City of Tucson Road Recovery Proposition 101 Rehabilitation Package 10.
TR-ROW-0123-00229 Complete 01/10/2023 06/07/2023 BLDG 3 UNIT 3330 Right-of-Way (ROW) Air Vacuum Utility Potholing of various utilities with +/-12"x12" holes at 49 locations for the design phase of City of Tucson Road Recovery Proposition 101 Rehabilitation Package 10.
TR-ROW-0123-00229 Complete 01/10/2023 06/07/2023 BLDG 3 UNIT 3331 Right-of-Way (ROW) Air Vacuum Utility Potholing of various utilities with +/-12"x12" holes at 49 locations for the design phase of City of Tucson Road Recovery Proposition 101 Rehabilitation Package 10.
TR-ROW-0123-00229 Complete 01/10/2023 06/07/2023 BLDG 3 UNIT 3402 Right-of-Way (ROW) Air Vacuum Utility Potholing of various utilities with +/-12"x12" holes at 49 locations for the design phase of City of Tucson Road Recovery Proposition 101 Rehabilitation Package 10.
TR-ROW-0123-00229 Complete 01/10/2023 06/07/2023 BLDG 3 UNIT 3403 Right-of-Way (ROW) Air Vacuum Utility Potholing of various utilities with +/-12"x12" holes at 49 locations for the design phase of City of Tucson Road Recovery Proposition 101 Rehabilitation Package 10.
TR-ROW-0123-00229 Complete 01/10/2023 06/07/2023 BLDG 3 UNIT 3404 Right-of-Way (ROW) Air Vacuum Utility Potholing of various utilities with +/-12"x12" holes at 49 locations for the design phase of City of Tucson Road Recovery Proposition 101 Rehabilitation Package 10.
TR-ROW-0123-00229 Complete 01/10/2023 06/07/2023 BLDG 3 UNIT 3405 Right-of-Way (ROW) Air Vacuum Utility Potholing of various utilities with +/-12"x12" holes at 49 locations for the design phase of City of Tucson Road Recovery Proposition 101 Rehabilitation Package 10.
TR-ROW-0123-00229 Complete 01/10/2023 06/07/2023 BLDG 3 UNIT 3406 Right-of-Way (ROW) Air Vacuum Utility Potholing of various utilities with +/-12"x12" holes at 49 locations for the design phase of City of Tucson Road Recovery Proposition 101 Rehabilitation Package 10.
TR-ROW-0123-00229 Complete 01/10/2023 06/07/2023 BLDG 3 UNIT 3407 Right-of-Way (ROW) Air Vacuum Utility Potholing of various utilities with +/-12"x12" holes at 49 locations for the design phase of City of Tucson Road Recovery Proposition 101 Rehabilitation Package 10.
TR-ROW-0123-00229 Complete 01/10/2023 06/07/2023 BLDG 3 UNIT 3408 Right-of-Way (ROW) Air Vacuum Utility Potholing of various utilities with +/-12"x12" holes at 49 locations for the design phase of City of Tucson Road Recovery Proposition 101 Rehabilitation Package 10.
TR-ROW-0123-00229 Complete 01/10/2023 06/07/2023 BLDG 3 UNIT 3409 Right-of-Way (ROW) Air Vacuum Utility Potholing of various utilities with +/-12"x12" holes at 49 locations for the design phase of City of Tucson Road Recovery Proposition 101 Rehabilitation Package 10.
TR-ROW-0123-00229 Complete 01/10/2023 06/07/2023 BLDG 3 UNIT 3410 Right-of-Way (ROW) Air Vacuum Utility Potholing of various utilities with +/-12"x12" holes at 49 locations for the design phase of City of Tucson Road Recovery Proposition 101 Rehabilitation Package 10.
TR-ROW-0123-00229 Complete 01/10/2023 06/07/2023 BLDG 3 UNIT 3411 Right-of-Way (ROW) Air Vacuum Utility Potholing of various utilities with +/-12"x12" holes at 49 locations for the design phase of City of Tucson Road Recovery Proposition 101 Rehabilitation Package 10.
TR-ROW-0123-00229 Complete 01/10/2023 06/07/2023 BLDG 3 UNIT 3412 Right-of-Way (ROW) Air Vacuum Utility Potholing of various utilities with +/-12"x12" holes at 49 locations for the design phase of City of Tucson Road Recovery Proposition 101 Rehabilitation Package 10.
TR-ROW-0123-00229 Complete 01/10/2023 06/07/2023 BLDG 3 UNIT 3413 Right-of-Way (ROW) Air Vacuum Utility Potholing of various utilities with +/-12"x12" holes at 49 locations for the design phase of City of Tucson Road Recovery Proposition 101 Rehabilitation Package 10.
TR-ROW-0123-00229 Complete 01/10/2023 06/07/2023 BLDG 3 UNIT 3414 Right-of-Way (ROW) Air Vacuum Utility Potholing of various utilities with +/-12"x12" holes at 49 locations for the design phase of City of Tucson Road Recovery Proposition 101 Rehabilitation Package 10.
TR-ROW-0123-00229 Complete 01/10/2023 06/07/2023 BLDG 3 UNIT 3415 Right-of-Way (ROW) Air Vacuum Utility Potholing of various utilities with +/-12"x12" holes at 49 locations for the design phase of City of Tucson Road Recovery Proposition 101 Rehabilitation Package 10.
TR-ROW-0123-00229 Complete 01/10/2023 06/07/2023 BLDG 3 UNIT 3416 Right-of-Way (ROW) Air Vacuum Utility Potholing of various utilities with +/-12"x12" holes at 49 locations for the design phase of City of Tucson Road Recovery Proposition 101 Rehabilitation Package 10.
TR-ROW-0123-00229 Complete 01/10/2023 06/07/2023 BLDG 3 UNIT 3417 Right-of-Way (ROW) Air Vacuum Utility Potholing of various utilities with +/-12"x12" holes at 49 locations for the design phase of City of Tucson Road Recovery Proposition 101 Rehabilitation Package 10.
TR-ROW-0123-00229 Complete 01/10/2023 06/07/2023 BLDG 3 UNIT 3418 Right-of-Way (ROW) Air Vacuum Utility Potholing of various utilities with +/-12"x12" holes at 49 locations for the design phase of City of Tucson Road Recovery Proposition 101 Rehabilitation Package 10.
TR-ROW-0123-00229 Complete 01/10/2023 06/07/2023 BLDG 3 UNIT 3419 Right-of-Way (ROW) Air Vacuum Utility Potholing of various utilities with +/-12"x12" holes at 49 locations for the design phase of City of Tucson Road Recovery Proposition 101 Rehabilitation Package 10.
TR-ROW-0123-00229 Complete 01/10/2023 06/07/2023 BLDG 3 UNIT 3420 Right-of-Way (ROW) Air Vacuum Utility Potholing of various utilities with +/-12"x12" holes at 49 locations for the design phase of City of Tucson Road Recovery Proposition 101 Rehabilitation Package 10.
TR-ROW-0123-00229 Complete 01/10/2023 06/07/2023 BLDG 3 UNIT 3421 Right-of-Way (ROW) Air Vacuum Utility Potholing of various utilities with +/-12"x12" holes at 49 locations for the design phase of City of Tucson Road Recovery Proposition 101 Rehabilitation Package 10.
TR-ROW-0123-00229 Complete 01/10/2023 06/07/2023 BLDG 3 UNIT 3422 Right-of-Way (ROW) Air Vacuum Utility Potholing of various utilities with +/-12"x12" holes at 49 locations for the design phase of City of Tucson Road Recovery Proposition 101 Rehabilitation Package 10.
TR-ROW-0123-00229 Complete 01/10/2023 06/07/2023 BLDG 3 UNIT 3423 Right-of-Way (ROW) Air Vacuum Utility Potholing of various utilities with +/-12"x12" holes at 49 locations for the design phase of City of Tucson Road Recovery Proposition 101 Rehabilitation Package 10.
TR-ROW-0123-00229 Complete 01/10/2023 06/07/2023 BLDG 3 UNIT 3424 Right-of-Way (ROW) Air Vacuum Utility Potholing of various utilities with +/-12"x12" holes at 49 locations for the design phase of City of Tucson Road Recovery Proposition 101 Rehabilitation Package 10.
TR-ROW-0123-00229 Complete 01/10/2023 06/07/2023 BLDG 3 UNIT 3425 Right-of-Way (ROW) Air Vacuum Utility Potholing of various utilities with +/-12"x12" holes at 49 locations for the design phase of City of Tucson Road Recovery Proposition 101 Rehabilitation Package 10.
TR-ROW-0123-00229 Complete 01/10/2023 06/07/2023 BLDG 3 UNIT 3426 Right-of-Way (ROW) Air Vacuum Utility Potholing of various utilities with +/-12"x12" holes at 49 locations for the design phase of City of Tucson Road Recovery Proposition 101 Rehabilitation Package 10.
TR-ROW-0123-00229 Complete 01/10/2023 06/07/2023 BLDG 3 UNIT 3427 Right-of-Way (ROW) Air Vacuum Utility Potholing of various utilities with +/-12"x12" holes at 49 locations for the design phase of City of Tucson Road Recovery Proposition 101 Rehabilitation Package 10.
TR-ROW-0123-00229 Complete 01/10/2023 06/07/2023 BLDG 4 Right-of-Way (ROW) Air Vacuum Utility Potholing of various utilities with +/-12"x12" holes at 49 locations for the design phase of City of Tucson Road Recovery Proposition 101 Rehabilitation Package 10.
TR-ROW-0123-00229 Complete 01/10/2023 06/07/2023 BLDG 4 UNIT 4101 Right-of-Way (ROW) Air Vacuum Utility Potholing of various utilities with +/-12"x12" holes at 49 locations for the design phase of City of Tucson Road Recovery Proposition 101 Rehabilitation Package 10.
TR-ROW-0123-00229 Complete 01/10/2023 06/07/2023 BLDG 4 UNIT 4102 Right-of-Way (ROW) Air Vacuum Utility Potholing of various utilities with +/-12"x12" holes at 49 locations for the design phase of City of Tucson Road Recovery Proposition 101 Rehabilitation Package 10.
TR-ROW-0123-00229 Complete 01/10/2023 06/07/2023 BLDG 4 UNIT 4201 Right-of-Way (ROW) Air Vacuum Utility Potholing of various utilities with +/-12"x12" holes at 49 locations for the design phase of City of Tucson Road Recovery Proposition 101 Rehabilitation Package 10.
TR-ROW-0123-00229 Complete 01/10/2023 06/07/2023 BLDG 4 UNIT 4202 Right-of-Way (ROW) Air Vacuum Utility Potholing of various utilities with +/-12"x12" holes at 49 locations for the design phase of City of Tucson Road Recovery Proposition 101 Rehabilitation Package 10.
TR-ROW-0123-00229 Complete 01/10/2023 06/07/2023 BLDG 4 UNIT 4301 Right-of-Way (ROW) Air Vacuum Utility Potholing of various utilities with +/-12"x12" holes at 49 locations for the design phase of City of Tucson Road Recovery Proposition 101 Rehabilitation Package 10.
TR-ROW-0123-00229 Complete 01/10/2023 06/07/2023 BLDG 4 UNIT 4302 Right-of-Way (ROW) Air Vacuum Utility Potholing of various utilities with +/-12"x12" holes at 49 locations for the design phase of City of Tucson Road Recovery Proposition 101 Rehabilitation Package 10.
TR-ROW-0123-00229 Complete 01/10/2023 06/07/2023 BLDG 5 Right-of-Way (ROW) Air Vacuum Utility Potholing of various utilities with +/-12"x12" holes at 49 locations for the design phase of City of Tucson Road Recovery Proposition 101 Rehabilitation Package 10.
TR-ROW-0123-00229 Complete 01/10/2023 06/07/2023 BLDG 5 UNIT 5101 Right-of-Way (ROW) Air Vacuum Utility Potholing of various utilities with +/-12"x12" holes at 49 locations for the design phase of City of Tucson Road Recovery Proposition 101 Rehabilitation Package 10.
TR-ROW-0123-00229 Complete 01/10/2023 06/07/2023 BLDG 5 UNIT 5102 Right-of-Way (ROW) Air Vacuum Utility Potholing of various utilities with +/-12"x12" holes at 49 locations for the design phase of City of Tucson Road Recovery Proposition 101 Rehabilitation Package 10.
TR-ROW-0123-00229 Complete 01/10/2023 06/07/2023 BLDG 5 UNIT 5103 Right-of-Way (ROW) Air Vacuum Utility Potholing of various utilities with +/-12"x12" holes at 49 locations for the design phase of City of Tucson Road Recovery Proposition 101 Rehabilitation Package 10.
TR-ROW-0123-00229 Complete 01/10/2023 06/07/2023 BLDG 5 UNIT 5104 Right-of-Way (ROW) Air Vacuum Utility Potholing of various utilities with +/-12"x12" holes at 49 locations for the design phase of City of Tucson Road Recovery Proposition 101 Rehabilitation Package 10.
TR-ROW-0123-00229 Complete 01/10/2023 06/07/2023 BLDG 5 UNIT 5105 Right-of-Way (ROW) Air Vacuum Utility Potholing of various utilities with +/-12"x12" holes at 49 locations for the design phase of City of Tucson Road Recovery Proposition 101 Rehabilitation Package 10.
TR-ROW-0123-00229 Complete 01/10/2023 06/07/2023 BLDG 5 UNIT 5106 Right-of-Way (ROW) Air Vacuum Utility Potholing of various utilities with +/-12"x12" holes at 49 locations for the design phase of City of Tucson Road Recovery Proposition 101 Rehabilitation Package 10.
TR-ROW-0123-00229 Complete 01/10/2023 06/07/2023 BLDG 5 UNIT 5107 Right-of-Way (ROW) Air Vacuum Utility Potholing of various utilities with +/-12"x12" holes at 49 locations for the design phase of City of Tucson Road Recovery Proposition 101 Rehabilitation Package 10.
TR-ROW-0123-00229 Complete 01/10/2023 06/07/2023 BLDG 5 UNIT 5108 Right-of-Way (ROW) Air Vacuum Utility Potholing of various utilities with +/-12"x12" holes at 49 locations for the design phase of City of Tucson Road Recovery Proposition 101 Rehabilitation Package 10.
TR-ROW-0123-00229 Complete 01/10/2023 06/07/2023 BLDG 5 UNIT 5109 Right-of-Way (ROW) Air Vacuum Utility Potholing of various utilities with +/-12"x12" holes at 49 locations for the design phase of City of Tucson Road Recovery Proposition 101 Rehabilitation Package 10.
TR-ROW-0123-00229 Complete 01/10/2023 06/07/2023 BLDG 5 UNIT 5110 Right-of-Way (ROW) Air Vacuum Utility Potholing of various utilities with +/-12"x12" holes at 49 locations for the design phase of City of Tucson Road Recovery Proposition 101 Rehabilitation Package 10.
TR-ROW-0123-00229 Complete 01/10/2023 06/07/2023 BLDG 5 UNIT 5201 Right-of-Way (ROW) Air Vacuum Utility Potholing of various utilities with +/-12"x12" holes at 49 locations for the design phase of City of Tucson Road Recovery Proposition 101 Rehabilitation Package 10.
TR-ROW-0123-00229 Complete 01/10/2023 06/07/2023 BLDG 5 UNIT 5202 Right-of-Way (ROW) Air Vacuum Utility Potholing of various utilities with +/-12"x12" holes at 49 locations for the design phase of City of Tucson Road Recovery Proposition 101 Rehabilitation Package 10.
TR-ROW-0123-00229 Complete 01/10/2023 06/07/2023 BLDG 5 UNIT 5203 Right-of-Way (ROW) Air Vacuum Utility Potholing of various utilities with +/-12"x12" holes at 49 locations for the design phase of City of Tucson Road Recovery Proposition 101 Rehabilitation Package 10.
TR-ROW-0123-00229 Complete 01/10/2023 06/07/2023 BLDG 5 UNIT 5204 Right-of-Way (ROW) Air Vacuum Utility Potholing of various utilities with +/-12"x12" holes at 49 locations for the design phase of City of Tucson Road Recovery Proposition 101 Rehabilitation Package 10.
TR-ROW-0123-00229 Complete 01/10/2023 06/07/2023 BLDG 5 UNIT 5205 Right-of-Way (ROW) Air Vacuum Utility Potholing of various utilities with +/-12"x12" holes at 49 locations for the design phase of City of Tucson Road Recovery Proposition 101 Rehabilitation Package 10.
TR-ROW-0123-00229 Complete 01/10/2023 06/07/2023 BLDG 5 UNIT 5206 Right-of-Way (ROW) Air Vacuum Utility Potholing of various utilities with +/-12"x12" holes at 49 locations for the design phase of City of Tucson Road Recovery Proposition 101 Rehabilitation Package 10.
TR-ROW-0123-00229 Complete 01/10/2023 06/07/2023 BLDG 5 UNIT 5207 Right-of-Way (ROW) Air Vacuum Utility Potholing of various utilities with +/-12"x12" holes at 49 locations for the design phase of City of Tucson Road Recovery Proposition 101 Rehabilitation Package 10.
TR-ROW-0123-00229 Complete 01/10/2023 06/07/2023 BLDG 5 UNIT 5208 Right-of-Way (ROW) Air Vacuum Utility Potholing of various utilities with +/-12"x12" holes at 49 locations for the design phase of City of Tucson Road Recovery Proposition 101 Rehabilitation Package 10.
TR-ROW-0123-00229 Complete 01/10/2023 06/07/2023 BLDG 5 UNIT 5209 Right-of-Way (ROW) Air Vacuum Utility Potholing of various utilities with +/-12"x12" holes at 49 locations for the design phase of City of Tucson Road Recovery Proposition 101 Rehabilitation Package 10.
TR-ROW-0123-00229 Complete 01/10/2023 06/07/2023 BLDG 5 UNIT 5210 Right-of-Way (ROW) Air Vacuum Utility Potholing of various utilities with +/-12"x12" holes at 49 locations for the design phase of City of Tucson Road Recovery Proposition 101 Rehabilitation Package 10.
TR-ROW-0123-00229 Complete 01/10/2023 06/07/2023 BLDG 5 UNIT 5301 Right-of-Way (ROW) Air Vacuum Utility Potholing of various utilities with +/-12"x12" holes at 49 locations for the design phase of City of Tucson Road Recovery Proposition 101 Rehabilitation Package 10.
TR-ROW-0123-00229 Complete 01/10/2023 06/07/2023 BLDG 5 UNIT 5302 Right-of-Way (ROW) Air Vacuum Utility Potholing of various utilities with +/-12"x12" holes at 49 locations for the design phase of City of Tucson Road Recovery Proposition 101 Rehabilitation Package 10.
TR-ROW-0123-00229 Complete 01/10/2023 06/07/2023 BLDG 5 UNIT 5303 Right-of-Way (ROW) Air Vacuum Utility Potholing of various utilities with +/-12"x12" holes at 49 locations for the design phase of City of Tucson Road Recovery Proposition 101 Rehabilitation Package 10.
TR-ROW-0123-00229 Complete 01/10/2023 06/07/2023 BLDG 5 UNIT 5304 Right-of-Way (ROW) Air Vacuum Utility Potholing of various utilities with +/-12"x12" holes at 49 locations for the design phase of City of Tucson Road Recovery Proposition 101 Rehabilitation Package 10.
TR-ROW-0123-00229 Complete 01/10/2023 06/07/2023 BLDG 5 UNIT 5305 Right-of-Way (ROW) Air Vacuum Utility Potholing of various utilities with +/-12"x12" holes at 49 locations for the design phase of City of Tucson Road Recovery Proposition 101 Rehabilitation Package 10.
TR-ROW-0123-00229 Complete 01/10/2023 06/07/2023 BLDG 5 UNIT 5306 Right-of-Way (ROW) Air Vacuum Utility Potholing of various utilities with +/-12"x12" holes at 49 locations for the design phase of City of Tucson Road Recovery Proposition 101 Rehabilitation Package 10.
TR-ROW-0123-00229 Complete 01/10/2023 06/07/2023 BLDG 5 UNIT 5307 Right-of-Way (ROW) Air Vacuum Utility Potholing of various utilities with +/-12"x12" holes at 49 locations for the design phase of City of Tucson Road Recovery Proposition 101 Rehabilitation Package 10.
TR-ROW-0123-00229 Complete 01/10/2023 06/07/2023 BLDG 5 UNIT 5308 Right-of-Way (ROW) Air Vacuum Utility Potholing of various utilities with +/-12"x12" holes at 49 locations for the design phase of City of Tucson Road Recovery Proposition 101 Rehabilitation Package 10.
TR-ROW-0123-00229 Complete 01/10/2023 06/07/2023 BLDG 5 UNIT 5309 Right-of-Way (ROW) Air Vacuum Utility Potholing of various utilities with +/-12"x12" holes at 49 locations for the design phase of City of Tucson Road Recovery Proposition 101 Rehabilitation Package 10.
TR-ROW-0123-00229 Complete 01/10/2023 06/07/2023 BLDG 5 UNIT 5310 Right-of-Way (ROW) Air Vacuum Utility Potholing of various utilities with +/-12"x12" holes at 49 locations for the design phase of City of Tucson Road Recovery Proposition 101 Rehabilitation Package 10.
TR-ROW-0123-00229 Complete 01/10/2023 06/07/2023 UNIT 151 Right-of-Way (ROW) Air Vacuum Utility Potholing of various utilities with +/-12"x12" holes at 49 locations for the design phase of City of Tucson Road Recovery Proposition 101 Rehabilitation Package 10.
TR-ROW-0123-00229 Complete 01/10/2023 06/07/2023 UNIT 415 Right-of-Way (ROW) Air Vacuum Utility Potholing of various utilities with +/-12"x12" holes at 49 locations for the design phase of City of Tucson Road Recovery Proposition 101 Rehabilitation Package 10.
T22CM00397 Issued 01/19/2022 08/20/2023 Residential Building - One or Two Family R-Bedroom Bathroom Addition

Code Enforcement

Parcel Number - 117083950
Date - 10/23/2024 3:32 a.m.
Total Number Of Code Cases - 1
Case Number Case Status Entered Date Closed Date Unit Type Description
T12DV01861 Complian 03/12/2012 N/A DNR_VIOL WEEDS