Parcel Search: 11708223A
Parcel Search
Parcel Attributes
| Parcel | 11708223A |
|---|---|
| Jurisdiction | Tucson, Pima County |
| Water Course | Street+culvert |
| City of Tucson Zoning | C-3 |
| Tucson Ward | Ward 5 |
| Tucson Downtown Incentive Zone | Downtown Infill Incentive District |
| Tucson Registered Neighborhood | Barrio Santa Rosa |
| Pima County Data | Assessor, Recorder, Treasurer, ... |
| Parcel Map | Map |
| Addresses | |
| Parcel Attributes Issue? | |
Annexations & Original City Zoning (OCZ)
Date - 05/10/2026 2:03 a.m.
Total Number Of OZC Plans - (1)
| Plan | Description | Annexation Ordinance | Effective Date | OCZ Ordinance |
|---|---|---|---|---|
| Original Town Of Tucson | ORIGINAL | 08/07/1877 |
Special Development Requests & Requirements
Date - 05/10/2026 2:03 a.m.
Total Number Of Special Development Permits - (2)
| Activity Number | Status | Apply Date | Expired Date | Type | Description |
|---|---|---|---|---|---|
| T19SA00233 | Approved | N/A | IID-19-10 The Flash TV Proposed mixed-use IID project to be developed on two sites | ||
| T20SA00036 | Complete | N/A | ZONING LETTER |
Permits
Parcel Number - 11708223A
Date - 05/10/2026 2:03 a.m.
Total Number Of Permits - (51)
| Permit | Permit Status | Entered Date | Expired Date | Unit | Type | Description |
|---|---|---|---|---|---|---|
| TC-RES-0526-02423 | Fees due | 05/07/2026 | N/A | UNIT 101 | Residential Building - One or Two Family | The electronic trip component in this meter pack is faulty and requires a power kill to replace it's a 20 minute repair. |
| TC-RES-0526-02423 | Fees due | 05/07/2026 | N/A | UNIT 102 | Residential Building - One or Two Family | The electronic trip component in this meter pack is faulty and requires a power kill to replace it's a 20 minute repair. |
| TC-RES-0526-02423 | Fees due | 05/07/2026 | N/A | UNIT 103 | Residential Building - One or Two Family | The electronic trip component in this meter pack is faulty and requires a power kill to replace it's a 20 minute repair. |
| TC-RES-0526-02423 | Fees due | 05/07/2026 | N/A | UNIT 104 | Residential Building - One or Two Family | The electronic trip component in this meter pack is faulty and requires a power kill to replace it's a 20 minute repair. |
| TC-RES-0526-02423 | Fees due | 05/07/2026 | N/A | UNIT 105 | Residential Building - One or Two Family | The electronic trip component in this meter pack is faulty and requires a power kill to replace it's a 20 minute repair. |
| TC-RES-0526-02423 | Fees due | 05/07/2026 | N/A | UNIT 106 | Residential Building - One or Two Family | The electronic trip component in this meter pack is faulty and requires a power kill to replace it's a 20 minute repair. |
| TC-RES-0526-02423 | Fees due | 05/07/2026 | N/A | UNIT 107 | Residential Building - One or Two Family | The electronic trip component in this meter pack is faulty and requires a power kill to replace it's a 20 minute repair. |
| TC-RES-0526-02423 | Fees due | 05/07/2026 | N/A | UNIT 108 | Residential Building - One or Two Family | The electronic trip component in this meter pack is faulty and requires a power kill to replace it's a 20 minute repair. |
| TC-RES-0526-02423 | Fees due | 05/07/2026 | N/A | UNIT 109 | Residential Building - One or Two Family | The electronic trip component in this meter pack is faulty and requires a power kill to replace it's a 20 minute repair. |
| TC-RES-0526-02423 | Fees due | 05/07/2026 | N/A | UNIT 110 | Residential Building - One or Two Family | The electronic trip component in this meter pack is faulty and requires a power kill to replace it's a 20 minute repair. |
| TC-RES-0526-02423 | Fees due | 05/07/2026 | N/A | UNIT 111 | Residential Building - One or Two Family | The electronic trip component in this meter pack is faulty and requires a power kill to replace it's a 20 minute repair. |
| TC-RES-0526-02423 | Fees due | 05/07/2026 | N/A | UNIT 201 | Residential Building - One or Two Family | The electronic trip component in this meter pack is faulty and requires a power kill to replace it's a 20 minute repair. |
| TC-RES-0526-02423 | Fees due | 05/07/2026 | N/A | UNIT 202 | Residential Building - One or Two Family | The electronic trip component in this meter pack is faulty and requires a power kill to replace it's a 20 minute repair. |
| TC-RES-0526-02423 | Fees due | 05/07/2026 | N/A | UNIT 203 | Residential Building - One or Two Family | The electronic trip component in this meter pack is faulty and requires a power kill to replace it's a 20 minute repair. |
| TC-RES-0526-02423 | Fees due | 05/07/2026 | N/A | UNIT 204 | Residential Building - One or Two Family | The electronic trip component in this meter pack is faulty and requires a power kill to replace it's a 20 minute repair. |
| TC-RES-0526-02423 | Fees due | 05/07/2026 | N/A | UNIT 205 | Residential Building - One or Two Family | The electronic trip component in this meter pack is faulty and requires a power kill to replace it's a 20 minute repair. |
| TC-RES-0526-02423 | Fees due | 05/07/2026 | N/A | UNIT 206 | Residential Building - One or Two Family | The electronic trip component in this meter pack is faulty and requires a power kill to replace it's a 20 minute repair. |
| TC-RES-0526-02423 | Fees due | 05/07/2026 | N/A | UNIT 207 | Residential Building - One or Two Family | The electronic trip component in this meter pack is faulty and requires a power kill to replace it's a 20 minute repair. |
| TC-RES-0526-02423 | Fees due | 05/07/2026 | N/A | UNIT 208 | Residential Building - One or Two Family | The electronic trip component in this meter pack is faulty and requires a power kill to replace it's a 20 minute repair. |
| TC-RES-0526-02423 | Fees due | 05/07/2026 | N/A | UNIT 209 | Residential Building - One or Two Family | The electronic trip component in this meter pack is faulty and requires a power kill to replace it's a 20 minute repair. |
| TC-RES-0526-02423 | Fees due | 05/07/2026 | N/A | UNIT 210 | Residential Building - One or Two Family | The electronic trip component in this meter pack is faulty and requires a power kill to replace it's a 20 minute repair. |
| TC-RES-0526-02423 | Fees due | 05/07/2026 | N/A | UNIT 211 | Residential Building - One or Two Family | The electronic trip component in this meter pack is faulty and requires a power kill to replace it's a 20 minute repair. |
| TC-RES-0526-02423 | Fees due | 05/07/2026 | N/A | UNIT 301 | Residential Building - One or Two Family | The electronic trip component in this meter pack is faulty and requires a power kill to replace it's a 20 minute repair. |
| TC-RES-0526-02423 | Fees due | 05/07/2026 | N/A | UNIT 302 | Residential Building - One or Two Family | The electronic trip component in this meter pack is faulty and requires a power kill to replace it's a 20 minute repair. |
| TC-RES-0526-02423 | Fees due | 05/07/2026 | N/A | UNIT 303 | Residential Building - One or Two Family | The electronic trip component in this meter pack is faulty and requires a power kill to replace it's a 20 minute repair. |
| TC-RES-0526-02423 | Fees due | 05/07/2026 | N/A | UNIT 304 | Residential Building - One or Two Family | The electronic trip component in this meter pack is faulty and requires a power kill to replace it's a 20 minute repair. |
| TC-RES-0526-02423 | Fees due | 05/07/2026 | N/A | UNIT 305 | Residential Building - One or Two Family | The electronic trip component in this meter pack is faulty and requires a power kill to replace it's a 20 minute repair. |
| TC-RES-0526-02423 | Fees due | 05/07/2026 | N/A | UNIT 306 | Residential Building - One or Two Family | The electronic trip component in this meter pack is faulty and requires a power kill to replace it's a 20 minute repair. |
| TC-RES-0526-02423 | Fees due | 05/07/2026 | N/A | UNIT 307 | Residential Building - One or Two Family | The electronic trip component in this meter pack is faulty and requires a power kill to replace it's a 20 minute repair. |
| TC-RES-0526-02423 | Fees due | 05/07/2026 | N/A | UNIT 308 | Residential Building - One or Two Family | The electronic trip component in this meter pack is faulty and requires a power kill to replace it's a 20 minute repair. |
| TC-RES-0526-02423 | Fees due | 05/07/2026 | N/A | UNIT 309 | Residential Building - One or Two Family | The electronic trip component in this meter pack is faulty and requires a power kill to replace it's a 20 minute repair. |
| TC-RES-0526-02423 | Fees due | 05/07/2026 | N/A | UNIT 310 | Residential Building - One or Two Family | The electronic trip component in this meter pack is faulty and requires a power kill to replace it's a 20 minute repair. |
| TC-RES-0526-02423 | Fees due | 05/07/2026 | N/A | UNIT 311 | Residential Building - One or Two Family | The electronic trip component in this meter pack is faulty and requires a power kill to replace it's a 20 minute repair. |
| DP15-0081 | Approved | 05/18/2015 | N/A | Development Package | SITE/GRADING: AAFM CO AUTO SALES | |
| T22CM07036 | Complete | 09/13/2022 | 08/19/2025 | Commercial Building | TI: Apartments | |
| DS19-16 | Approved | 09/18/2019 | N/A | Zoning Compliance | THE FLASH SOUTH, TSMR - TSMR, Flash South: Driveway - TSM 10-01.4.0. Trash Enclosure - TS 8-01.5.2 and TS 8-01.5.3. | |
| DP17-0249 | Complete | 10/11/2017 | 08/31/2022 | Development Package | SITE/GRADING/ IID - The Flash SOUTH, 30-unit apt. project. | |
| TF-FCP-1224-01053 | Complete | 12/05/2024 | 07/09/2025 | Fire Construction Permit | Provide fire alarm coverage in (2) rooms that were separated in TI. | |
| DP14-0165 | Withdrwn | 09/17/2014 | N/A | DEVPKG | ||
| T13CM05481 | Withdrwn | 09/05/2013 | N/A | COMBO | ADD STEEL BUILDING | |
| T19BU00379 | Expired | 07/16/2019 | 03/15/2020 | DEMO | FULL DEMO | |
| T20CM01374 | C of o | 02/29/2020 | 09/05/2022 | COMBO | NEW APARTMENT BUILDING | |
| T20FC00569 | Final | 09/02/2020 | 08/28/2022 | FIRECONS | Install a complete wet pipe sprinkler system | |
| T20FC00755 | Final | 11/05/2020 | 03/27/2022 | FIRECONS | 6" UG from 5 foot out to 140' property line | |
| T20RW02974 | Final | 05/26/2020 | 11/18/2022 | ROW | CLOSE SIDEWALK TO FENCE BUILDING THIS PROJECT IS LOCATED IN AN ARCHAEOLOGICAL SENSITIVITY ZONE. AN ARCHAEOLOGICAL MONITOR HIRED BY THE PERMIT APPLICANT IS REQUIRED TO BE ON-SITE DURING ANY DIGGING, UNLESS A WAIVER IS ISSUED. MONITORING REPORTS ARE TO BE SUBMITTED TO HISTORIC PRESERVATION OFFICE, CITY OF TUCSON, P.O. BOX 27210, TUCSON, AZ 85726.** PLEASE CONTACT JODIE BROWN AT JODIE.BROWN@TUCSONAZ.GOV WITH ANY QUESTIONS. R5 PLAN ADDITION - SEWER BYPASS FOR MANHOLE INSTALLATIN | |
| T20RW05686 | Final | 10/16/2020 | 02/19/2021 | ROW | DIG 10”L X 10’W X 10’D TO PLACE SEWER MANHOLE ON RUSSELL AVE. 24HR CLOSURE WORK LOCATION IS IN REAR OF ADDRESS AT RUSSEL AND 19TH ST INGRESS/ EGRESS FOR BUSINESS AND RESIDENTIAL ACCESS SHALL BE MAINTAINED. FIELD ADJUSTMENTS MAY BE REQUIRED. PAVEMENT PATCHING IS NECESSARY WHERE PAVEMENT IS CUT. PATCH LIMITS- THE LIMITS OF THE PAVING SHALL BE A MINIMUM OF 1-FT OUTSIDE THE EXCAVATION. POTHOLES SPACED CLOSELY TOGETHER AND WITHIN 8-FT OF EACH OTHER WILL NEED TO BE JOINED TOGETHER BY ONE SURFACE PATCH. BACKFILL WITH CLSM SLURRY OR AGGREGATE BASE COURSE (ABC.) ASPHALTIC CONCRETE USED SHALL BE CITY OF TUCSON MIX NO. 3 OR COT MIX NO. 2 WITH TR-22, INSPECTOR TO ADVISE. REPAIR ALL LANDSCAPING DISTURBED. THIS INCLUDES IRRIGATION, PLANTINGS, GROUNDCOVER, AND HARDSCAPE. REPLACE/ REFRESH ALL STRIPING THAT IS INTERRUPTED BY PATCHES. GOOD HOUSEKEEPING MEASURES SHALL BE PRACTICED DURING WORK AND CONSTRUCTION MAINTAIN PEDESTRIAN ACCESS | |
| T20RW05997 | Final | 11/04/2020 | 12/17/2020 | ROW | INSTALL NEW 2" COPPER SERVICE WITH 1 1/2" METER OFF REDUCER @ 10 LF., | |
| T21FC00397 | Final | 05/25/2021 | 09/05/2022 | FIRECONS | Bldg #3 - New Fire Alarm Installation | |
| T21RW00450 | Final | 01/28/2021 | 03/07/2021 | ROW | THE FLASH SOUTH, DP17-0249 INSTALLING A 6" FIRE PROTECTION SERVICE AND 2" WATER SERVICE WITH 1.5" WATER METER. OTHER ACTIVITIES IN THE AREA, WILL NEED TO COORDINATE TRAFFIC CONTROL SETUP WITH EXISTING SETUP. This project is located in an Archaeological Sensitivity Zone. An Archaeological Monitor hired by the permit applicant is required to be on-site during any digging, unless a waiver is issued. Monitoring reports are to be submitted to Historic Preservation Office, City of Tucson, P.O. Box 27210, Tucson, AZ 85726.** Please contact Jodie Brown at Jodie.Brown@tucsonaz.gov with any questions. | |
| T21RW04426 | Final | 09/27/2021 | 01/04/2022 | ROW | DP17-0249 DEMO CURB AND SIDE WALK ON 6TH , INSTALL NEW 25' DEMO DRIVEWAY,CURB , AND SIDE WALK ON 19TH ST T19SA00233 | |
| T21RW05145 | Final | 12/03/2021 | 01/06/2022 | ROW | TEP TO WORK IN RIGHT-OF-WAY TO INSTALL RISER ON POLE AND PULL CABLE INTO CONDUIT. WORK LOCATION IS BEHIND ADDRESS ON RUSSELL AV. ** PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING. IN THE EVENT THAT WEEKEND OR AFTER-HOURS WORK IS INTENDED, CONTACT COT INSPECTION STAFF 48 HOURS PRIOR TO THE WEEKEND. DAN ROBERTSON AT 520-400-6722 OR TOM ADKINS AT 520-400-3813. |
Code Enforcement
Parcel Number - 11708223A
Date - 05/10/2026 2:03 a.m.
Total Number Of Code Cases - 4
| Case Number | Case Status | Entered Date | Closed Date | Unit | Type | Description |
|---|---|---|---|---|---|---|
| T12DV05314 | Complian | 06/26/2012 | N/A | DNR_VIOL | Individual conducting business as a swap meet, no site plan approval for the current use. | |
| T14DV07526 | Complian | 09/17/2014 | N/A | DNR_VIOL | Parcel number is 117-08-223A and has two addresses. The used car lot on the north portion of the property has expanded on to the south portion of the property. The south portion of the property has been paved and is being used for auto display and storage. Permits have expired for development on the south portion of the property. Expansion of existing development is over 100 percent. No landscaping. | |
| T19DV04235 | Complian | 05/23/2019 | N/A | DNR_VIOL | homeless camp | |
| T20DV07279 | Complian | 11/05/2020 | N/A | DNR_VIOL | WORKING AT 3:30AM, NOISE, DISTURBING NEIGHBORS - SPECIFICALLY: Durazo Construction is the GC & Preferred Concrete Pumping |