Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Parcel Search

 
Parcel Attributes
Parcel11702191G
JurisdictionTucson
City of Tucson ZoningC-3
Water Course

Washes

Tucson WardWard 1
Tucson Downtown Incentive ZoneDowntown Infill Incentive District
Tucson Registered NeighborhoodDunbar Spring
Major Streets & Routes

Arterial or Collector

,

Intersection Buffer

National Register Historic District

Miracle Mile Historic District

Pima County Data Assessor, Recorder, Treasurer, ...
Parcel Map Map
Address

Annexations & Original City Zoning (OCZ)

Date - 12/25/2024 7:33 p.m.
Total Number Of OZC Plans - (1)
Plan Description Annexation Ordinance Effective Date OCZ Ordinance
Original Town Of Tucson ORIGINAL 08/07/1877 None

Special Development Requests & Requirements

Date - 12/25/2024 7:33 p.m.
Total Number Of Special Development Permits - (5)
Activity Number Status Apply Date Expired Date Type Description
H000002023 Closed N/A
T18SA00087 Applied N/A Letter of concurrence regarding residential density.
T19SA00343 Complete N/A ZONING LETTER
T21SA00031 Approved N/A MASTER SIGN PROGRAM - MSP-21-01 SAHARA Exceed total sign area in commercial district for 3 tenants (sign design can be identified, but not all tenant names known), exceed number of freestanding signs for the frontage, 2nd pole sign for the frontage, leave off pole cover
T21SA00452 Complete N/A Zoning compliance letter for mixed-use development

Permits

Parcel Number - 11702191G
Date - 12/25/2024 7:33 p.m.
Total Number Of Permits - (221)
Permit Permit Status Entered Date Expired Date Unit Type Description
TR-ROW-0123-00229 Complete 01/10/2023 06/07/2023 Right-of-Way (ROW) Air Vacuum Utility Potholing of various utilities with +/-12"x12" holes at 49 locations for the design phase of City of Tucson Road Recovery Proposition 101 Rehabilitation Package 10.
TR-ROW-0123-00229 Complete 01/10/2023 06/07/2023 BLDG 1 Right-of-Way (ROW) Air Vacuum Utility Potholing of various utilities with +/-12"x12" holes at 49 locations for the design phase of City of Tucson Road Recovery Proposition 101 Rehabilitation Package 10.
TR-ROW-0123-00229 Complete 01/10/2023 06/07/2023 BLDG 1 UNIT 1101 Right-of-Way (ROW) Air Vacuum Utility Potholing of various utilities with +/-12"x12" holes at 49 locations for the design phase of City of Tucson Road Recovery Proposition 101 Rehabilitation Package 10.
TR-ROW-0123-00229 Complete 01/10/2023 06/07/2023 BLDG 1 UNIT 1102 Right-of-Way (ROW) Air Vacuum Utility Potholing of various utilities with +/-12"x12" holes at 49 locations for the design phase of City of Tucson Road Recovery Proposition 101 Rehabilitation Package 10.
TR-ROW-0123-00229 Complete 01/10/2023 06/07/2023 BLDG 1 UNIT 1103 Right-of-Way (ROW) Air Vacuum Utility Potholing of various utilities with +/-12"x12" holes at 49 locations for the design phase of City of Tucson Road Recovery Proposition 101 Rehabilitation Package 10.
TR-ROW-0123-00229 Complete 01/10/2023 06/07/2023 BLDG 1 UNIT 1201 Right-of-Way (ROW) Air Vacuum Utility Potholing of various utilities with +/-12"x12" holes at 49 locations for the design phase of City of Tucson Road Recovery Proposition 101 Rehabilitation Package 10.
TR-ROW-0123-00229 Complete 01/10/2023 06/07/2023 BLDG 1 UNIT 1202 Right-of-Way (ROW) Air Vacuum Utility Potholing of various utilities with +/-12"x12" holes at 49 locations for the design phase of City of Tucson Road Recovery Proposition 101 Rehabilitation Package 10.
TR-ROW-0123-00229 Complete 01/10/2023 06/07/2023 BLDG 1 UNIT 1203 Right-of-Way (ROW) Air Vacuum Utility Potholing of various utilities with +/-12"x12" holes at 49 locations for the design phase of City of Tucson Road Recovery Proposition 101 Rehabilitation Package 10.
TR-ROW-0123-00229 Complete 01/10/2023 06/07/2023 BLDG 2 Right-of-Way (ROW) Air Vacuum Utility Potholing of various utilities with +/-12"x12" holes at 49 locations for the design phase of City of Tucson Road Recovery Proposition 101 Rehabilitation Package 10.
TR-ROW-0123-00229 Complete 01/10/2023 06/07/2023 BLDG 2 UNIT 2101 Right-of-Way (ROW) Air Vacuum Utility Potholing of various utilities with +/-12"x12" holes at 49 locations for the design phase of City of Tucson Road Recovery Proposition 101 Rehabilitation Package 10.
TR-ROW-0123-00229 Complete 01/10/2023 06/07/2023 BLDG 2 UNIT 2102 Right-of-Way (ROW) Air Vacuum Utility Potholing of various utilities with +/-12"x12" holes at 49 locations for the design phase of City of Tucson Road Recovery Proposition 101 Rehabilitation Package 10.
TR-ROW-0123-00229 Complete 01/10/2023 06/07/2023 BLDG 2 UNIT 2103 Right-of-Way (ROW) Air Vacuum Utility Potholing of various utilities with +/-12"x12" holes at 49 locations for the design phase of City of Tucson Road Recovery Proposition 101 Rehabilitation Package 10.
TR-ROW-0123-00229 Complete 01/10/2023 06/07/2023 BLDG 2 UNIT 2104 Right-of-Way (ROW) Air Vacuum Utility Potholing of various utilities with +/-12"x12" holes at 49 locations for the design phase of City of Tucson Road Recovery Proposition 101 Rehabilitation Package 10.
TR-ROW-0123-00229 Complete 01/10/2023 06/07/2023 BLDG 2 UNIT 2105 Right-of-Way (ROW) Air Vacuum Utility Potholing of various utilities with +/-12"x12" holes at 49 locations for the design phase of City of Tucson Road Recovery Proposition 101 Rehabilitation Package 10.
TR-ROW-0123-00229 Complete 01/10/2023 06/07/2023 BLDG 2 UNIT 2201 Right-of-Way (ROW) Air Vacuum Utility Potholing of various utilities with +/-12"x12" holes at 49 locations for the design phase of City of Tucson Road Recovery Proposition 101 Rehabilitation Package 10.
TR-ROW-0123-00229 Complete 01/10/2023 06/07/2023 BLDG 2 UNIT 2202 Right-of-Way (ROW) Air Vacuum Utility Potholing of various utilities with +/-12"x12" holes at 49 locations for the design phase of City of Tucson Road Recovery Proposition 101 Rehabilitation Package 10.
TR-ROW-0123-00229 Complete 01/10/2023 06/07/2023 BLDG 2 UNIT 2203 Right-of-Way (ROW) Air Vacuum Utility Potholing of various utilities with +/-12"x12" holes at 49 locations for the design phase of City of Tucson Road Recovery Proposition 101 Rehabilitation Package 10.
TR-ROW-0123-00229 Complete 01/10/2023 06/07/2023 BLDG 2 UNIT 2204 Right-of-Way (ROW) Air Vacuum Utility Potholing of various utilities with +/-12"x12" holes at 49 locations for the design phase of City of Tucson Road Recovery Proposition 101 Rehabilitation Package 10.
TR-ROW-0123-00229 Complete 01/10/2023 06/07/2023 BLDG 2 UNIT 2205 Right-of-Way (ROW) Air Vacuum Utility Potholing of various utilities with +/-12"x12" holes at 49 locations for the design phase of City of Tucson Road Recovery Proposition 101 Rehabilitation Package 10.
TR-ROW-0123-00229 Complete 01/10/2023 06/07/2023 BLDG 2 UNIT 2301 Right-of-Way (ROW) Air Vacuum Utility Potholing of various utilities with +/-12"x12" holes at 49 locations for the design phase of City of Tucson Road Recovery Proposition 101 Rehabilitation Package 10.
TR-ROW-0123-00229 Complete 01/10/2023 06/07/2023 BLDG 2 UNIT 2302 Right-of-Way (ROW) Air Vacuum Utility Potholing of various utilities with +/-12"x12" holes at 49 locations for the design phase of City of Tucson Road Recovery Proposition 101 Rehabilitation Package 10.
TR-ROW-0123-00229 Complete 01/10/2023 06/07/2023 BLDG 2 UNIT 2303 Right-of-Way (ROW) Air Vacuum Utility Potholing of various utilities with +/-12"x12" holes at 49 locations for the design phase of City of Tucson Road Recovery Proposition 101 Rehabilitation Package 10.
TR-ROW-0123-00229 Complete 01/10/2023 06/07/2023 BLDG 2 UNIT 2304 Right-of-Way (ROW) Air Vacuum Utility Potholing of various utilities with +/-12"x12" holes at 49 locations for the design phase of City of Tucson Road Recovery Proposition 101 Rehabilitation Package 10.
TR-ROW-0123-00229 Complete 01/10/2023 06/07/2023 BLDG 2 UNIT 2305 Right-of-Way (ROW) Air Vacuum Utility Potholing of various utilities with +/-12"x12" holes at 49 locations for the design phase of City of Tucson Road Recovery Proposition 101 Rehabilitation Package 10.
TR-ROW-0123-00229 Complete 01/10/2023 06/07/2023 BLDG 3 Right-of-Way (ROW) Air Vacuum Utility Potholing of various utilities with +/-12"x12" holes at 49 locations for the design phase of City of Tucson Road Recovery Proposition 101 Rehabilitation Package 10.
TR-ROW-0123-00229 Complete 01/10/2023 06/07/2023 BLDG 3 UNIT 3101 Right-of-Way (ROW) Air Vacuum Utility Potholing of various utilities with +/-12"x12" holes at 49 locations for the design phase of City of Tucson Road Recovery Proposition 101 Rehabilitation Package 10.
TR-ROW-0123-00229 Complete 01/10/2023 06/07/2023 BLDG 3 UNIT 3102 Right-of-Way (ROW) Air Vacuum Utility Potholing of various utilities with +/-12"x12" holes at 49 locations for the design phase of City of Tucson Road Recovery Proposition 101 Rehabilitation Package 10.
TR-ROW-0123-00229 Complete 01/10/2023 06/07/2023 BLDG 3 UNIT 3103 Right-of-Way (ROW) Air Vacuum Utility Potholing of various utilities with +/-12"x12" holes at 49 locations for the design phase of City of Tucson Road Recovery Proposition 101 Rehabilitation Package 10.
TR-ROW-0123-00229 Complete 01/10/2023 06/07/2023 BLDG 3 UNIT 3104 Right-of-Way (ROW) Air Vacuum Utility Potholing of various utilities with +/-12"x12" holes at 49 locations for the design phase of City of Tucson Road Recovery Proposition 101 Rehabilitation Package 10.
TR-ROW-0123-00229 Complete 01/10/2023 06/07/2023 BLDG 3 UNIT 3105 Right-of-Way (ROW) Air Vacuum Utility Potholing of various utilities with +/-12"x12" holes at 49 locations for the design phase of City of Tucson Road Recovery Proposition 101 Rehabilitation Package 10.
TR-ROW-0123-00229 Complete 01/10/2023 06/07/2023 BLDG 3 UNIT 3106 Right-of-Way (ROW) Air Vacuum Utility Potholing of various utilities with +/-12"x12" holes at 49 locations for the design phase of City of Tucson Road Recovery Proposition 101 Rehabilitation Package 10.
TR-ROW-0123-00229 Complete 01/10/2023 06/07/2023 BLDG 3 UNIT 3107 Right-of-Way (ROW) Air Vacuum Utility Potholing of various utilities with +/-12"x12" holes at 49 locations for the design phase of City of Tucson Road Recovery Proposition 101 Rehabilitation Package 10.
TR-ROW-0123-00229 Complete 01/10/2023 06/07/2023 BLDG 3 UNIT 3108 Right-of-Way (ROW) Air Vacuum Utility Potholing of various utilities with +/-12"x12" holes at 49 locations for the design phase of City of Tucson Road Recovery Proposition 101 Rehabilitation Package 10.
TR-ROW-0123-00229 Complete 01/10/2023 06/07/2023 BLDG 3 UNIT 3109 Right-of-Way (ROW) Air Vacuum Utility Potholing of various utilities with +/-12"x12" holes at 49 locations for the design phase of City of Tucson Road Recovery Proposition 101 Rehabilitation Package 10.
TR-ROW-0123-00229 Complete 01/10/2023 06/07/2023 BLDG 3 UNIT 3110 Right-of-Way (ROW) Air Vacuum Utility Potholing of various utilities with +/-12"x12" holes at 49 locations for the design phase of City of Tucson Road Recovery Proposition 101 Rehabilitation Package 10.
TR-ROW-0123-00229 Complete 01/10/2023 06/07/2023 BLDG 3 UNIT 3111 Right-of-Way (ROW) Air Vacuum Utility Potholing of various utilities with +/-12"x12" holes at 49 locations for the design phase of City of Tucson Road Recovery Proposition 101 Rehabilitation Package 10.
TR-ROW-0123-00229 Complete 01/10/2023 06/07/2023 BLDG 3 UNIT 3112 Right-of-Way (ROW) Air Vacuum Utility Potholing of various utilities with +/-12"x12" holes at 49 locations for the design phase of City of Tucson Road Recovery Proposition 101 Rehabilitation Package 10.
TR-ROW-0123-00229 Complete 01/10/2023 06/07/2023 BLDG 3 UNIT 3113 Right-of-Way (ROW) Air Vacuum Utility Potholing of various utilities with +/-12"x12" holes at 49 locations for the design phase of City of Tucson Road Recovery Proposition 101 Rehabilitation Package 10.
TR-ROW-0123-00229 Complete 01/10/2023 06/07/2023 BLDG 3 UNIT 3114 Right-of-Way (ROW) Air Vacuum Utility Potholing of various utilities with +/-12"x12" holes at 49 locations for the design phase of City of Tucson Road Recovery Proposition 101 Rehabilitation Package 10.
TR-ROW-0123-00229 Complete 01/10/2023 06/07/2023 BLDG 3 UNIT 3115 Right-of-Way (ROW) Air Vacuum Utility Potholing of various utilities with +/-12"x12" holes at 49 locations for the design phase of City of Tucson Road Recovery Proposition 101 Rehabilitation Package 10.
TR-ROW-0123-00229 Complete 01/10/2023 06/07/2023 BLDG 3 UNIT 3116 Right-of-Way (ROW) Air Vacuum Utility Potholing of various utilities with +/-12"x12" holes at 49 locations for the design phase of City of Tucson Road Recovery Proposition 101 Rehabilitation Package 10.
TR-ROW-0123-00229 Complete 01/10/2023 06/07/2023 BLDG 3 UNIT 3117 Right-of-Way (ROW) Air Vacuum Utility Potholing of various utilities with +/-12"x12" holes at 49 locations for the design phase of City of Tucson Road Recovery Proposition 101 Rehabilitation Package 10.
TR-ROW-0123-00229 Complete 01/10/2023 06/07/2023 BLDG 3 UNIT 3118 Right-of-Way (ROW) Air Vacuum Utility Potholing of various utilities with +/-12"x12" holes at 49 locations for the design phase of City of Tucson Road Recovery Proposition 101 Rehabilitation Package 10.
TR-ROW-0123-00229 Complete 01/10/2023 06/07/2023 BLDG 3 UNIT 3119 Right-of-Way (ROW) Air Vacuum Utility Potholing of various utilities with +/-12"x12" holes at 49 locations for the design phase of City of Tucson Road Recovery Proposition 101 Rehabilitation Package 10.
TR-ROW-0123-00229 Complete 01/10/2023 06/07/2023 BLDG 3 UNIT 3120 Right-of-Way (ROW) Air Vacuum Utility Potholing of various utilities with +/-12"x12" holes at 49 locations for the design phase of City of Tucson Road Recovery Proposition 101 Rehabilitation Package 10.
TR-ROW-0123-00229 Complete 01/10/2023 06/07/2023 BLDG 3 UNIT 3121 Right-of-Way (ROW) Air Vacuum Utility Potholing of various utilities with +/-12"x12" holes at 49 locations for the design phase of City of Tucson Road Recovery Proposition 101 Rehabilitation Package 10.
TR-ROW-0123-00229 Complete 01/10/2023 06/07/2023 BLDG 3 UNIT 3122 Right-of-Way (ROW) Air Vacuum Utility Potholing of various utilities with +/-12"x12" holes at 49 locations for the design phase of City of Tucson Road Recovery Proposition 101 Rehabilitation Package 10.
TR-ROW-0123-00229 Complete 01/10/2023 06/07/2023 BLDG 3 UNIT 3123 Right-of-Way (ROW) Air Vacuum Utility Potholing of various utilities with +/-12"x12" holes at 49 locations for the design phase of City of Tucson Road Recovery Proposition 101 Rehabilitation Package 10.
TR-ROW-0123-00229 Complete 01/10/2023 06/07/2023 BLDG 3 UNIT 3125 Right-of-Way (ROW) Air Vacuum Utility Potholing of various utilities with +/-12"x12" holes at 49 locations for the design phase of City of Tucson Road Recovery Proposition 101 Rehabilitation Package 10.
TR-ROW-0123-00229 Complete 01/10/2023 06/07/2023 BLDG 3 UNIT 3126 Right-of-Way (ROW) Air Vacuum Utility Potholing of various utilities with +/-12"x12" holes at 49 locations for the design phase of City of Tucson Road Recovery Proposition 101 Rehabilitation Package 10.
TR-ROW-0123-00229 Complete 01/10/2023 06/07/2023 BLDG 3 UNIT 3127 Right-of-Way (ROW) Air Vacuum Utility Potholing of various utilities with +/-12"x12" holes at 49 locations for the design phase of City of Tucson Road Recovery Proposition 101 Rehabilitation Package 10.
TR-ROW-0123-00229 Complete 01/10/2023 06/07/2023 BLDG 3 UNIT 3128 Right-of-Way (ROW) Air Vacuum Utility Potholing of various utilities with +/-12"x12" holes at 49 locations for the design phase of City of Tucson Road Recovery Proposition 101 Rehabilitation Package 10.
TR-ROW-0123-00229 Complete 01/10/2023 06/07/2023 BLDG 3 UNIT 3129 Right-of-Way (ROW) Air Vacuum Utility Potholing of various utilities with +/-12"x12" holes at 49 locations for the design phase of City of Tucson Road Recovery Proposition 101 Rehabilitation Package 10.
TR-ROW-0123-00229 Complete 01/10/2023 06/07/2023 BLDG 3 UNIT 3130 Right-of-Way (ROW) Air Vacuum Utility Potholing of various utilities with +/-12"x12" holes at 49 locations for the design phase of City of Tucson Road Recovery Proposition 101 Rehabilitation Package 10.
TR-ROW-0123-00229 Complete 01/10/2023 06/07/2023 BLDG 3 UNIT 3131 Right-of-Way (ROW) Air Vacuum Utility Potholing of various utilities with +/-12"x12" holes at 49 locations for the design phase of City of Tucson Road Recovery Proposition 101 Rehabilitation Package 10.
TR-ROW-0123-00229 Complete 01/10/2023 06/07/2023 BLDG 3 UNIT 3201 Right-of-Way (ROW) Air Vacuum Utility Potholing of various utilities with +/-12"x12" holes at 49 locations for the design phase of City of Tucson Road Recovery Proposition 101 Rehabilitation Package 10.
TR-ROW-0123-00229 Complete 01/10/2023 06/07/2023 BLDG 3 UNIT 3202 Right-of-Way (ROW) Air Vacuum Utility Potholing of various utilities with +/-12"x12" holes at 49 locations for the design phase of City of Tucson Road Recovery Proposition 101 Rehabilitation Package 10.
TR-ROW-0123-00229 Complete 01/10/2023 06/07/2023 BLDG 3 UNIT 3203 Right-of-Way (ROW) Air Vacuum Utility Potholing of various utilities with +/-12"x12" holes at 49 locations for the design phase of City of Tucson Road Recovery Proposition 101 Rehabilitation Package 10.
TR-ROW-0123-00229 Complete 01/10/2023 06/07/2023 BLDG 3 UNIT 3204 Right-of-Way (ROW) Air Vacuum Utility Potholing of various utilities with +/-12"x12" holes at 49 locations for the design phase of City of Tucson Road Recovery Proposition 101 Rehabilitation Package 10.
TR-ROW-0123-00229 Complete 01/10/2023 06/07/2023 BLDG 3 UNIT 3205 Right-of-Way (ROW) Air Vacuum Utility Potholing of various utilities with +/-12"x12" holes at 49 locations for the design phase of City of Tucson Road Recovery Proposition 101 Rehabilitation Package 10.
TR-ROW-0123-00229 Complete 01/10/2023 06/07/2023 BLDG 3 UNIT 3206 Right-of-Way (ROW) Air Vacuum Utility Potholing of various utilities with +/-12"x12" holes at 49 locations for the design phase of City of Tucson Road Recovery Proposition 101 Rehabilitation Package 10.
TR-ROW-0123-00229 Complete 01/10/2023 06/07/2023 BLDG 3 UNIT 3207 Right-of-Way (ROW) Air Vacuum Utility Potholing of various utilities with +/-12"x12" holes at 49 locations for the design phase of City of Tucson Road Recovery Proposition 101 Rehabilitation Package 10.
TR-ROW-0123-00229 Complete 01/10/2023 06/07/2023 BLDG 3 UNIT 3208 Right-of-Way (ROW) Air Vacuum Utility Potholing of various utilities with +/-12"x12" holes at 49 locations for the design phase of City of Tucson Road Recovery Proposition 101 Rehabilitation Package 10.
TR-ROW-0123-00229 Complete 01/10/2023 06/07/2023 BLDG 3 UNIT 3209 Right-of-Way (ROW) Air Vacuum Utility Potholing of various utilities with +/-12"x12" holes at 49 locations for the design phase of City of Tucson Road Recovery Proposition 101 Rehabilitation Package 10.
TR-ROW-0123-00229 Complete 01/10/2023 06/07/2023 BLDG 3 UNIT 3210 Right-of-Way (ROW) Air Vacuum Utility Potholing of various utilities with +/-12"x12" holes at 49 locations for the design phase of City of Tucson Road Recovery Proposition 101 Rehabilitation Package 10.
TR-ROW-0123-00229 Complete 01/10/2023 06/07/2023 BLDG 3 UNIT 3211 Right-of-Way (ROW) Air Vacuum Utility Potholing of various utilities with +/-12"x12" holes at 49 locations for the design phase of City of Tucson Road Recovery Proposition 101 Rehabilitation Package 10.
TR-ROW-0123-00229 Complete 01/10/2023 06/07/2023 BLDG 3 UNIT 3212 Right-of-Way (ROW) Air Vacuum Utility Potholing of various utilities with +/-12"x12" holes at 49 locations for the design phase of City of Tucson Road Recovery Proposition 101 Rehabilitation Package 10.
TR-ROW-0123-00229 Complete 01/10/2023 06/07/2023 BLDG 3 UNIT 3213 Right-of-Way (ROW) Air Vacuum Utility Potholing of various utilities with +/-12"x12" holes at 49 locations for the design phase of City of Tucson Road Recovery Proposition 101 Rehabilitation Package 10.
TR-ROW-0123-00229 Complete 01/10/2023 06/07/2023 BLDG 3 UNIT 3214 Right-of-Way (ROW) Air Vacuum Utility Potholing of various utilities with +/-12"x12" holes at 49 locations for the design phase of City of Tucson Road Recovery Proposition 101 Rehabilitation Package 10.
TR-ROW-0123-00229 Complete 01/10/2023 06/07/2023 BLDG 3 UNIT 3215 Right-of-Way (ROW) Air Vacuum Utility Potholing of various utilities with +/-12"x12" holes at 49 locations for the design phase of City of Tucson Road Recovery Proposition 101 Rehabilitation Package 10.
TR-ROW-0123-00229 Complete 01/10/2023 06/07/2023 BLDG 3 UNIT 3216 Right-of-Way (ROW) Air Vacuum Utility Potholing of various utilities with +/-12"x12" holes at 49 locations for the design phase of City of Tucson Road Recovery Proposition 101 Rehabilitation Package 10.
TR-ROW-0123-00229 Complete 01/10/2023 06/07/2023 BLDG 3 UNIT 3217 Right-of-Way (ROW) Air Vacuum Utility Potholing of various utilities with +/-12"x12" holes at 49 locations for the design phase of City of Tucson Road Recovery Proposition 101 Rehabilitation Package 10.
TR-ROW-0123-00229 Complete 01/10/2023 06/07/2023 BLDG 3 UNIT 3218 Right-of-Way (ROW) Air Vacuum Utility Potholing of various utilities with +/-12"x12" holes at 49 locations for the design phase of City of Tucson Road Recovery Proposition 101 Rehabilitation Package 10.
TR-ROW-0123-00229 Complete 01/10/2023 06/07/2023 BLDG 3 UNIT 3219 Right-of-Way (ROW) Air Vacuum Utility Potholing of various utilities with +/-12"x12" holes at 49 locations for the design phase of City of Tucson Road Recovery Proposition 101 Rehabilitation Package 10.
TR-ROW-0123-00229 Complete 01/10/2023 06/07/2023 BLDG 3 UNIT 3220 Right-of-Way (ROW) Air Vacuum Utility Potholing of various utilities with +/-12"x12" holes at 49 locations for the design phase of City of Tucson Road Recovery Proposition 101 Rehabilitation Package 10.
TR-ROW-0123-00229 Complete 01/10/2023 06/07/2023 BLDG 3 UNIT 3221 Right-of-Way (ROW) Air Vacuum Utility Potholing of various utilities with +/-12"x12" holes at 49 locations for the design phase of City of Tucson Road Recovery Proposition 101 Rehabilitation Package 10.
TR-ROW-0123-00229 Complete 01/10/2023 06/07/2023 BLDG 3 UNIT 3222 Right-of-Way (ROW) Air Vacuum Utility Potholing of various utilities with +/-12"x12" holes at 49 locations for the design phase of City of Tucson Road Recovery Proposition 101 Rehabilitation Package 10.
TR-ROW-0123-00229 Complete 01/10/2023 06/07/2023 BLDG 3 UNIT 3223 Right-of-Way (ROW) Air Vacuum Utility Potholing of various utilities with +/-12"x12" holes at 49 locations for the design phase of City of Tucson Road Recovery Proposition 101 Rehabilitation Package 10.
TR-ROW-0123-00229 Complete 01/10/2023 06/07/2023 BLDG 3 UNIT 3224 Right-of-Way (ROW) Air Vacuum Utility Potholing of various utilities with +/-12"x12" holes at 49 locations for the design phase of City of Tucson Road Recovery Proposition 101 Rehabilitation Package 10.
TR-ROW-0123-00229 Complete 01/10/2023 06/07/2023 BLDG 3 UNIT 3225 Right-of-Way (ROW) Air Vacuum Utility Potholing of various utilities with +/-12"x12" holes at 49 locations for the design phase of City of Tucson Road Recovery Proposition 101 Rehabilitation Package 10.
TR-ROW-0123-00229 Complete 01/10/2023 06/07/2023 BLDG 3 UNIT 3226 Right-of-Way (ROW) Air Vacuum Utility Potholing of various utilities with +/-12"x12" holes at 49 locations for the design phase of City of Tucson Road Recovery Proposition 101 Rehabilitation Package 10.
TR-ROW-0123-00229 Complete 01/10/2023 06/07/2023 BLDG 3 UNIT 3227 Right-of-Way (ROW) Air Vacuum Utility Potholing of various utilities with +/-12"x12" holes at 49 locations for the design phase of City of Tucson Road Recovery Proposition 101 Rehabilitation Package 10.
TR-ROW-0123-00229 Complete 01/10/2023 06/07/2023 BLDG 3 UNIT 3228 Right-of-Way (ROW) Air Vacuum Utility Potholing of various utilities with +/-12"x12" holes at 49 locations for the design phase of City of Tucson Road Recovery Proposition 101 Rehabilitation Package 10.
TR-ROW-0123-00229 Complete 01/10/2023 06/07/2023 BLDG 3 UNIT 3229 Right-of-Way (ROW) Air Vacuum Utility Potholing of various utilities with +/-12"x12" holes at 49 locations for the design phase of City of Tucson Road Recovery Proposition 101 Rehabilitation Package 10.
TR-ROW-0123-00229 Complete 01/10/2023 06/07/2023 BLDG 3 UNIT 3230 Right-of-Way (ROW) Air Vacuum Utility Potholing of various utilities with +/-12"x12" holes at 49 locations for the design phase of City of Tucson Road Recovery Proposition 101 Rehabilitation Package 10.
TR-ROW-0123-00229 Complete 01/10/2023 06/07/2023 BLDG 3 UNIT 3231 Right-of-Way (ROW) Air Vacuum Utility Potholing of various utilities with +/-12"x12" holes at 49 locations for the design phase of City of Tucson Road Recovery Proposition 101 Rehabilitation Package 10.
TR-ROW-0123-00229 Complete 01/10/2023 06/07/2023 BLDG 3 UNIT 3301 Right-of-Way (ROW) Air Vacuum Utility Potholing of various utilities with +/-12"x12" holes at 49 locations for the design phase of City of Tucson Road Recovery Proposition 101 Rehabilitation Package 10.
TR-ROW-0123-00229 Complete 01/10/2023 06/07/2023 BLDG 3 UNIT 3302 Right-of-Way (ROW) Air Vacuum Utility Potholing of various utilities with +/-12"x12" holes at 49 locations for the design phase of City of Tucson Road Recovery Proposition 101 Rehabilitation Package 10.
TR-ROW-0123-00229 Complete 01/10/2023 06/07/2023 BLDG 3 UNIT 3303 Right-of-Way (ROW) Air Vacuum Utility Potholing of various utilities with +/-12"x12" holes at 49 locations for the design phase of City of Tucson Road Recovery Proposition 101 Rehabilitation Package 10.
TR-ROW-0123-00229 Complete 01/10/2023 06/07/2023 BLDG 3 UNIT 3304 Right-of-Way (ROW) Air Vacuum Utility Potholing of various utilities with +/-12"x12" holes at 49 locations for the design phase of City of Tucson Road Recovery Proposition 101 Rehabilitation Package 10.
TR-ROW-0123-00229 Complete 01/10/2023 06/07/2023 BLDG 3 UNIT 3305 Right-of-Way (ROW) Air Vacuum Utility Potholing of various utilities with +/-12"x12" holes at 49 locations for the design phase of City of Tucson Road Recovery Proposition 101 Rehabilitation Package 10.
TR-ROW-0123-00229 Complete 01/10/2023 06/07/2023 BLDG 3 UNIT 3306 Right-of-Way (ROW) Air Vacuum Utility Potholing of various utilities with +/-12"x12" holes at 49 locations for the design phase of City of Tucson Road Recovery Proposition 101 Rehabilitation Package 10.
TR-ROW-0123-00229 Complete 01/10/2023 06/07/2023 BLDG 3 UNIT 3307 Right-of-Way (ROW) Air Vacuum Utility Potholing of various utilities with +/-12"x12" holes at 49 locations for the design phase of City of Tucson Road Recovery Proposition 101 Rehabilitation Package 10.
TR-ROW-0123-00229 Complete 01/10/2023 06/07/2023 BLDG 3 UNIT 3308 Right-of-Way (ROW) Air Vacuum Utility Potholing of various utilities with +/-12"x12" holes at 49 locations for the design phase of City of Tucson Road Recovery Proposition 101 Rehabilitation Package 10.
TR-ROW-0123-00229 Complete 01/10/2023 06/07/2023 BLDG 3 UNIT 3309 Right-of-Way (ROW) Air Vacuum Utility Potholing of various utilities with +/-12"x12" holes at 49 locations for the design phase of City of Tucson Road Recovery Proposition 101 Rehabilitation Package 10.
TR-ROW-0123-00229 Complete 01/10/2023 06/07/2023 BLDG 3 UNIT 3310 Right-of-Way (ROW) Air Vacuum Utility Potholing of various utilities with +/-12"x12" holes at 49 locations for the design phase of City of Tucson Road Recovery Proposition 101 Rehabilitation Package 10.
TR-ROW-0123-00229 Complete 01/10/2023 06/07/2023 BLDG 3 UNIT 3311 Right-of-Way (ROW) Air Vacuum Utility Potholing of various utilities with +/-12"x12" holes at 49 locations for the design phase of City of Tucson Road Recovery Proposition 101 Rehabilitation Package 10.
TR-ROW-0123-00229 Complete 01/10/2023 06/07/2023 BLDG 3 UNIT 3312 Right-of-Way (ROW) Air Vacuum Utility Potholing of various utilities with +/-12"x12" holes at 49 locations for the design phase of City of Tucson Road Recovery Proposition 101 Rehabilitation Package 10.
TR-ROW-0123-00229 Complete 01/10/2023 06/07/2023 BLDG 3 UNIT 3313 Right-of-Way (ROW) Air Vacuum Utility Potholing of various utilities with +/-12"x12" holes at 49 locations for the design phase of City of Tucson Road Recovery Proposition 101 Rehabilitation Package 10.
TR-ROW-0123-00229 Complete 01/10/2023 06/07/2023 BLDG 3 UNIT 3314 Right-of-Way (ROW) Air Vacuum Utility Potholing of various utilities with +/-12"x12" holes at 49 locations for the design phase of City of Tucson Road Recovery Proposition 101 Rehabilitation Package 10.
TR-ROW-0123-00229 Complete 01/10/2023 06/07/2023 BLDG 3 UNIT 3315 Right-of-Way (ROW) Air Vacuum Utility Potholing of various utilities with +/-12"x12" holes at 49 locations for the design phase of City of Tucson Road Recovery Proposition 101 Rehabilitation Package 10.
TR-ROW-0123-00229 Complete 01/10/2023 06/07/2023 BLDG 3 UNIT 3316 Right-of-Way (ROW) Air Vacuum Utility Potholing of various utilities with +/-12"x12" holes at 49 locations for the design phase of City of Tucson Road Recovery Proposition 101 Rehabilitation Package 10.
TR-ROW-0123-00229 Complete 01/10/2023 06/07/2023 BLDG 3 UNIT 3317 Right-of-Way (ROW) Air Vacuum Utility Potholing of various utilities with +/-12"x12" holes at 49 locations for the design phase of City of Tucson Road Recovery Proposition 101 Rehabilitation Package 10.
TR-ROW-0123-00229 Complete 01/10/2023 06/07/2023 BLDG 3 UNIT 3318 Right-of-Way (ROW) Air Vacuum Utility Potholing of various utilities with +/-12"x12" holes at 49 locations for the design phase of City of Tucson Road Recovery Proposition 101 Rehabilitation Package 10.
TR-ROW-0123-00229 Complete 01/10/2023 06/07/2023 BLDG 3 UNIT 3319 Right-of-Way (ROW) Air Vacuum Utility Potholing of various utilities with +/-12"x12" holes at 49 locations for the design phase of City of Tucson Road Recovery Proposition 101 Rehabilitation Package 10.
TR-ROW-0123-00229 Complete 01/10/2023 06/07/2023 BLDG 3 UNIT 3320 Right-of-Way (ROW) Air Vacuum Utility Potholing of various utilities with +/-12"x12" holes at 49 locations for the design phase of City of Tucson Road Recovery Proposition 101 Rehabilitation Package 10.
TR-ROW-0123-00229 Complete 01/10/2023 06/07/2023 BLDG 3 UNIT 3321 Right-of-Way (ROW) Air Vacuum Utility Potholing of various utilities with +/-12"x12" holes at 49 locations for the design phase of City of Tucson Road Recovery Proposition 101 Rehabilitation Package 10.
TR-ROW-0123-00229 Complete 01/10/2023 06/07/2023 BLDG 3 UNIT 3322 Right-of-Way (ROW) Air Vacuum Utility Potholing of various utilities with +/-12"x12" holes at 49 locations for the design phase of City of Tucson Road Recovery Proposition 101 Rehabilitation Package 10.
TR-ROW-0123-00229 Complete 01/10/2023 06/07/2023 BLDG 3 UNIT 3323 Right-of-Way (ROW) Air Vacuum Utility Potholing of various utilities with +/-12"x12" holes at 49 locations for the design phase of City of Tucson Road Recovery Proposition 101 Rehabilitation Package 10.
TR-ROW-0123-00229 Complete 01/10/2023 06/07/2023 BLDG 3 UNIT 3324 Right-of-Way (ROW) Air Vacuum Utility Potholing of various utilities with +/-12"x12" holes at 49 locations for the design phase of City of Tucson Road Recovery Proposition 101 Rehabilitation Package 10.
TR-ROW-0123-00229 Complete 01/10/2023 06/07/2023 BLDG 3 UNIT 3325 Right-of-Way (ROW) Air Vacuum Utility Potholing of various utilities with +/-12"x12" holes at 49 locations for the design phase of City of Tucson Road Recovery Proposition 101 Rehabilitation Package 10.
TR-ROW-0123-00229 Complete 01/10/2023 06/07/2023 BLDG 3 UNIT 3326 Right-of-Way (ROW) Air Vacuum Utility Potholing of various utilities with +/-12"x12" holes at 49 locations for the design phase of City of Tucson Road Recovery Proposition 101 Rehabilitation Package 10.
TR-ROW-0123-00229 Complete 01/10/2023 06/07/2023 BLDG 3 UNIT 3327 Right-of-Way (ROW) Air Vacuum Utility Potholing of various utilities with +/-12"x12" holes at 49 locations for the design phase of City of Tucson Road Recovery Proposition 101 Rehabilitation Package 10.
TR-ROW-0123-00229 Complete 01/10/2023 06/07/2023 BLDG 3 UNIT 3328 Right-of-Way (ROW) Air Vacuum Utility Potholing of various utilities with +/-12"x12" holes at 49 locations for the design phase of City of Tucson Road Recovery Proposition 101 Rehabilitation Package 10.
TR-ROW-0123-00229 Complete 01/10/2023 06/07/2023 BLDG 3 UNIT 3329 Right-of-Way (ROW) Air Vacuum Utility Potholing of various utilities with +/-12"x12" holes at 49 locations for the design phase of City of Tucson Road Recovery Proposition 101 Rehabilitation Package 10.
TR-ROW-0123-00229 Complete 01/10/2023 06/07/2023 BLDG 3 UNIT 3330 Right-of-Way (ROW) Air Vacuum Utility Potholing of various utilities with +/-12"x12" holes at 49 locations for the design phase of City of Tucson Road Recovery Proposition 101 Rehabilitation Package 10.
TR-ROW-0123-00229 Complete 01/10/2023 06/07/2023 BLDG 3 UNIT 3331 Right-of-Way (ROW) Air Vacuum Utility Potholing of various utilities with +/-12"x12" holes at 49 locations for the design phase of City of Tucson Road Recovery Proposition 101 Rehabilitation Package 10.
TR-ROW-0123-00229 Complete 01/10/2023 06/07/2023 BLDG 3 UNIT 3402 Right-of-Way (ROW) Air Vacuum Utility Potholing of various utilities with +/-12"x12" holes at 49 locations for the design phase of City of Tucson Road Recovery Proposition 101 Rehabilitation Package 10.
TR-ROW-0123-00229 Complete 01/10/2023 06/07/2023 BLDG 3 UNIT 3403 Right-of-Way (ROW) Air Vacuum Utility Potholing of various utilities with +/-12"x12" holes at 49 locations for the design phase of City of Tucson Road Recovery Proposition 101 Rehabilitation Package 10.
TR-ROW-0123-00229 Complete 01/10/2023 06/07/2023 BLDG 3 UNIT 3404 Right-of-Way (ROW) Air Vacuum Utility Potholing of various utilities with +/-12"x12" holes at 49 locations for the design phase of City of Tucson Road Recovery Proposition 101 Rehabilitation Package 10.
TR-ROW-0123-00229 Complete 01/10/2023 06/07/2023 BLDG 3 UNIT 3405 Right-of-Way (ROW) Air Vacuum Utility Potholing of various utilities with +/-12"x12" holes at 49 locations for the design phase of City of Tucson Road Recovery Proposition 101 Rehabilitation Package 10.
TR-ROW-0123-00229 Complete 01/10/2023 06/07/2023 BLDG 3 UNIT 3406 Right-of-Way (ROW) Air Vacuum Utility Potholing of various utilities with +/-12"x12" holes at 49 locations for the design phase of City of Tucson Road Recovery Proposition 101 Rehabilitation Package 10.
TR-ROW-0123-00229 Complete 01/10/2023 06/07/2023 BLDG 3 UNIT 3407 Right-of-Way (ROW) Air Vacuum Utility Potholing of various utilities with +/-12"x12" holes at 49 locations for the design phase of City of Tucson Road Recovery Proposition 101 Rehabilitation Package 10.
TR-ROW-0123-00229 Complete 01/10/2023 06/07/2023 BLDG 3 UNIT 3408 Right-of-Way (ROW) Air Vacuum Utility Potholing of various utilities with +/-12"x12" holes at 49 locations for the design phase of City of Tucson Road Recovery Proposition 101 Rehabilitation Package 10.
TR-ROW-0123-00229 Complete 01/10/2023 06/07/2023 BLDG 3 UNIT 3409 Right-of-Way (ROW) Air Vacuum Utility Potholing of various utilities with +/-12"x12" holes at 49 locations for the design phase of City of Tucson Road Recovery Proposition 101 Rehabilitation Package 10.
TR-ROW-0123-00229 Complete 01/10/2023 06/07/2023 BLDG 3 UNIT 3410 Right-of-Way (ROW) Air Vacuum Utility Potholing of various utilities with +/-12"x12" holes at 49 locations for the design phase of City of Tucson Road Recovery Proposition 101 Rehabilitation Package 10.
TR-ROW-0123-00229 Complete 01/10/2023 06/07/2023 BLDG 3 UNIT 3411 Right-of-Way (ROW) Air Vacuum Utility Potholing of various utilities with +/-12"x12" holes at 49 locations for the design phase of City of Tucson Road Recovery Proposition 101 Rehabilitation Package 10.
TR-ROW-0123-00229 Complete 01/10/2023 06/07/2023 BLDG 3 UNIT 3412 Right-of-Way (ROW) Air Vacuum Utility Potholing of various utilities with +/-12"x12" holes at 49 locations for the design phase of City of Tucson Road Recovery Proposition 101 Rehabilitation Package 10.
TR-ROW-0123-00229 Complete 01/10/2023 06/07/2023 BLDG 3 UNIT 3413 Right-of-Way (ROW) Air Vacuum Utility Potholing of various utilities with +/-12"x12" holes at 49 locations for the design phase of City of Tucson Road Recovery Proposition 101 Rehabilitation Package 10.
TR-ROW-0123-00229 Complete 01/10/2023 06/07/2023 BLDG 3 UNIT 3414 Right-of-Way (ROW) Air Vacuum Utility Potholing of various utilities with +/-12"x12" holes at 49 locations for the design phase of City of Tucson Road Recovery Proposition 101 Rehabilitation Package 10.
TR-ROW-0123-00229 Complete 01/10/2023 06/07/2023 BLDG 3 UNIT 3415 Right-of-Way (ROW) Air Vacuum Utility Potholing of various utilities with +/-12"x12" holes at 49 locations for the design phase of City of Tucson Road Recovery Proposition 101 Rehabilitation Package 10.
TR-ROW-0123-00229 Complete 01/10/2023 06/07/2023 BLDG 3 UNIT 3416 Right-of-Way (ROW) Air Vacuum Utility Potholing of various utilities with +/-12"x12" holes at 49 locations for the design phase of City of Tucson Road Recovery Proposition 101 Rehabilitation Package 10.
TR-ROW-0123-00229 Complete 01/10/2023 06/07/2023 BLDG 3 UNIT 3417 Right-of-Way (ROW) Air Vacuum Utility Potholing of various utilities with +/-12"x12" holes at 49 locations for the design phase of City of Tucson Road Recovery Proposition 101 Rehabilitation Package 10.
TR-ROW-0123-00229 Complete 01/10/2023 06/07/2023 BLDG 3 UNIT 3418 Right-of-Way (ROW) Air Vacuum Utility Potholing of various utilities with +/-12"x12" holes at 49 locations for the design phase of City of Tucson Road Recovery Proposition 101 Rehabilitation Package 10.
TR-ROW-0123-00229 Complete 01/10/2023 06/07/2023 BLDG 3 UNIT 3419 Right-of-Way (ROW) Air Vacuum Utility Potholing of various utilities with +/-12"x12" holes at 49 locations for the design phase of City of Tucson Road Recovery Proposition 101 Rehabilitation Package 10.
TR-ROW-0123-00229 Complete 01/10/2023 06/07/2023 BLDG 3 UNIT 3420 Right-of-Way (ROW) Air Vacuum Utility Potholing of various utilities with +/-12"x12" holes at 49 locations for the design phase of City of Tucson Road Recovery Proposition 101 Rehabilitation Package 10.
TR-ROW-0123-00229 Complete 01/10/2023 06/07/2023 BLDG 3 UNIT 3421 Right-of-Way (ROW) Air Vacuum Utility Potholing of various utilities with +/-12"x12" holes at 49 locations for the design phase of City of Tucson Road Recovery Proposition 101 Rehabilitation Package 10.
TR-ROW-0123-00229 Complete 01/10/2023 06/07/2023 BLDG 3 UNIT 3422 Right-of-Way (ROW) Air Vacuum Utility Potholing of various utilities with +/-12"x12" holes at 49 locations for the design phase of City of Tucson Road Recovery Proposition 101 Rehabilitation Package 10.
TR-ROW-0123-00229 Complete 01/10/2023 06/07/2023 BLDG 3 UNIT 3423 Right-of-Way (ROW) Air Vacuum Utility Potholing of various utilities with +/-12"x12" holes at 49 locations for the design phase of City of Tucson Road Recovery Proposition 101 Rehabilitation Package 10.
TR-ROW-0123-00229 Complete 01/10/2023 06/07/2023 BLDG 3 UNIT 3424 Right-of-Way (ROW) Air Vacuum Utility Potholing of various utilities with +/-12"x12" holes at 49 locations for the design phase of City of Tucson Road Recovery Proposition 101 Rehabilitation Package 10.
TR-ROW-0123-00229 Complete 01/10/2023 06/07/2023 BLDG 3 UNIT 3425 Right-of-Way (ROW) Air Vacuum Utility Potholing of various utilities with +/-12"x12" holes at 49 locations for the design phase of City of Tucson Road Recovery Proposition 101 Rehabilitation Package 10.
TR-ROW-0123-00229 Complete 01/10/2023 06/07/2023 BLDG 3 UNIT 3426 Right-of-Way (ROW) Air Vacuum Utility Potholing of various utilities with +/-12"x12" holes at 49 locations for the design phase of City of Tucson Road Recovery Proposition 101 Rehabilitation Package 10.
TR-ROW-0123-00229 Complete 01/10/2023 06/07/2023 BLDG 3 UNIT 3427 Right-of-Way (ROW) Air Vacuum Utility Potholing of various utilities with +/-12"x12" holes at 49 locations for the design phase of City of Tucson Road Recovery Proposition 101 Rehabilitation Package 10.
TR-ROW-0123-00229 Complete 01/10/2023 06/07/2023 BLDG 4 Right-of-Way (ROW) Air Vacuum Utility Potholing of various utilities with +/-12"x12" holes at 49 locations for the design phase of City of Tucson Road Recovery Proposition 101 Rehabilitation Package 10.
TR-ROW-0123-00229 Complete 01/10/2023 06/07/2023 BLDG 4 UNIT 4101 Right-of-Way (ROW) Air Vacuum Utility Potholing of various utilities with +/-12"x12" holes at 49 locations for the design phase of City of Tucson Road Recovery Proposition 101 Rehabilitation Package 10.
TR-ROW-0123-00229 Complete 01/10/2023 06/07/2023 BLDG 4 UNIT 4102 Right-of-Way (ROW) Air Vacuum Utility Potholing of various utilities with +/-12"x12" holes at 49 locations for the design phase of City of Tucson Road Recovery Proposition 101 Rehabilitation Package 10.
TR-ROW-0123-00229 Complete 01/10/2023 06/07/2023 BLDG 4 UNIT 4201 Right-of-Way (ROW) Air Vacuum Utility Potholing of various utilities with +/-12"x12" holes at 49 locations for the design phase of City of Tucson Road Recovery Proposition 101 Rehabilitation Package 10.
TR-ROW-0123-00229 Complete 01/10/2023 06/07/2023 BLDG 4 UNIT 4202 Right-of-Way (ROW) Air Vacuum Utility Potholing of various utilities with +/-12"x12" holes at 49 locations for the design phase of City of Tucson Road Recovery Proposition 101 Rehabilitation Package 10.
TR-ROW-0123-00229 Complete 01/10/2023 06/07/2023 BLDG 4 UNIT 4301 Right-of-Way (ROW) Air Vacuum Utility Potholing of various utilities with +/-12"x12" holes at 49 locations for the design phase of City of Tucson Road Recovery Proposition 101 Rehabilitation Package 10.
TR-ROW-0123-00229 Complete 01/10/2023 06/07/2023 BLDG 4 UNIT 4302 Right-of-Way (ROW) Air Vacuum Utility Potholing of various utilities with +/-12"x12" holes at 49 locations for the design phase of City of Tucson Road Recovery Proposition 101 Rehabilitation Package 10.
TR-ROW-0123-00229 Complete 01/10/2023 06/07/2023 BLDG 5 Right-of-Way (ROW) Air Vacuum Utility Potholing of various utilities with +/-12"x12" holes at 49 locations for the design phase of City of Tucson Road Recovery Proposition 101 Rehabilitation Package 10.
TR-ROW-0123-00229 Complete 01/10/2023 06/07/2023 BLDG 5 UNIT 5101 Right-of-Way (ROW) Air Vacuum Utility Potholing of various utilities with +/-12"x12" holes at 49 locations for the design phase of City of Tucson Road Recovery Proposition 101 Rehabilitation Package 10.
TR-ROW-0123-00229 Complete 01/10/2023 06/07/2023 BLDG 5 UNIT 5102 Right-of-Way (ROW) Air Vacuum Utility Potholing of various utilities with +/-12"x12" holes at 49 locations for the design phase of City of Tucson Road Recovery Proposition 101 Rehabilitation Package 10.
TR-ROW-0123-00229 Complete 01/10/2023 06/07/2023 BLDG 5 UNIT 5103 Right-of-Way (ROW) Air Vacuum Utility Potholing of various utilities with +/-12"x12" holes at 49 locations for the design phase of City of Tucson Road Recovery Proposition 101 Rehabilitation Package 10.
TR-ROW-0123-00229 Complete 01/10/2023 06/07/2023 BLDG 5 UNIT 5104 Right-of-Way (ROW) Air Vacuum Utility Potholing of various utilities with +/-12"x12" holes at 49 locations for the design phase of City of Tucson Road Recovery Proposition 101 Rehabilitation Package 10.
TR-ROW-0123-00229 Complete 01/10/2023 06/07/2023 BLDG 5 UNIT 5105 Right-of-Way (ROW) Air Vacuum Utility Potholing of various utilities with +/-12"x12" holes at 49 locations for the design phase of City of Tucson Road Recovery Proposition 101 Rehabilitation Package 10.
TR-ROW-0123-00229 Complete 01/10/2023 06/07/2023 BLDG 5 UNIT 5106 Right-of-Way (ROW) Air Vacuum Utility Potholing of various utilities with +/-12"x12" holes at 49 locations for the design phase of City of Tucson Road Recovery Proposition 101 Rehabilitation Package 10.
TR-ROW-0123-00229 Complete 01/10/2023 06/07/2023 BLDG 5 UNIT 5107 Right-of-Way (ROW) Air Vacuum Utility Potholing of various utilities with +/-12"x12" holes at 49 locations for the design phase of City of Tucson Road Recovery Proposition 101 Rehabilitation Package 10.
TR-ROW-0123-00229 Complete 01/10/2023 06/07/2023 BLDG 5 UNIT 5108 Right-of-Way (ROW) Air Vacuum Utility Potholing of various utilities with +/-12"x12" holes at 49 locations for the design phase of City of Tucson Road Recovery Proposition 101 Rehabilitation Package 10.
TR-ROW-0123-00229 Complete 01/10/2023 06/07/2023 BLDG 5 UNIT 5109 Right-of-Way (ROW) Air Vacuum Utility Potholing of various utilities with +/-12"x12" holes at 49 locations for the design phase of City of Tucson Road Recovery Proposition 101 Rehabilitation Package 10.
TR-ROW-0123-00229 Complete 01/10/2023 06/07/2023 BLDG 5 UNIT 5110 Right-of-Way (ROW) Air Vacuum Utility Potholing of various utilities with +/-12"x12" holes at 49 locations for the design phase of City of Tucson Road Recovery Proposition 101 Rehabilitation Package 10.
TR-ROW-0123-00229 Complete 01/10/2023 06/07/2023 BLDG 5 UNIT 5201 Right-of-Way (ROW) Air Vacuum Utility Potholing of various utilities with +/-12"x12" holes at 49 locations for the design phase of City of Tucson Road Recovery Proposition 101 Rehabilitation Package 10.
TR-ROW-0123-00229 Complete 01/10/2023 06/07/2023 BLDG 5 UNIT 5202 Right-of-Way (ROW) Air Vacuum Utility Potholing of various utilities with +/-12"x12" holes at 49 locations for the design phase of City of Tucson Road Recovery Proposition 101 Rehabilitation Package 10.
TR-ROW-0123-00229 Complete 01/10/2023 06/07/2023 BLDG 5 UNIT 5203 Right-of-Way (ROW) Air Vacuum Utility Potholing of various utilities with +/-12"x12" holes at 49 locations for the design phase of City of Tucson Road Recovery Proposition 101 Rehabilitation Package 10.
TR-ROW-0123-00229 Complete 01/10/2023 06/07/2023 BLDG 5 UNIT 5204 Right-of-Way (ROW) Air Vacuum Utility Potholing of various utilities with +/-12"x12" holes at 49 locations for the design phase of City of Tucson Road Recovery Proposition 101 Rehabilitation Package 10.
TR-ROW-0123-00229 Complete 01/10/2023 06/07/2023 BLDG 5 UNIT 5205 Right-of-Way (ROW) Air Vacuum Utility Potholing of various utilities with +/-12"x12" holes at 49 locations for the design phase of City of Tucson Road Recovery Proposition 101 Rehabilitation Package 10.
TR-ROW-0123-00229 Complete 01/10/2023 06/07/2023 BLDG 5 UNIT 5206 Right-of-Way (ROW) Air Vacuum Utility Potholing of various utilities with +/-12"x12" holes at 49 locations for the design phase of City of Tucson Road Recovery Proposition 101 Rehabilitation Package 10.
TR-ROW-0123-00229 Complete 01/10/2023 06/07/2023 BLDG 5 UNIT 5207 Right-of-Way (ROW) Air Vacuum Utility Potholing of various utilities with +/-12"x12" holes at 49 locations for the design phase of City of Tucson Road Recovery Proposition 101 Rehabilitation Package 10.
TR-ROW-0123-00229 Complete 01/10/2023 06/07/2023 BLDG 5 UNIT 5208 Right-of-Way (ROW) Air Vacuum Utility Potholing of various utilities with +/-12"x12" holes at 49 locations for the design phase of City of Tucson Road Recovery Proposition 101 Rehabilitation Package 10.
TR-ROW-0123-00229 Complete 01/10/2023 06/07/2023 BLDG 5 UNIT 5209 Right-of-Way (ROW) Air Vacuum Utility Potholing of various utilities with +/-12"x12" holes at 49 locations for the design phase of City of Tucson Road Recovery Proposition 101 Rehabilitation Package 10.
TR-ROW-0123-00229 Complete 01/10/2023 06/07/2023 BLDG 5 UNIT 5210 Right-of-Way (ROW) Air Vacuum Utility Potholing of various utilities with +/-12"x12" holes at 49 locations for the design phase of City of Tucson Road Recovery Proposition 101 Rehabilitation Package 10.
TR-ROW-0123-00229 Complete 01/10/2023 06/07/2023 BLDG 5 UNIT 5301 Right-of-Way (ROW) Air Vacuum Utility Potholing of various utilities with +/-12"x12" holes at 49 locations for the design phase of City of Tucson Road Recovery Proposition 101 Rehabilitation Package 10.
TR-ROW-0123-00229 Complete 01/10/2023 06/07/2023 BLDG 5 UNIT 5302 Right-of-Way (ROW) Air Vacuum Utility Potholing of various utilities with +/-12"x12" holes at 49 locations for the design phase of City of Tucson Road Recovery Proposition 101 Rehabilitation Package 10.
TR-ROW-0123-00229 Complete 01/10/2023 06/07/2023 BLDG 5 UNIT 5303 Right-of-Way (ROW) Air Vacuum Utility Potholing of various utilities with +/-12"x12" holes at 49 locations for the design phase of City of Tucson Road Recovery Proposition 101 Rehabilitation Package 10.
TR-ROW-0123-00229 Complete 01/10/2023 06/07/2023 BLDG 5 UNIT 5304 Right-of-Way (ROW) Air Vacuum Utility Potholing of various utilities with +/-12"x12" holes at 49 locations for the design phase of City of Tucson Road Recovery Proposition 101 Rehabilitation Package 10.
TR-ROW-0123-00229 Complete 01/10/2023 06/07/2023 BLDG 5 UNIT 5305 Right-of-Way (ROW) Air Vacuum Utility Potholing of various utilities with +/-12"x12" holes at 49 locations for the design phase of City of Tucson Road Recovery Proposition 101 Rehabilitation Package 10.
TR-ROW-0123-00229 Complete 01/10/2023 06/07/2023 BLDG 5 UNIT 5306 Right-of-Way (ROW) Air Vacuum Utility Potholing of various utilities with +/-12"x12" holes at 49 locations for the design phase of City of Tucson Road Recovery Proposition 101 Rehabilitation Package 10.
TR-ROW-0123-00229 Complete 01/10/2023 06/07/2023 BLDG 5 UNIT 5307 Right-of-Way (ROW) Air Vacuum Utility Potholing of various utilities with +/-12"x12" holes at 49 locations for the design phase of City of Tucson Road Recovery Proposition 101 Rehabilitation Package 10.
TR-ROW-0123-00229 Complete 01/10/2023 06/07/2023 BLDG 5 UNIT 5308 Right-of-Way (ROW) Air Vacuum Utility Potholing of various utilities with +/-12"x12" holes at 49 locations for the design phase of City of Tucson Road Recovery Proposition 101 Rehabilitation Package 10.
TR-ROW-0123-00229 Complete 01/10/2023 06/07/2023 BLDG 5 UNIT 5309 Right-of-Way (ROW) Air Vacuum Utility Potholing of various utilities with +/-12"x12" holes at 49 locations for the design phase of City of Tucson Road Recovery Proposition 101 Rehabilitation Package 10.
TR-ROW-0123-00229 Complete 01/10/2023 06/07/2023 BLDG 5 UNIT 5310 Right-of-Way (ROW) Air Vacuum Utility Potholing of various utilities with +/-12"x12" holes at 49 locations for the design phase of City of Tucson Road Recovery Proposition 101 Rehabilitation Package 10.
TR-ROW-0123-00229 Complete 01/10/2023 06/07/2023 UNIT 151 Right-of-Way (ROW) Air Vacuum Utility Potholing of various utilities with +/-12"x12" holes at 49 locations for the design phase of City of Tucson Road Recovery Proposition 101 Rehabilitation Package 10.
TR-ROW-0123-00229 Complete 01/10/2023 06/07/2023 UNIT 415 Right-of-Way (ROW) Air Vacuum Utility Potholing of various utilities with +/-12"x12" holes at 49 locations for the design phase of City of Tucson Road Recovery Proposition 101 Rehabilitation Package 10.
TC-COM-0123-00555 Expired 01/30/2023 07/29/2023 BLDG 1 UNIT 1103 Commercial Building Opening a shaved iced dessert location in an existing restaurant. Alterations to include new paint, new furniture, counter modification, and placement of a condensing unit.
TS-PRM-0323-00241 Expired 03/16/2023 09/12/2023 Sign - Permanent Non-illuminated Aluminum Sign - Mounted to building wall
T20OT00547 Expired 07/17/2020 12/10/2022 Sign - Permanent REQUEST TO INSTALL 2 WALL SIGNS & 1 UNIDENTIFIED SIGN ON A FENCE - TOTAL WALL SIGN AREA AT 352.5 SQ.
T22CM06967 Complete 09/12/2022 07/09/2024 Commercial Building exterior lighting upgrade
T20CM08741 Expired 12/15/2020 N/A Commercial Building (T20DV06540) Replace (99) Exterior Wall lights with the same fixture, with LED Lights. The new fixt
C10-03-36 Closed 03/11/2009 N/A LUCAPHST ZA Interpretation and Determination Upheld
C10-03-41 Closed 03/11/2009 N/A LUCAPHST ZA Determination regarding parking fees: Upheld
T04BU02185 Final 09/02/2004 10/25/2005 01 BLDG BUILD FIRE ALARM SYSTEM
T04BU02186 Final 09/02/2004 10/25/2005 02 BLDG BUILD FIRE ALARM SYSTEM
T04BU02602 Final 10/25/2004 06/15/2009 01 BLDG BUILD FIRE SPKR:ALARM SYSTEM
T04BU02714 Final 11/04/2004 10/25/2005 01 BLDG SPKLR FIRE SPKR:ADD 166
T05AN00924 Issued 08/26/2005 N/A 01 BLDG ADDRNEW
T05BU01245 Final 05/20/2005 11/30/2005 01 BLDG SPKLR FIRE SPKR: RELOCATE 23 ADD 3
T05CM01624 C of o 04/13/2005 02/21/2006 01 BLDG COMBO TI: RETAIL
T05EX00044 Closed 01/06/2005 03/07/2005 EXCAV CURB REPLACEMENT @ DRIVEWAY
T05EX00263 Closed 03/07/2005 05/06/2005 EXCAV EXCA:CURB REPLACE AT 5 DRIVEWAY LOCATIONS
T05EX00288 Closed 03/14/2005 05/13/2005 EXCAV INSTALL MAG SCUPPERS
T05OT00982 Final 04/21/2005 01/21/2006 01 BLDG SIGN SIGN:# 8876 COLLAGE BOUTIQUE
T05OT00983 Final 04/21/2005 12/27/2008 01 BLDG SIGN SIGN:# 8877 SAHARA APARTMENTS
T05OT03228 Closed 12/29/2005 12/04/2007 SIGN 10344
T08CM03971 Expired 12/23/2008 09/02/2009 01 BLDG COMBO RELOCATE 2 ELECTRIC RECEPTICLES, DEMO A NON-BEARING WALL C OF O
T08CM03972 Expired 12/23/2008 09/02/2009 01 BLDG COMBO TI: RETAIL FOR C OF O
T09OT00299 Final 02/12/2009 09/27/2009 01 BLDG SIGN 16297
T09OT00300 Final 02/12/2009 09/02/2009 01 BLDG SIGN 16295
T09OT00302 Final 02/12/2009 09/02/2009 01 BLDG SIGN 16296
T09OT00369 Closed 02/24/2009 03/18/2009 01 BLDG SIGN 0 E
T09OT00542 Final 03/17/2009 10/24/2009 01 BLDG SIGN 16424
T09OT01079 Final 05/28/2009 02/22/2010 01 BLDG SIGN 16737
T09OT01080 Final 05/28/2009 01/09/2010 01 BLDG SIGN 16736
T09OT01081 Closed 05/28/2009 08/26/2009 01 BLDG SIGN 16735
T09OT01706 Final 08/17/2009 02/22/2010 01 BLDG SIGN 17057
T09OT01707 Final 08/17/2009 02/22/2010 01 BLDG SIGN 17056
T09OT02085 Closed 09/30/2009 04/12/2010 01 BLDG SIGN 17267
T09OT02133 Closed 10/06/2009 05/29/2010 01 BLDG SIGN 17299
T13BU01123 Final 10/08/2013 06/25/2014 SPKLR ADD 16 FIRE SPRINKLERS
T19RW03368 Final 06/13/2019 08/13/2019 ROW ACCESS MH #4912 TO SPLICE FIBER
T20CM05534 C of o 08/26/2020 04/16/2023 COMBO RESTAURANT
T20FC00784 Final 11/17/2020 11/29/2021 FIRECONS Install New Fire System for Kitchen Hood.

Code Enforcement

Parcel Number - 11702191G
Date - 12/25/2024 7:33 p.m.
Total Number Of Code Cases - 11
Case Number Case Status Entered Date Closed Date Unit Type Description
CE-VIO1023-06214 Closed - resolved 10/25/2023 01/23/2024 Code Enforcement Case PMMULT / Overgrown low hanging Palo Verde along W 1st St Overhanging limbs into streets, sidewalks, or medians
T22DV03059 Closed - resolved 05/20/2022 02/06/2024 Code Enforcement Case OUTOOR LIGHT VIOLATION
T05VL00085 Complian 01/24/2005 N/A CODEVIOL COMPLAINT: CWOP - SPRAY BOOTH INSTALLED AND BEING USED W/O PERMITS
T05ZV00598 Complian 11/01/2005 N/A ZONINGVL DENIED BUSINESS LICENSE-NO C OF O ISSUED
T09DV02077 Complian 04/20/2009 N/A DNR_VIOL R & R Pizza in space #1104. 2 banners on a pole sign (can not be permitted) and an oversized A-Frame on the sidewalk.
T09FR00743 Field 02/24/2009 N/A FIREINSP SPRINKLER INSPECTION
T13DV07414 Noverify 10/02/2013 N/A DNR_VIOL Homless camp on the west side of the propert near the garbage bins at Sahara Apartments. TPD contatced as well. Trash may have been left behind.
T16DV06040 Complian 09/20/2016 N/A DNR_VIOL PROPERTY, FLOODING, NORTH SIDE OF PROPERTY MALFUNCTION IRRIGATION SYSTEM WEEDS GROWING NORTH, WEST AND SOUTHSIDE EASTMENTS OF THIS PROPERTY, TRASH AND REFUSE THROUGHOUT ENTIRE PROPERTY TREE BRANCHES ENCROACHING ROW ON WEST AND NORTHSIDES OF THIS PROPERTY
T20DV06540 Complian 09/29/2020 12/27/2021 DNR_VIOL Extreme light pollution shining into our and neighbors homes since new management has started(they replaced orange bulbs with very bright daylight less and do not have deflector shields up).
T20DV06603 Referred 09/30/2020 N/A DNR_VIOL Exterior lighting code violation - too bright, wrong color
T22DV03072 Void 05/20/2022 N/A DNR_VIOL OUTDOOR LIGHTING VIOLATION