Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Parcel Search: 11006013F
Parcel Search
Rezoning Cases
Date - 11/08/2024 8:41 p.m.
Total Number Of Rezone Cases - (1)
Case No. | Description | New Zone | Status | Status Date | Address |
---|---|---|---|---|---|
C9-18-05 | Fort Lowell Park-Ft. Lowell Rd | C-2 | Effectuated | 02/26/2018 | E FORT LOWELL |
Special Development Requests & Requirements
Date - 11/08/2024 8:41 p.m.
Total Number Of Special Development Permits - (1)
Activity Number | Status | Apply Date | Expired Date | Type | Description |
---|---|---|---|---|---|
T22SA00212 | Complete | N/A | Zoning Compliance Letter - proposed Self Storage Facility |
Permits
Parcel Number - 11006013F
Date - 11/08/2024 8:41 p.m.
Total Number Of Permits - (25)
Permit | Permit Status | Entered Date | Expired Date | Unit | Type | Description |
---|---|---|---|---|---|---|
TC-CFO-0124-00035 | Denied | 01/26/2024 | N/A | Certificate of Occupancy | This project needs the okay for a Temporary Certificate of Occupancy from a Building Inspector, Fire Inspector, and Engineering Inspector and the Temporary Certificate of Occupancy (TCO) level for the building. Please re-request 3 story Climate controlled self storage facility with exterior canopy covered RV storage and site. | |
TF-FCP-0223-00353 | Void | 02/01/2023 | N/A | Fire Construction Permit | VOID-Resubmitted Permit#TF-FCP-0323-00489-New Wet Pipe Fire Sprinkler System | |
TF-FCP-0223-00359 | Void | 02/03/2023 | N/A | Fire Construction Permit | VOID-YOU ALREADY SUBMITTED PERMIT#TF-FCP-0223-00353 WHICH YOU NEED TO ATTACH COT BUSINESS LICENSE - Install new wet pipe fire sprinkler system | |
TC-COM-0223-00591 | Issued | 02/06/2023 | 03/26/2024 | Commercial Building | New Carport Shade structures | |
TC-CFO-0224-00045 | Issued | 02/06/2024 | 06/07/2024 | Certificate of Occupancy | 3 story Climate controlled self storage facility with exterior canopy covered RV storage and site im | |
TR-UTL-0223-00967 | Complete | 02/24/2023 | 07/11/2023 | Right-of-Way (ROW) - Utility | 24HR CLOSURE - 2 trenches- 2"W X 4'D X 40"L for water lines asphalt crossing on Fort Lowell. No Night Work | |
TF-FCP-0223-00427 | Complete | 02/27/2023 | 04/04/2024 | Fire Construction Permit | New fire alarm system. | |
TF-FCP-0224-00158 | Complete | 02/28/2024 | 09/28/2024 | Fire Construction Permit | ERRCS(Emergency Radio Response Coverage System) A Donor. Antenna installed on the roof takes signal and brings it to a BDA(Bi-Directional Amplifier) which is distributes radio signal throughout the buildings through DAS(Distributed Antenna System). | |
TR-UTL-0323-01041 | Complete | 03/08/2023 | 04/30/2023 | Right-of-Way (ROW) - Utility | WO T47999. TEP to install new 70ft pole. Permit already approved TR-UTL-1022-00039, but expires on 03/12/23. | |
TF-FCP-0323-00489 | Complete | 03/21/2023 | 03/28/2024 | Fire Construction Permit | Install new wet pipe fire sprinkler system | |
TC-CFO-0324-00072 | Void | 03/22/2024 | N/A | Certificate of Occupancy | 3 story Climate controlled self storage facility with exterior canopy covered RV storage and site im | |
TR-UTL-0323-01173 | Complete | 03/27/2023 | 06/11/2023 | Right-of-Way (ROW) - Utility | 24HR Trench 2'W X 8'D X 40'L for 1 sewer line in asphalt crossing on Fort Lowell. No night work. | |
TF-FCP-0423-00605 | Complete | 04/18/2023 | 12/19/2023 | Fire Construction Permit | install fireline to building connect to riser | |
TF-FCP-0423-00612 | Void | 04/19/2023 | N/A | Fire Construction Permit | VOID-Resubmit on Permit#TF-FCP-0423-00605 and plans need to have Contractor Logo on Plans-Install 6 inch fire from city valve to riser at bldg | |
T22CM04051 | Issued | 05/26/2022 | 11/19/2024 | Commercial Building | Public sewer | |
TR-UTL-0523-01685 | Complete | 05/31/2023 | 07/07/2023 | Right-of-Way (ROW) - Utility | Remove and replace 70’of 4’ sidewalk. Trench and install electrical conduit trench in dirt 70’L X 3’D X 2’W*** | |
TR-UTL-0623-01723 | Complete | 06/06/2023 | 09/25/2023 | Right-of-Way (ROW) - Utility | Cox to trench 9' to install CATV conduit for system tie. | |
TF-FCP-0623-00740 | Void | 06/07/2023 | N/A | Fire Construction Permit | VOID-PLEASE RESUBMIT UNDER PERMIT#TF-FCP-0323-00489-Install new wet pipe fire sprinkler system | |
TS-PRM-0623-00387 | Complete | 06/29/2023 | 10/05/2024 | Sign - Permanent | x1 illuminated channel letter wall sign & x1 pylon sign ( extension not needed, expiry date is actually 2/16/24 - system updated - Sign Magic - permit TS-PRM-0623-00387) | |
DP21-0173 | Complete | 07/01/2021 | 03/19/2027 | Development Package | Site/Grading/Swppp - Foothills RV and Storage. | |
TR-UTL-0723-02110 | Complete | 07/25/2023 | 10/30/2023 | Right-of-Way (ROW) - Utility | 24HR CLOSURE - 2 trenches- 2"W X 4'D X 40"L for water lines asphalt crossing on Fort Lowell. No Night Work *** PREV PERMIT # TR-UTL-0223-00967 | |
TR-UTL-0823-02176 | Complete | 08/01/2023 | 09/20/2023 | Right-of-Way (ROW) - Utility | Remove and replace 70’of 4’ sidewalk. Trench and install electrical conduit trench in dirt 70’L X 3’D X 2’W*** CONTINUATION PERMIT #TR-UTL-0523-01685 | |
T22CM07359 | Issued | 09/24/2022 | 11/11/2023 | Commercial Building | Install temporary power to new construction. | |
TR-UTL-1022-00039 | Complete | 10/28/2022 | 03/12/2023 | Right-of-Way (ROW) - Utility | TEP to install new 70ft pole with 42" diameter in ROW. | |
T21CM09907 | Complete | 12/28/2021 | 11/20/2024 | Commercial Building | 3 story Climate controlled self storage facility with exterior canopy covered RV storage and site im |